Project information
Summary of work
- Replace 4 culverts located north of Goodridge
Traffic impacts
- Detour
- Intersections/crossings are closed during construction at each location
- The entire intersection may be closed while crews operate at each location, but no more than two locations will be closed at the same time.
- At least one of the intersections at 260th and 270th Street will remain open at all times as well.