Hwy 27—Osakis area

I-94 in Douglas County to Hwy 71 in Todd County

Watch for work crews, gravel road surfaces

April 1, 2020 - MnDOT will repair deteriorating pavement on this stretch of Hwy 27 between Osakis and Hwy 71 south of Long Prairie, caused by the early spring freeze/thaw cycle. Some areas will remain gravel until asphalt plants are operational in May. Here's what to expect:

  • Workers, heavy moving equipment with periodic weekday daylight lane or shoulder closures
  • Warning road signs, reduced speeds and gravel road surfaces
  • Check 511mn.org for current statewide road conditions

Improve road, bridges

MnDOT will reconstruct and improve 14 miles of Hwy 27 between I-94 near Osakis and Hwy 71 south of Long Prairie in Douglas and Todd counties. Work is scheduled for 2022.

  • Project location map
    The Lake Wobegon Trail bridge over Hwy 27 in Osakis was built by the railroad in 1939. Hwy 27 has a 14 ft height clearance at the bridge, which is below today's standards.

    Summary of work

    • Reconstruct the road surface (full-depth reclaim) and widen shoulders from Douglas CR 82/Todd CR 51 to Hwy 71
    • Reconstruct three bridges over waterways near Osakis, includes the bridge over the Sauk River east of Todd CR 37
    • Reconstruct the Lake Wobegon Trail bridge over Hwy 27 in Osakis
    • Resurface the road and shoulders (mill and overlay) from Douglas CR 82/Todd CR 51 in Osakis and I-94
    • Repair or replace drainage pipes
    Project location map
    Improve Hwy 27 in Todd and Douglas counties in 2022.Click on map for pdf version