About this project
Hwy 5 from north of 5th Street in Green Isle to Hwy 212 will be resurfaced in late summer 2020 to provide a smoother road surface, improved drainage and safer rural intersections. Traffic will be detoured during construction.
Summary of work
- Repave road
- Repair multiple culverts throughout the project
- Add centerline and shoulder rumble strips
- Extend turn lanes at various locations