Minnesota Department of Transportation

511 Travel Info

Hwys 19 and 71

Redwood Falls

Project complete

Project summary

  • Construction of continuous two-way left turn lane from Cook Street to Patton Street
  • New signal system at CR 101
  • Replacement of signal at Dekalb Street
  • Replacement of signal at Swain Street
  • ADA improvements (pedestrian ramps, sidewalks and driveways) from just west of South Minnesota Street to Patton Street
  • ADA improvements (pedestrian ramps, sidewalks and driveways) from West 11th Street to Highway 71

Contractor

Cost

  • $5.3 million