Current

All traffic impacts are tentative and weather dependent. Motorists are advised to follow posted speed limits; fines are up to $300 in work zones.

Lane closures

Mon, Oct. 14 through November
  • Watch for overnight lane closures on I-94 in both directions between Co. Rd. 8 in Hasty and Hwy 25 in Monticello
    • EB I-94 will be reduced to one lane overnight between 6 p.m. and noon the following day
    • WB I-94 will be reduced to one lane overnight between 5 p.m. and 10 a.m. the following day
Sept. 3 through November
  • Watch for overnight lane closures on WB I-94 between I-494 and Hwy 241
    • Note: The closures will occur between 7 p.m. and noon. There are no lane closures Saturday evenings.
  • Watch for overnight lane closures on EB I-94 between Hwy 241 and I-494
    • Note: The closures will occur between 7 p.m. and 5 a.m. nightly. There are no lane closures on Saturday evenings.
Sept. 5 through Fri, Nov. 1; 7 p.m. to 7 a.m. nightly
  • I-94 is reduced to a single lane in both directions between Hwy 25 in Monticello and Hwy 241 in St. Michael

Upcoming

Information about upcoming traffic impacts will be provided as details become available. Motorists can expect narrow, temporary lanes, reduced speeds, non-rush hour lane closures, occasional ramp closures and delays.

About this project

Four work areas in a 39-mile stretch of I-94 between Maple Grove and Clearwater to reduce congestion, improve safety, improve freight traffic, enhance economic vitality and provide a smoother ride.

Summary of work

  • Freeway reconstruction
  • Add lanes
  • Construct Dayton Parkway interchange
  • Rebuild bridges
  • Add concrete barrier

More about work done in each area

Maple Grove to Rogers (2020-2021)
  • Widen freeway shoulders to build temporary lanes in 2019
  • 9 miles of concrete resurfacing between I-494 interchange and Hwy 101
  • Add lane in each direction between Hwy 610 and Hwy 101
  • Build four noise walls in Maple Grove
Dayton Parkway interchange (2020-2021)
  • Build interchange
  • Build trail and sidewalks
St. Michael to Albertville (2019-2021)
  • Reconstruct 6 miles of freeway between Hwy 241 and Wright Co. Rd. 19
  • Reconstruct I-94 bridges over Wright Co. Rd. 19
  • Add new ramp from Co. Rd. 19 to EB I-94
  • Reconstruct Hwy 241 bridge over I-94, add new loop ramp from WB I-94 to SB Hwy 241
  • Add lane on EB I-94 between Wright Co. Rd. 19 and Hwy 241, and on WB I-94 between Hwy 241 and Wright Co. Rd. 37
  • Add raised concrete median barrier
  • Build stormwater basins to improve drainage
Monticello to Clearwater (2019-2021)
  • Reconstruct 14 miles of freeway between Hwy 25 and Hwy 24
  • Add lane in both directions
  • Add cable median barrier between Monticello and Clearwater
  • Build noisewall along north side of WB I-94, west of Hwy 25
  • Add commercial vehicle weigh-in motion sensors into the new pavement
  • Improve drainage, including new water retention ponds