Minnesota Department of Transportation

511 Travel Info

Highway 55 Bridge

Plymouth

Traffic impacts

All traffic impacts are tentative and weather dependent.

Highway 55 bridge over the Luce Line Trail in Plymouth project location map

Hwy 55 bridge in Plymouth project location map.

Click map for larger version.

Current

Lane closures

Mon, July 6 through Fri, Aug. 14
  • WB Hwy 55 is reduced to a single lane at the bridge over the Luce Line Trail
    • Watch for flaggers and traffic delays

Trail closures

Mon, July 6 through Fri, Aug. 14
  • The Luce Line Trail is closed at the bridge
    • Follow detour

Upcoming

Information about upcoming traffic impacts will be posted as details become available. Motorists can expect lane closures and pedestrians can expect trail closures.

About this project

Crews will make repairs to the WB Hwy 55 bridge over the Luce Line Trail in Plymouth. The work includes concrete repairs, bridge joint replacement and improvements to the barriers.

Summary of work

  • Concrete repairs
  • Barrier improvements
  • Bridge joint repairs