Minnesota Department of Transportation

511 Travel Info

Highway 7 Drainage Improvement

Victoria

Traffic impacts

Highway 7 between Merrywood Lane and Waterford Lane in Victoria project location map

Hwy 7 in Victoria project location map.

Click map for larger version.

Upcoming

Information about upcoming traffic impacts will be posted as details become available. Motorists can expect a three-month closure of EB Hwy 7 between Merrywood Ln. and Waterford Ln. and two week closure of WB Hwy 7; two weekend full closures of Hwy 7. Expect detours. All traffic impacts are tentative and weather dependent.

About this project

Crews will make improvements on Hwy 7 between Merrywood Ln. and Waterford Ln. to improve drainage in the area. Crews will repair the slope between Hwy 7 and Lake Zumbra, rebuild shoulders, curb and gutter. They will also install new guard rail. Some trees in the area will have to be removed to allow for the work.

Summary of work

  • Reconstruct shoulder
  • Install curb and gutter and improve drainage
  • Install guard rail
  • Reinforce slope to the lake