Minnesota Department of Transportation

511 Travel Info

I-94 ADA pedestrian ramps and sidewalk improvements

St. Paul

Pedestrian impacts

Current

Sidewalk improvements

May through July
  • Watch for sidewalk improvements on the east side of Fairview Ave. between Iglehart Ave. and Carroll Ave.
  • Watch for sidewalk improvements on the east side of Prior Ave. between University Ave. and Oakley Ave.
  • Watch for ADA improvements on both sides of Victoria St. between St. Anthony Ave. and Concordia Ave.

Upcoming

Information about upcoming traffic impacts will be posted when details become available. All pedestrian and traffic impacts are tentative and weather dependent.

About this project

MnDOT will replace sections of sidewalk in state highway right-of-way along St. Anthony Ave. (north of I-94)  and Concordia Ave. (south of I-94). Replacement will upgrade the sidewalk and approaches to meet Americans with Disability Act (ADA) standards. This project will not replace all sidewalk within the project area.

Summary of work

  • ADA pedestrian ramps and sidewalks improvements along St. Anthony Ave. and Concordia Ave. between Western Ave. and Hwy 280 in St. Paul
  • Limited tree removal and replacement