Construction completed in 2016

Completed projects on Minnesota highways

Updated Jan. 19, 2017

Know your region? Make this list a little shorter by selecting a region below or from the map.








District Offices MnDOT District 7 - Mankato/Windom Metro District - St Paul/Minneapolis MnDOT District 8 - Marshall/Wilmar/Hutchinson MnDOT District 1 - Duluth/Virginia MnDOT District 4 - Detroit Lakes/Morris MnDOT District 2 - Bemidji/Crookston MnDOT District 3 - Baxter/St Cloud MnDOT District 6 - Rochester/Owatonna

Hwys 1–9

Hwy 1

COMPLETE: Hwy 1 detour east of Goodridge

Description: 22-mile detour located between Hwy 89 and Pennington County Road 28

Construction dates: July 5 - October 2016

Traffic impacts: Detour

More information: mndot.gov/d2/projects/hwy1goodridge/

Hwy 3

COMPLETE: Hwy 3 in Farmington and Empire Township

Description: Resurfacing, add traffic signals and bike trail, update pedestrian crossings

Construction dates: June-early November 2016
Traffic impacts: Delays, lane closures, detours

More information: mndot.gov/metro/projects/hwy3farmington/

COMPLETE: Hwy 3, Hwy 298, Hwy 299

Description: Resurface pavement in Northfield, Faribault

Construction dates: May-August 2016

Hwy 5

COMPLETE: Hwy 5 in St. Paul, near Fort Snelling

Description: Redeck the bridge, refurbish bridge rails and improve drainage structures

Construction dates: April 2015 - October 2016

Traffic impacts: Road closures, lane closures, ramp closures, detours

More information: mndot.gov/metro/projects/hwy5/

COMPLETE: Hwy 5, Hwy 101 - Chanhassen

Description: Construct acceleration lane to improve merge, ADA improvements

Construction dates: April - August 2016

Traffic impacts: Temporary lane closures and detours

More information: mndot.gov/metro/projects/hwy5chanhassen/

COMPLETE: Hwy 5 and Post Rd

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

Hwy 6

COMPLETE: Hwy 6 north of Crosby

Description: Resurface six miles of road

Construction dates: August 2016

Traffic impacts: Lane closures, flaggers, pilot car

Hwy 7

COMPLETE: Hwy 7 - Shorewood, St. Louis Park

Description: Replace signs

Construction dates: April-July 2016

Traffic impacts: Off-peak lane closures

COMPLETE: Hwy 7 and I-494

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: Hwy 7 and Hwy 169

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

Hwy 8

COMPLETE: Hwy 8 - Shafer, Franconia, Taylors Falls

Description: Resurface road and construct a single-lane roundabout

Construction dates: Spring-late fall 2016

Traffic impacts: Road closures, detours and lane closures

More information: mndot.gov/metro/projects/hwy8/

Hwy 9

COMPLETE: Hwy 9 New London to Sunburg

Description: Resurface highway, bridge improvements

Construction dates: August-September 2016

More information: mndot.gov/d8/projects/hwy9/

COMPLETE: Hwy 9 bridge over Wild Rice River, near Ada

Description: Replace bridge and raise elevation

Construction dates: June-October 2016

Traffic impacts: Detour

Hwys 10–19

Hwy 10 in the Twin Cities Metro

COMPLETE: Hwy 10 at Armstrong Blvd (County Road 83) in Ramsey

Description: Construct interchange

Construction dates: Spring 2015 - Spring 2016
Traffic impacts: Interchange is now open. Occasional closures in Spring 2016.

COMPLETE: Hwy 10 east of Becker

Description: Realign and improve 137th St SE to Hwy 10, east of Becker in Sherburne County. Project led by Becker Township.

Construction dates: Oct. 24 - Nov. 12, 2016
Traffic impacts: Lane closures, flaggers or access detour, follow signs.

More information: http://www.dot.state.mn.us/d3/newsrels/16/10/21-hwy10.html

COMPLETE: Hwy 10 at Hwy 61 - Hastings

Description: Resurface road, add turn lanes, realign Maycrest Ave and update drainage

Construction dates: July - November 2016
Traffic impacts: Road and lane closures

More information: mndot.gov/metro/projects/hwy61and10/

COMPLETE: Hwy 10 between I-694 and I-35W in Arden HIlls

Description: Install cable median barrier, remove median crossovers between CR 96 and I-35W

Construction dates: Oct. 31- late-November 2016
Traffic impacts: Shoulder closures with minimal traffic impacts

More information: kent.barnard@state.mn.us

COMPLETE: Hwy 10 between Thurston Ave and Fairoak Ave in Anoka

Description: Pedestrian safety improvements

Construction dates: Sept. 6 - early-November 2016
Traffic impacts: Non-peak lane closures

More information: mndot.gov/metro/projects/hwy10anoka/

Hwy 10 in Greater Minnesota

COMPLETE: Hwy 10/Hwy 59 and Frontage Road in Detroit Lakes

Description: Resurface Hwy 10 from Airport Rd to Hwy 59, reconstruct frontage road along Hwy 10, construct bridge on Hwy 59

Construction Dates: Spring 2016
Traffic impacts: Lane closures

More information: mndot.gov/d4/projects/dlfrontageroad

COMPLETE: Hwy 10/Hwy 75 in Moorhead

Description: Construct turn lanes, replace sidewalks, improve pedestrian accessibility, upgrade signals, resurface

Construction Dates: April-Summer 2016
Traffic impacts: Detour, lane closures, sidewalk detours

Hwy 11

COMPLETE: Hwy 11 Baudette to Pitt

Description: Resurface Hwy 11

Construction dates: June-October 2016

More information: mndot.gov/d2/projects/hwy11-baudette/

Hwy 12

COMPLETE: Hwy 12 Benson to Kerkhoven

Description: Resurface 16 miles of Hwy 12

Construction dates: July-October 2016

More information: mndot.gov/d4/projects/hwy12/

COMPLETE: Hwy 12 Willmar to Atwater

Description: Resurface Hwy 12, construct left turn lane at intersection of Hwy 12 and Kandiyohi County Rd 4

Construction dates: May-July 2016

Traffic impacts: Lane closures, flaggers directing traffic

More information: mndot.gov/d8/projects/hwy12willmartoatwater/

COMPLETE: Hwy 12 - Independence

Description: Add left turn lanes and a median barrier

Construction dates: July-October 2016

Traffic impacts: Off-peak lane closure, flagged one-way traffic

More information: mndot.gov/metro/projects/hwy12safetyimprovements2016/

Hwy 13

COMPLETE: Hwy 13 at Annapolis Street in Lilydale

Description: Drainage repair

Construction dates: End of January through March of 2016

Traffic impacts: Shoulder closures with minimal traffic impacts

More information: kirsten.klein@state.mn.us

COMPLETE: Hwy 13 over Hwy 77 in Eagan

Description: Replace bridge joints

Construction dates: May (dates are tentative)

Traffic impacts: Lane closures for two weeks in May
More information: mndot.gov/metro/projects/bridgejoints2016

COMPLETE: Hwy 13 south of Hwy 99

Description: Reconstruct small section of road

Construction dates: July-August 2016

Hwy 14

COMPLETE: Hwy 14 from SD state line to Lake Benton

Description: Resurface and chip seal highway, replace guardrail, storm sewer work, slope grading

Construction dates: September-October 2016

Traffic impacts: Detour, alternating lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy14sdtolakebenton/

COMPLETE: Hwy 14, Hwy 330 near Revere

Description: Resurface highway from Revere to Brown County line, overlay all of Hwy 330, update guardrail

Construction dates: September-November 2016

Traffic impacts: Alternating lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy14andhwy330/

COMPLETE: Hwy 14 Nicollet to North Mankato

Description: Build 4-lane expansion with bypass of Nicollet/Hwy 111 interchange

Construction dates: July 2015-November 2016

Traffic impacts: Detour (2 months starting in July)

More information: mndot.gov/d7/projects/14newulmtonmankato/

COMPLETE: Hwy 14/Hwy 61 and Gilmore Ave in Winona

Description: Replace signal system at highway intersection

Construction dates: May 9-September 2016

More information: mndot.gov/d6/projects/hwy61winona/

COMPLETE: Hwy 14 Chester to St. Charles

Description: Resurface 15 miles of Hwy 14

Construction dates: July-September 2016

COMPLETE: Hwy 14, I-35 south of Owatonna

Description: Replace 9 bridges on I-35, Hwy 14

Construction dates: September 2016-September 2018 work will resume in 2017

COMPLETE: Hwy 14 in Eagle Lake

Description: Reconstruct 3 intersections

Construction dates: May-September 2016

COMPLETE: Old Hwy 14 in Janesville

Description: Restore urban section for turnback

Construction dates: April-November 2016

Traffic impacts: Detour to city streets

Hwy 15

COMPLETE: Hwy 15 St. Cloud, Sartell

Description: Resurface from Hwy 23 (Division St) in St. Cloud to Benton Dr, N of the Mississippi River in Sartell, improve intersections, add or extend turn lanes, improve signals

Construction dates: Mid-April through mid-September 2016

Traffic impacts: Expect intermittent lane closures as crews wrap-up the project. Stearns CR 1, west of Hwy 15 in Sartell is detoured through Oct. 15. Follow detour signs.

More information: mndot.gov/d3/stc/

COMPLETE: Hwy 15, 19, 71 concrete rehabilitation

Description: Concrete rehabilitation

Construction dates: September-October 2016

Traffic impacts: Detour required for some work, lane closures, pilot car with flaggers directing traffic

More information: mndot.gov/d8/projects/2016concreterehabs/

COMPLETE: Hwy 15 at I-94 in St. Cloud

Description: Resurface the I-94 bridges over Hwy 15

Construction dates: April–Aug. 12, 2016
Traffic impacts: I-94 reduced to single lane, bypass lanes

More information: mndot.gov/d3/i94/

Hwy 19

COMPLETE: Hwy 19 near Henderson

Description: Replace bridge over the Union Pacific Railroad

Construction dates: May-November 2016
Traffic impacts: Closures, detours

More information: mndot.gov/d7/projects/hwy19henderson/

COMPLETE: Hwy 19 Morton to Fairfax

Description: Resurfacing with ADA improvements

Construction dates: May-July 2016
Traffic impacts: Closures, delays

More information: mndot.gov/d8/projects/hwy19hwy68/

COMPLETE: Hwy 19 from SD state line to Ivanhoe

Description: Resurface highway, replace culverts

Construction dates: July-August 2016
Traffic impacts: Detour, alternating lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy19ivanhoe/

COMPLETE: Hwy 19 from Jct of Hwy 67 to Redwood Falls

Description: Resurface highway, install curb cuts and truncated domes at intersections and update pedestrian crossings to meet modern ADA standards

Construction dates: September-October 2016
Traffic impacts: Alternating lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy19redwoodfalls/

COMPLETE: Hwy 19, 15, 71 concrete rehabilitation

Description: Concrete rehabilitation

Construction dates: September-October 2016

Traffic impacts: Detour required for some work, lane closures, pilot car with flaggers directing traffic

More information: mndot.gov/d8/projects/2016concreterehabs/

Hwys 20–29

Hwy 23

COMPLETE: Hwy 23 from I-90 to Willmar

Description: Passing lane construction

Construction dates: April-October 2016
Traffic impacts: Closures, delays

More information: mndot.gov/d8/projects/hwy23passinglanes

COMPLETE: Hwy 23 Marshall Safety Study

Description: To develop a common vision and guidance for managing the Hwy 23 corridor now and into the future.

Construction dates: January–Fall 2016
Traffic impacts: None at this time.

More information: mndot.gov/d8/projects/hwy23marshallstudy/

Hwy 25

COMPLETE: Hwys 25, 55 in Buffalo

Description: Reconstruct Hwy 25 between Catlin St and 3rd St N, includes the intersection of Hwy 25/Hwy 55.

  • MnDOT to reconstruct Hwy 25 from Hwy 55 to Catlin St, includes the intersection of Hwy 25/Hwy 55

Construction dates: April–November 2016

Traffic impacts: New roadway open with periodic daytime lane closures as crews complete work.

More information: mndot.gov/d3/buffalo/

COMPLETE: Hwy 25 at County Rd 75 in Monticello

Description: The city of Monticello to add turn lanes and install improvements at the intersection of Hwy 25 and CR 75 (Broadway).

Construction dates: April–July 2016

Traffic impacts: Lane closures

More information: www.mndot.gov/d3/monti/

Hwy 27

COMPLETE: Hwy 27 Onamia to Isle

Description: Resurface 10 miles of Hwy 27 from north junction Hwy 169 in Onamia/Cove to Hwy 47 in Isle, along the south shore of Mille Lacs Lake. Make drainage repairs, add new left-turn lanes at the intersection of Hwy 27/Hwy 47 in Isle and upgrade accessibility in Wahkon and Isle.

Construction dates: Aug. 29–Nov. 10, 2016
Traffic impacts: Lane closures, flaggers, pilot car

More information: mndot.gov/d3/2016/h169/#isle

COMPLETE: Hwy 27 east of Little Falls

Description: Replace bridge at Rice Creek five miles east of Hwy 10 in Little Falls.

Construction dates: July-late-Oct.
Traffic impacts: Detour, lane closures, flaggers

More information: mndot.gov/d3/2016/h27/

Hwy 29

COMPLETE: Hwy 29 and I-94 in Alexandria

Description: Bridge replacement, roadway widening, access improvements, ADA improvements, county highway realignment, turn lane construction, culvert replacement, signals/lighting replacement

Construction dates: July 2015–2016
Traffic impacts: Closures, delays

More information: mndot.gov/d4/projects/alexi94hwy29/

COMPLETE: Hwy 29 in Parkers Prairie

Description: Reconstruction and accessibility improvements

Construction dates: June–October 2016

More information: mndot.gov/d4/projects/parkersprairie/

Hwys 30-39

Hwy 30

COMPLETE: Hwy 30 between Hayfield and Rochester

Description: Replace bridge, improve approaches, resurface pavement

Construction dates: June–September 2016

More information: mndot.gov/d6/projects/hwy30-bridge

Hwy 32

COMPLETE: Hwy 32 Fertile to N Jct of Hwy 200

Description: Apply 15-mile sealcoat

Construction dates: Summer 2016

Hwy 33

COMPLETE Hwy 33 in Cloquet

Description: Resurfacing, accessibility, signal improvements

Construction dates: July 11–Aug. 26, 2016
Traffic impacts: Daytime lane closures Monday through Friday at noon

More information: mndot.gov/d1/projects/hwy33cloquet

Hwy 34

COMPLETE: Hwy 34 from Hwy 59 in Detroit Lakes to County Rd 29

Description: Construct center left-turn lanes, improve pedestrian accessibility, resurface

Construction dates: July–November 2016
Traffic impacts: Lane closures
More information: mndot.gov/d4/projects/hwy34dl/

I-35

COMPLETE: I-35 in Pine County

Description: Resurface pavement and replace bridge

Construction dates: April–November 11, 2016
Traffic impacts: Head-to-head traffic

More information: mndot.gov/d1/projects/I-35-Pine-County/

COMPLETE: I-35, Hwy 61, Hwy 194 in St. Louis and Lake Counties

Description: Resurface pavement and drainage repairs

Construction dates: May 9–Aug. 31, 2016
Traffic impacts: Lane restrictions, ramp closures

More information: mndot.gov/d1/projects/I-35-Hwy61-Hwy-194-Resurfacing/

COMPLETE: I-35 Rush City to Pine County line

Description: Install cable median barriers

Construction dates: September–November 2016
Traffic impacts: Off-peak lane closures

More information: denise.workcuff@state.mn.us

COMPLETE FOR 2016: Hwy 14, I-35 south of Owatonna

Description: Replace 9 bridges on I-35, Hwy 14

Construction dates: September 2016–September 2018

Traffic impacts: Lane closures, delays, single-lane crossover traffic in 2017, 2018

COMPLETE: I-35 from south of Geneva to south of Hope

Description: Install cable median barrier

Construction dates: September-October 2016

I-35E

COMPLETE: I-35E and I-694 in Little Canada, Vadnais Heights

Description: Paint noise walls along I-694 and I-35E Commons

Construction dates: July 2015-mid-July 2016

Traffic impacts: Shoulder closures, ramp closure from Little Canada Road to I-35E
More information: kent.barnard@state.mn.us

COMPLETE: I-35E from Kettle Park to South of Kings Rd in Eagan

Description: Construct a concrete noise wall and guardrail end treatments

Construction dates: October-Dec. 5, 2015 and March-June 2016

Traffic impacts: Minimal traffic impacts

COMPLETE: I-35E — Randolph Ave, St. Clair Ave, eastbound Grand Ave, and Ramsey St/Grand Ave bridges in St. Paul

Description: Repair and resurface bridges

Construction dates: June 6-mid-October 2016

Traffic impacts: Delays, closures
More information: mndot.gov/metro/projects/i35ebridges/

COMPLETE: I-35E from County Rd 11 in Burnsville/Apple Valley to I-494 in Eagan

Description: Upgrade traffic signals

Construction dates: June-July 2016

Traffic impacts: Short-term lane closures
More information: kirsten.klein@state.mn.us

COMPLETE: I-35E at Diffley Rd in Eagan

Description: Realign southbound exit ramp, replace traffic signals, upgrade accessibility

Construction dates: May-June 2016

Traffic impacts: Ramp closure and detours

COMPLETE: I-35E and I-494

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

I-35W

COMPLETE: I-35W in northeast Minneapolis

Description: Pavement repair on Hennepin Ave., Johnson St., Broadway Ave. and Summer St. pedestrian bridge

Construction dates: May-late-August 2016
Traffic impacts: Directional lane closures, pedestrian bridge closure

More information: mndot.gov/metro/projects/i35wnemplsbridges

COMPLETE: I-35W and County Rd E2 in New Brighton

Description: Replace County Rd E2 bridge

Construction dates: Spring 2016
Traffic impacts: Delays, closures
More information: mndot.gov/metro/projects/cre2overi35wnewbrighton/

COMPLETE: I-35W and County Rd H in Arden Hills, Mounds View

Description: Replace bridge crossing I-35W, rebuild interchange

Construction dates: Spring 2016-late-fall 2016
Traffic impacts: Delays, ramp and lane closures
More information: mndot.gov/metro/projects/crhoveri35wardenhills/

COMPLETE: I-35W in Roseville, Arden Hills and New Brighton

Description: Repave I-35W between Hwy 36 and I-694

Construction dates: Spring 2016
Traffic impacts: Delays, closures
More information: mndot.gov/metro/projects/i35wardenhills/

COMPLETE: I-35W from 42nd St. in Minneapolis to 66th St. in Richfield

Description: Landscaping

Construction dates: April-June 2016
Traffic impacts: Shoulder closures
More information: nick.carpenter@state.mn.us

Hwy 36

COMPLETE: Hwy 36 in Roseville

Description: Replace current Hwy 36 bridge with two new bridges, reconstruct and resurface ramps and roadway, replace signal systems at Lexington Avenue

Construction dates: Spring 2016-November 2016
Traffic impacts: Delays, closures

More information: mndot.gov/metro/projects/hwy36roseville/

Hwy 37

COMPLETE: Hwy 37, 61, 135, 73, 169, 53 Grand Marais to Grand Portage

Description: Maintain, improve drainage systems

Construction dates: Mid-May to mid-October, 2016

Traffic impacts: Lane closures controlled by signals or flaggers

More information: mndot.gov/d1/projects/Hwy61-grandmarais-grandportage

Hwy 39, Wis. Hwy 105

COMPLETE: Oliver Bridge (CN Railroad) St. Louis County

Description: Rehabilitate railroad bridge between Minnesota and Wisconsin

Construction dates: April-November 2016

Traffic impacts: Closed 8 a.m. to 5 p.m. Mondays through Fridays

More information: mndot.gov/d1/projects/Oliver-Bridge-Rehabilitation

Hwys 40-59

Hwy 42

COMPLETE: Hwy 42 in Elgin

Description: Replace bridge

Construction dates: July-November 2016

Traffic impacts: Detour
More information: mndot.gov/d6/projects/hwy42-bridge/

Hwy 46

COMPLETE: Hwy 46 near County Rd 13 at the Popple River

Description: Resurface pavement, install new box culvert

Construction dates: July-August 2016

More information: mndot.gov/d2/projects/hwy46alvwood/ 

Hwy 47

COMPLETE: Hwy 47, Hwy 65 in Minneapolis (University & Central Avenues)

Description: Reconstruct the signal systems and sidewalk ramps to comply with ADA requirements at six intersections on Hwy 47/University Ave. and Hwy 65/Central Ave.

Construction dates: July-November 2016
Traffic impacts: Off-peak lane closures, local road closures, sidewalk closures

More information: mndot.gov/metro/projects/hwy47andhwy65

COMPLETE: Hwy 47 at 142nd Street in Ramsey

Description: Safety improvements at the intersection of Highway 47 and 142nd Ave.

Construction dates: Aug. 22-late Sept, 2016
Traffic impacts: Delays, closures

More information: mndot.gov/metro/projects/hwy47/

Hwy 52 in the Twin Cities Metro

COMPLETE: Hwy 52 at County Rd 86 in Randolph Township

Description: Construct interchange

Construction dates: June-November 2016

Traffic impacts: Lane closures, weekend full closures and detours
More information: www.co.dakota.mn.us/Transportation/CurrentConstruction/CR86/Pages/default.aspx

COMPLETE: Hwy 52 from Thompson Ave to Mendota Rd

Description: Resurface road and sidewalks, upgrade underground water, sewer and electrical utilities

Construction dates: June-November 2016

Traffic impacts: Lane closures, weekend full closures and detours
More information: wspmn.gov/729/Robert-St-Improvements

Hwy 52 in Greater Minnesota

COMPLETE: Hwy 52/Hwy 63 Interchange in Rochester

Description: Replace existing bridge decks and upgrade Hwy 52 northbound lane additions near the end of the bridge

Construction dates: Spring-November 2016
Traffic impacts: Detour

More information: mndot.gov/d6/projects/hwy52-63-interchange/

COMPLETE: Hwy 52 in Rochester

Description: Replace striping along corridor

Construction dates: April-May 2016

COMPLETE: Hwy 52 from Pine Island to Zumbrota

Description: Resurface southbound lanes

Construction dates: May-June 2016

Hwy 53

COMPLETE: Hwy 53 from County Road 93 and Hwy 37 in St. Louis County

Description: Resurface pavement

Construction dates: Sept. 7 to late-Oct. 2016
Traffic impacts: Single-lane traffic

More information: mndot.gov/d1/projects/Hwy53-Resurface

COMPLETE: Hwy 53 in St. Louis County

Description: Resurface pavement, repair drainage, ADA and safety improvements

Construction dates: May-July 15, 2016
Traffic impacts: Temporary lane closures, flaggers

More information: mndot.gov/d1/projects/Hwy53-Resurfacing-Eveleth-Virginia

COMPLETE: Hwy 53 near Cotton

Description: Resurface pavement

Construction dates: May-June 2016
Traffic impacts: Lane closures

More information: mndot.gov/d1/projects/Hwy53-Resurfacing

COMPLETE: Hwy 53 from Haines Rd to Midway Rd in Duluth

Description: Accessibility, signal improvements

Construction dates: Aug. 8 - Nov. 4, 2016
Traffic impacts: Single-lane traffic

More information: mndot.gov/d1/projects/Hwy53-6916-104/

COMPLETE: Hwy 53, 37, 61, 135, 73, 169 Grand Marais to Grand Portage

Description: Maintain, improve drainage systems

Construction dates: Mid-May to mid-October, 2016

Traffic impacts: Lane closures controlled by signals or flaggers

More information: mndot.gov/d1/projects/Hwy61-grandmarais-grandportage

Hwy 55

COMPLETE: Hwy 55 over railroad/Luce Line Trail in Plymouth

Description: Repair bridge and columns

Construction dates: May-early July 2016
Traffic impacts: Trail closure and detour

More information: nick.carpenter@state.mn.us

COMPLETE: Hwy 55 at County Rd 14 east of Buffalo

Description: Reconstruct and widen the intersection by adding new turn lanes on Hwy 55 to Wright County Rd 14 (Dague Ave/Deegan Dr)

Construction dates: Mid-April–June 2016 
Traffic impacts: Periodic lane closures or single-lane alternating traffic on Hwy 55 with use of flaggers and pilot car through work zone. Plan for delays up to 15 minutes while flaggers hold traffic.

COMPLETE: Hwys 55, 25 in Buffalo

Description: Reconstruct Hwy 25 between Catlin St and 3rd St N, includes the intersection of Hwy 25/Hwy 55.

  • MnDOT to reconstruct Hwy 25 from Hwy 55 to Catlin St, includes  the intersection of Hwy 25/Hwy 55

Construction dates: April-November 2016

Traffic impacts: New roadway open with periodic daytime lane closures as crews complete work.

More information: mndot.gov/d3/buffalo/

COMPLETE: Hwy 55 in Annandale

Description: Construct new turn lanes at Hwy 55/Wright County Rd 3

Construction dates: Aug 15 - Nov. 2016

Traffic impacts: Lane closures, flaggers

More information: mndot.gov/d3/newsrels/16/08/9hwy55.html

COMPLETE: Hwy 55 east of Brooten

Description: Install turn lanes on Hwy 55 to Stearns County Rd 194. Work is part of a larger Stearns County project to realign County Rd 194 between Hwy 55 and Hilldale Lane east of Brooten.

Construction dates: Sept. 2016

Traffic impacts: Lane closures

COMPLETE: Hwy 55 and Hwy 100

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

Hwy 56

COMPLETE: Hwy 56 near Adams

Description: Replace 2 bridges

Construction dates: Mid-June-September 2016

More information: mndot.gov/d6/projects/hwy56-bridge

Hwy 59

COMPLETE: Hwy 59 in Morris

Description: Concrete resurfacing and intersection reconstruction

Construction dates: July-September 2016

More information: mndot.gov/d4/projects/hwy59morris

COMPLETE: Hwy 59/Hwy 10 and Frontage Road in Detroit Lakes

Description: Resurface Hwy 10 from Airport Rd to Hwy 59, reconstruct frontage road along Hwy 10, construct bridge on Hwy 59

Construction Dates: Spring 2016
Traffic impacts: Lane closures

More information: mndot.gov/d4/projects/dlfrontageroad

COMPLETE: Hwy 59 at Canadian Border to Hwy 175

Description: Resurface pavement, replace bridge, culverts, storm sewer

Construction Dates: July-September 2016

More information: mndot.gov/d2/projects/hwy59/

Complete: Hwy 59 from Iowa to south Jct of Hwy 60

Description: Reconstruct and replace culverts

Construction Dates: May-November 2016

Hwys 60-79

Hwy 61 in the Twin Cities Metro

COMPLETE: Hwy 61/ Hwy 97 in Forest Lake

Description: Reconstruct the Hwy 61/ Hwy 97 intersection

Construction dates: Fall 2015-Summer 2016 
Traffic impacts: Delays, closures

More information: mndot.gov/metro/projects/hwy61and97

COMPLETE: Hwy 61 from Hwy 8 in Forest Lake to Wyoming

Description: Apply a sealcoat

Construction dates: June-September 2016

Traffic impacts: Off-peak lane closures
More information: denise.workcuff@state.mn.us

COMPLETE: Hwy 61 at Hwy 10

Description: Resurface road, add turn lanes, realign Maycrest Ave and update drainage

Construction dates: July-November 2016

Traffic impacts: Road and lane closures
More information: mndot.gov/metro/projects/hwy61and10/

COMPLETE: Hwy 61/I-494 and Bailey Rd

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: Hwy 61 and 70th St

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

Hwy 61 in Greater Minnesota

COMPLETE: Hwy 61, I-35, Hwy 194 in St. Louis and Lake Counties

Description: Resurface pavement and drainage repairs

Construction dates: May 9–Sept. 5, 2016
Traffic impacts: Lane restrictions, ramp closures

More information: mndot.gov/d1/projects/I-35-Hwy61-Hwy-194-Resurfacing/

COMPLETE: Hwy 61, 135, 37, 73, 169, 53 Grand Marais to Grand Portage

Description: Maintain, improve drainage systems

Construction dates: Mid-May to mid-October, 2016

Traffic impacts: Lane closures controlled by signals or flaggers

More information: mndot.gov/d1/projects/Hwy61-grandmarais-grandportage

COMPLETE: Hwy 61 in Cook County four miles NE of Gunflint Trail

Description: Replace Devil Track Bridge

Construction dates: May 31-Mid-November 2016

Traffic impacts: Lane restrictions controlled by temporary signal system

More information: mndot.gov/d1/projects/Hwy-61-Devil-Track-River

COMPLETE: Hwy 61/Hwy 14 and Gilmore Ave in Winona

Description: Replace signal system at highway intersection

Construction dates: May 9-September 2016

More information: mndot.gov/d6/projects/hwy61winona/

COMPLETE: Hwy 61 in Red Wing

Description: Reconstruct road

Construction dates: March-August 2016

Hwy 62

COMPLETE: Hwy 62, I-494 in Minneapolis, Richfield and Bloomington

Description: Construct the Intercity Regional Trail (project led by Three Rivers Park District)

Construction dates: Spring 2015-November 2016

Traffic impacts: Short-term closures, delays, detours

More information: City of Bloomington website

Hwy 63

COMPLETE: Hwy 63 in Spring Valley

Description: Repair concrete pavement, storm sewer work, ADA improvements

Construction dates: April-May 2016

COMPLETE: Hwy 63 Rochester International Airport

Description: Reconstruct interchange at airport and Olmsted County Rd 16

Construction dates: August 2015-November 2016

Traffic impacts: Intermittent lane closures

Hwy 65

COMPLETE: Hwy 65, Hwy 47 in Minneapolis (University & Central Avenues)

Description: Reconstruct the signal systems and sidewalk ramps to comply with ADA requirements at six intersections on Hwy 47/University Ave. and Hwy 65/Central Ave.

Construction dates: July - Nov., 2016
Traffic impacts: Lane closures, local road closures, sidewalk closures

More information: mndot.gov/metro/projects/hwy47andhwy65

Hwy 68

COMPLETE: Hwy 68 junction of Hwy 19 to Milroy

Description: Resurfacing with accessibility improvements

Construction dates: Work begins 2016

Traffic impacts: Lane closures

More information: mndot.gov/d8/projects/hwy19hwy68/

COMPLETE: Hwy 68 from SD state line to Canby

Description: Resurfacing

Construction dates: May-June 2016

Traffic impacts: Lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy68canby/

COMPLETE: Hwy 68 Wabasso to Hwy 71

Description: Resurfacing

Construction dates: May-July 2016

Traffic impacts: Lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy68wabasso/

COMPLETE: Hwy 68 from Brown/Redwood Cty line to Hwy 4

Description: Resurfacing

Construction dates: May-July 2016

Hwy 71

COMPLETE: Hwy 71 in Jackson

Description: Reconstruct Hwy 71 north of Jackson and replace the bridge over the Des Moines River

Construction dates: May-November 18 2016

Traffic impacts: Lane closures, detour

More information: mndot.gov/d7/projects/hwy71jackson/

COMPLETE: Hwy 71 Sauk Centre to Belgrade

Description: Resurface 19 miles, install or extend turn lanes, repair/replace culverts. Excludes Elrosa

Construction dates: May 2 to late July 2016

Traffic impacts: Lane closures from sunrise to sunset, Mondays through Saturdays. Slow down and be prepared to stop. Flaggers and a pilot car will control traffic through the work zone.

More information: mndot.gov/d3/newsrels/16/04/26hwy71.html

COMPLETE: Hwy 71 south of Wadena to Bertha

Description: Resurface road from south of Wadena at the Todd/Wadena County line to Todd County Rd 24 in Bertha

Construction dates: July 25 to mid-Aug 2016

Traffic impacts: Daylight lane closures, flaggers and pilot cars

More information: mndot.gov/d3/newsrels/16/07/20hwy71.html

COMPLETE: Hwy 71 Willmar bypass

Description: Resurfacing

Construction dates: May-July 2016

Traffic impacts: Lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy71willmarbypass/

COMPLETE: Hwy 71, 15, 19 concrete rehabilitation

Description: Concrete rehabilitation

Construction dates: September-October 2016

Traffic impacts: Detour required for some work, lane closures, pilot car with flaggers directing traffic

More information: mndot.gov/d8/projects/2016concreterehabs/

Hwy 72

COMPLETE: Hwy 72 Waskish north to milepost 48

Description: Apply 12-mile sealcoat

Construction dates: Summer 2016

Traffic impacts: Temporary lane closures

Hwy 73

COMPLETE: Hwy 73, 61, 135, 37, 169, 53 Grand Marais to Grand Portage

Description: Maintain, improve drainage systems

Construction dates: Mid-May to mid-October, 2016

Traffic impacts: Lane closures controlled by signals or flaggers

More information: mndot.gov/d1/projects/Hwy61-grandmarais-grandportage

Hwy 75

COMPLETE: Hwy 75 near Kent

Description: Realign highway

Construction dates: Spring to fall 2016

Traffic impacts: Detour
More information: mndot.gov/d4/projects/hwy75kent/

COMPLETE: Hwy 75 north of Humbolt

Description: Replace bridge over Salt Coulee with box culvert and raise elevation

Construction dates: August 2016

COMPLETE: Hwy 75 Donaldson to Hallock

Description: Repair shoulder

Construction dates: Summer 2016

COMPLETE: Hwy 75 Euclid to Warren

Description: Resurface 20 miles of pavement, replace 5 culverts, construct edgeline rumble strips

Construction dates: June-September 2016

Traffic impacts: Detour

COMPLETE: Hwy 75 railroad crossing east of St. Vincent

Description: Install gates and flashing lights

Construction dates: Summer 2016

COMPLETE: Hwy 75 Canby

Description: Resurfacing

Construction dates: April-June 2016

Traffic impacts: Lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy75canby/

COMPLETE: Hwy 75/I-94 – Moorhead

Description: Reconstruct the current interchange to address mobility and capacity issues along the two corridors.

Construction dates: April-November 2016
Traffic impacts: Road work complete - some signal work ongoing

More information: mndot.gov/d4/projects/moorhead/

COMPLETE: Hwy 75/Hwy 10 in Moorhead

Description: Construct turn lanes, replace sidewalks, improve pedestrian accessibility, upgrade signals, resurface

Construction Dates: April-Summer 2016
Traffic impacts: Detour, lane closures, sidewalk detours

COMPLETE: Hwy 75 from Dumont to Graceville and Doran to Hwy 55

Description: Replace culverts

Construction Dates: June 2016
Traffic impacts: Detour

Hwy 77

COMPLETE: Hwy 77 at 127th Street/Palomino Drive and Hwy 13 bridges over Hwy 77

Description: Replace bridge joints

Construction dates: May-August (dates are tentative)

Traffic impacts: 127th Street/Palomino Drive closed for two weeks, lane and ramp closures on Hwy 13
More information: mndot.gov/metro/projects/bridgejoints2016

Hwy 79

COMPLETE: Hwy 79 near Elbow Lake

Description: Resurface 11 miles of Hwy 79

Construction dates: May-June 2016

Traffic impacts: Detour
More information: mndot.gov/d4/projects/hwy79/

Hwy 84

COMPLETE: Hwy 84 Longville

Description: Replace Boy River bridge in Longville in Cass County

Construction dates: August-early Oct. 2016

Traffic impacts: Only one lane to be open across bridge (surface may be gravel). Traffic to alternate crossing with use of a temporary traffic signal.

More information: mndot.gov/d3/2016/h84/

Hwys 80-99

I-90

COMPLETE: I-90 Winona County Dresbach Bridge

Description: Replace I-90 bridge over the Mississippi River, exit and entrance ramps to Hwy 61, rest area

Construction dates: Late 2012-Fall 2016

Traffic impacts: Welcome Center open

More information: mndot.gov/dresbachbridge/

Complete: I-90 from Round Lake to Sherburn

Description: Resurface

Construction dates: May 2015-July 2016

More information: mndot.gov/d7/projects/I90preserve/

Hwy 92

COMPLETE: Hwy 92 Gonvick to Trail

Description: Apply 8-mile sealcoat

Construction dates: Summer 2016

Traffic impacts: Temporary lane closures

I-94 in Twin Cities Metro

COMPLETE: I-94 in Minneapolis

Description: Reconfiguring the current ramp from westbound I-94 to serve Seventh Street instead of Fifth Street

Construction dates: August 2015-August 2016

Traffic impacts: Ramp closures, weekend closures, lane and shoulder closures, detours

More information: mndot.gov/metro/projects/i94minneapolis/

COMPLETE: I-94 in St. Paul

Description: Repair and upgrade nine bridges between Pelham Ave. and Dale St. in St. Paul

Construction dates: April 2016-October 2016

Traffic impacts: Closures, detours

More information: mndot.gov/metro/projects/i94bridges/

COMPLETE: I-94 at Hennepin Co. Rd. 81 in Brooklyn Park

Description: Rebuild ramps between I-94 and Bottineau Blvd/Co. Rd. 81

Construction dates: Fall 2016
Traffic impacts: Ramps closed

More information: http://www.hennepin.us/residents/transportation/bottineau-blvd

COMPLETE: I-94 – MacKubin & Grotto Street pedestrian/bike bridges in St. Paul

Description: Rebuild pedestrian/bike bridges over I-94, west of downtown St. Paul

Construction dates: April-late-November 2016
Traffic impacts: Non-peak lane closures, delays

More information: mndot.gov/metro/projects/i94mackubinstpaul

COMPLETE: I-94 - Xerxes Ave, Zane Ave and 49th Ave bridges over I-94

Description: Replace bridge joints

Construction dates: April - October, dates are tentative. Check website for most current information

Traffic impacts: Xerxes Ave closed for one week, lane closures on Zane Ave. and 49th Ave.
More information: mndot.gov/metro/projects/bridgejoints2016

COMPLETE: I-94 and Hemlock Lane

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

I-94 in Greater Minnesota

COMPLETE: I-94 and Hwy 29 in Alexandria

Description: Reconstruct the I-94/Hwy 29 interchange

Construction dates: April-October 2016
Traffic impacts: Ramp and lane closures

More information: mndot.gov/d4/projects/alexi94hwy29/

COMPLETE: I-94/Hwy 75 – Moorhead

Description: Reconstruct the current interchange to address mobility and capacity issues along the two corridors.

Construction dates: April-November 2016
Traffic impacts: Roadwork complete, signal work ongoing

More information: mndot.gov/d4/projects/moorhead/

COMPLETE: I-94 St. Cloud to Collegeville

Description: Resurface six miles of I-94 between the CR 159 interchange in Collegeville and Hwy 23 in St. Cloud. Includes segment of CR 75 and ramps; improves guardrail and drainage infrastructure.

Construction dates: May-Sept. 30, 2016
Traffic impacts: I-94 reduced to one lane in each direction, reduced speeds, ramp closures,  detours

More information: mndot.gov/d3/i94/

COMPLETE: I-94 at Hwy 15 in St. Cloud

Description: Resurface the I-94 bridges over Hwy 15

Construction dates: April–Aug. 12, 2016
Traffic impacts: I-94 reduced to single lane, bypass lanes

More information: mndot.gov/d3/i94/

COMPLETE: I-94 northwest of Fergus Falls

Description: Re-deck I-94 bridges over County Rd 88

Construction dates: May-October 2016

Hwy 96

COMPLETE: Hwy 96 at Manning Ave in Grant and Stillwater

Description: Washington County led project. Construct roundabout.

Construction dates: June-late-October 2016

Traffic impacts: Temporary road and lane closures
More information: www.co.washington.mn.us/index.aspx?NID=2021

Hwy 97

COMPLETE: Hwy 97/ Hwy 61 in Forest Lake

Description: Reconstruct the Hwy 61/ Hwy 97 intersection

Construction dates: Fall 2015-Summer 2016 
Traffic impacts: Delays, closures

More information: mndot.gov/metro/projects/hwy61and97

COMPLETE: Hwy 97 at Lofton Ave in Scandia

Description: Construct turn lanes (Washington County project)

Construction dates: May-July 2016
Traffic impacts: Off-peak lane closures

More information: www.co.washington.mn.us/index.aspx?nid=2456

Hwys 100-199

Hwy 100

COMPLETE: Hwy 100 in St. Louis Park, Edina and Bloomington

Description: Interchange reconstruction

Construction dates: August 2014-November 2016

Traffic impacts: Lane closures, detours

More information: mndot.gov/metro/projects/hwy100slp/

COMPLETE: Hwy 100 at Duluth Street in Golden Valley

Description: Construct HOV bypass lane on entrance ramp from Duluth Street to Hwy 100

Construction dates: May-July 2016

Traffic impacts: Ramp closure, detour
More information: mndot.gov/metro/projects/hwy100duluthramp/

COMPLETE: Hwy 100 and Hwy 55

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: Hwy 100 and I-394

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

Hwy 101

COMPLETE: County Road 101, formerly Hwy 101 - Minnesota River Crossing

Description: Carver County led flood mitigation project - County Road 101 between existing Minnesota River bridge in Shakopee and Hwy 61/Flying Cloud Drive in Chanhassen interchange reconstruction

Construction dates: Spring 2014-fall 2016 (River Crossing opened November 2015)
Traffic impacts: Lane closures, delays

More information: mndot.gov/metro/projects/hwy101river/

COMPLETE: Hwy 101, Hwy 5 - Chanhassen

Description: Construct acceleration lane to improve merge, ADA improvements

Construction dates: April - August 2016

Traffic impacts: Temporary lane closures and detours

More information: mndot.gov/metro/projects/hwy5chanhassen/

COMPLETE: Hwy 101 from the Crow River to the Mississippi River in Otsego

Description: Install cable median barrier and guardrail, drainage

Construction dates: Aug. 25-late-October 2016

Traffic impacts: Shoulder and lane closures

More information: mndot.gov/trafficeng/reports/cmbarrier.html

Hwy 102

COMPLETE: Hwy 102 Fertile to Crookston

Description: Apply 19-mile sealcoat

Construction dates: Summer 2016
Traffic impacts: Temporary lane closures

Hwy 105

COMPLETE: Wis. Hwy 105, Hwy 39 Oliver Bridge (CN Railroad) St. Louis County

Description: Rehabilitate railroad bridge between Minnesota and Wisconsin

Construction dates: April-November 2016

Traffic impacts: Closed 8 a.m. to 5 p.m. Mondays through Fridays

More information: mndot.gov/d1/projects/Oliver-Bridge-Rehabilitation

COMPLETE: Hwy 105 in Austin

Description: Resurface highway, replace traffic signals

Construction dates: May 9 to Aug. 5, 2016

Traffic impacts: Lane closures, detour

More information: mndot.gov/d6/projects/hwy105-resurfacing

Hwy 120

COMPLETE: Hwy 120 at County Rd B in North St. Paul, Oakdale

Description: Upgrade traffic signals

Construction dates: June-September 2016

Traffic impacts: Off-peak lane closures

More information: denise.workcuff@state.mn.us

Hwy 135

COMPLETE: Hwy 135, 61, 37, 73, 169, 53 Grand Marais to Grand Portage

Description: Maintain, improve drainage systems

Construction dates: Mid-May to mid-October, 2016

Traffic impacts: Lane closures controlled by signals or flaggers

More information: mndot.gov/d1/projects/Hwy61-grandmarais-grandportage

Hwy 169 in the Twin Cities Metro

COMPLETE: Hwy 169 in New Hope

Description: Construct a noise wall along the east side of Hwy 169 between Rockford Rd and 49th Ave

Construction dates: April-July 2016
Traffic impacts: NB Hwy 169 ramp to 49th Ave closed through mid-July; NB Hwy 169 ramp from Rockford Rd closed through mid-July, detours
More information: mndot.gov/metro/projects/hwy169newhope/

COMPLETE: Hwy 169 at Canterbury Rd to County Rd 21 in Shakopee

Description: Widen right shoulder and upgrade guardrail

Construction dates: July - late Oct. 2016

Traffic impacts: Lane and shoulder closures, possible night closures

More information: kirsten.klein@state.mn.us

COMPLETE: Hwy 169 at County Rd 14 in Louisville Township to Old Shakopee Rd in Bloomington

Description: Replace signs

Construction dates: August-late-November 2016

Traffic impacts: Off-peak lane and shoulder closures

More information: kirsten.klein@state.mn.us

COMPLETE: Hwy 169 at County Rd 3 in Belle Plaine

Description: Construct new bridge

Construction dates: July-August 2016

Traffic impacts: Off-peak lane closures

More information: www.belleplainemn.com/current-projects

COMPLETE: Hwy 169 from Hwy 21 in Jordan to Hwy 41 in Jackson Township

Description: Install cable median barrier

Construction dates: Fall 2016

Traffic impacts: Lane and shoulder closures

More information: mndot.gov/trafficeng/reports/cmbarrier.html

COMPLETE: Hwy 169 at Marschall Rd in Shakopee

Description: Upgrade traffic signals

Construction dates: May-fall 2016

Traffic impacts: Lane closures

More information: kirsten.klein@state.mn.us

COMPLETE: Hwy 169 and Hwy 7

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: Hwy 169 and Minnetonka Blvd

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: Hwy 169 and Jordan Ave S

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: Hwy 169 and Anderson Lakes Pkwy

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: Hwy 169 and West Old Shakopee Rd

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

Hwy 169 in Greater Minnesota

COMPLETE: Hwy 169 north of Milaca

Description: Reconstruct seven miles of northbound Hwy 169 north of Milaca, extend turn lanes.

Construction dates: Late April - October 19, 2016

Traffic impacts: Reduced to a single lane of traffic in both directions. Expect narrow lanes (11 ft wide), lane shifts and reduced speeds through work zone.

More information: mndot.gov/d3/2016/h169/

COMPLETE: Hwy 169 Onamia to Vineland

Description: Resurface 15 miles of Hwy 169 south of Onamia to Vineland, along the southwest shore of Mille Lacs Lake. Improve drainage and guardrail. Extend turn lanes.

Construction dates: May-June 2016

Traffic impacts: Lane closures, flaggers, pilot car. Overnight work on two-lane segments.

More information: mndot.gov/d3/2016/h169/

COMPLETE: Hwy 169 at County Rd 4 in Zimmerman

Description: Improve Hwy 169/County Rd 4 intersection; includes longer southbound acceleration lane, new signal system, improved accessibility.

Construction dates: Summer-Nov. 23, 2016

Traffic impacts: Lane closures on Hwy 169; CR 4 detoured east of intersection

More information: Contact Sherburne County

COMPLETE: Hwy 169 from Mankato to Saint Peter

Description: Resurface southbound lanes, raise flood-prone areas, revise intersections in north St. Peter

Construction dates: February 2016-Fall 2016

More information: mndot.gov/d7/projects/floodmitigation/

COMPLETE: Hwy 169, 61, 135, 37, 73, 53 Grand Marais to Grand Portage

Description: Maintain, improve drainage systems

Construction dates: Mid-May to mid-October, 2016

Traffic impacts: Lane closures controlled by signals or flaggers

More information: mndot.gov/d1/projects/Hwy61-grandmarais-grandportage

Hwy 175

COMPLETE: Hwy 175 North Dakota border to Hallock

Description: Repair shoulder

Construction dates: Summer 2016

Hwy 194

COMPLETE: Hwy 194, Hwy 61, I-35 in St. Louis and Lake Counties

Description: Resurface pavement and drainage repairs

Construction dates: May 9-Aug. 31, 2016
Traffic impacts: Lane restrictions, ramp closures

More information: mndot.gov/d1/projects/I-35-Hwy61-Hwy-194-Resurfacing/

COMPLETE: Hwy 194 from 8th St to 9th St in Duluth

Description: Remove retaining wall and building

Construction dates: May 2016
Traffic impacts: Sidewalk closures

Hwy 197

COMPLETE: Hwy 197 from 15th St to 18th St in Bemidji

Description: Replace sidewalk, install crosswalk with a flashing beacon

Construction dates: Summer 2016
Traffic impacts: Temporary lane closures

Hwys 200-299

Hwy 200

Complete: Hwy 200 near Mahnomen

Description: Resurface, grade raises in low areas

Construction dates: Summer 2016

More information: mndot.gov/d4/projects/hwy200/

Hwy 212

COMPLETE: Hwy 212 Shady Oak Road

Description: Shady Oak Road reconstruction (Led by city of Eden Prairie)

Construction dates: Spring 2014-June 2016

Traffic impacts: Closures, delays, detours

COMPLETE: Hwy 212 from County Rd 11 to Powers Blvd in Chanhassen

Description: Install cable median barrier

Construction dates: July - early-November 2016

Traffic impacts: Lane and shoulder closures

More information: mndot.gov/trafficeng/reports/cmbarrier.html

Hwy 217

COMPLETE: Hwy 217 in Cook County

Description: Resurface pavement, repair Rat Root River Bridge

Construction dates: June - Oct. 17, 2016

Traffic impacts: Alternating lane closures

More information: mndot.gov/d1/projects/Hwy-217-Resurfacing/

Hwy 250

COMPLETE: Hwy 250 near Lanesboro

Description: Bridge replacement and roadway realignment

Construction dates: May-November 2016
Traffic impacts: Closures, delays, detours

More information: mndot.gov/d6/projects/hwy250-bridge/

Hwy 280

COMPLETE: Hwy 280—St Paul, Lauderdale and Roseville

Description: Resurface road, improve drainage, rebuild ramp from northbound Hwy 280 to northbound I-35W

Construction dates: Spring and summer 2016
Traffic impacts: Closures, delays, detours

More information: mndot.gov/metro/projects/hwy280/

Hwy 298

COMPLETE: Hwy 298, Hwy 299, Hwy 3

Description: Resurface pavement in Northfield, Faribault

Construction dates: May-August 2016
Traffic impacts: Long-term lane closures

Hwy 299

COMPLETE: Hwy 299, Hwy 298, Hwy 3

Description: Resurface pavement in Northfield, Faribault

Construction dates: May-August 2016
Traffic impacts: Long-term lane closures

Hwys 300-694

Hwy 330

COMPLETE: Hwy 330 & Hwy 14 near Revere

Description: Resurface highway from Revere to Brown County line, overlay all of Hwy 330, update guardrail

Construction dates: September-November 2016

Traffic impacts: Alternating lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy14andhwy330/

Hwy 371

COMPLETE: Hwy 371 Baxter to south of Fort Ripley

Description: Maintain/resurface pavement on both directions of Hwy 371 between Hwy 210 in Baxter and Morrison County Rd 48 south of Fort Ripley (15 miles).

Construction dates: July 5-Aug. 6, 2016

Traffic impacts: Segments of single-lane traffic, lane shifts and reduced speeds. Work to be done on weekdays during daylight hours on good weather days.
More information: mndot.gov/d3/newsrels/16/06/28hwy371.html

I-394

COMPLETE: I-394 in Golden Valley, St. Louis Park, Minnetonka

Description: Resurface pavement

Construction dates: June 6 through August 2016

Traffic impacts: Lane closures

More information: mndot.gov/metro/projects/i394goldenvalley/

COMPLETE: I-394 and I-494

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: I-394 and Hwy 100

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

I-494

COMPLETE: I-494, Hwy 62 in Minneapolis, Richfield and Bloomington

Description: Construct Intercity Regional Trail (project led by Three Rivers Park District)

Construction dates: Spring 2015-November 2016

More information: City of Bloomington website

COMPLETE: I-494 in Plymouth

Description: Repair pavement, bridge decks and ramps, and add a third lane between Hwy 55 and the I-94/694 interchange

Construction dates: Spring 2014-November 2016
Traffic impacts: Closures, delays

More information: mndot.gov/metro/projects/i494plymouth/

COMPLETE: I-494 in Eagan, Pilot Knob Road

Description: Replace bridge joints

Construction dates: Late April-May

Traffic impacts: Lane closures on Pilot Knob Road for one month
More information: mndot.gov/metro/projects/bridgejoints2016

COMPLETE: I-494 and I-394

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: I-494 and Hwy 7

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: I-494 and I-35E

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

COMPLETE: I-494 and Blaine Ave

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

I-535

COMPLETE: I-535 to I-35 Blatnik Bridge

Description: Repair pavement, reinforce structure, improve drainage
Construction dates: August-October 2016
Traffic impacts: Lane closures, detour
More information: mndot.gov/d1/projects/blatnik

Hwy 610

COMPLETE: Hwy 610 from Hwy 169 to Hwy 252 in Brooklyn Park

Description: Install cable median barrier and guardrail, drainage
Construction dates: June-September 2016
Traffic impacts: Shoulder and lane closures
More information: mndot.gov/trafficeng/reports/cmbarrier.html

COMPLETE: Hwy 610 and East River Rd NW

Description: Pond restoration and drainage improvement

Construction dates: June-August 2016

Traffic impacts: Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/pondrestoration2016

I-694

COMPLETE: I-694 and I-35E in Little Canada, Vadnais Heights

Description: Painting noise walls along I-694 and I-35E Commons

Construction dates: July 20, 2015-mid-July 2016

Traffic impacts: Shoulder closures, possible ramp closure from Little Canada Road to I-35E

COMPLETE: I-694 in New Brighton, Fridley

Description: Painting five bridges between I-35W and East River Road

Construction dates: Aug. 15 through Oct. 7, 2016

Traffic impacts: Four weekend closures, I-694 closed and detoured
More information: mndot.gov/metro/projects/i694bridges/

Hwy 952 - Robert Street in West St Paul

COMPLETE: Robert Street - Thompson Av to Mendota Rd (SP1908-84)

Description: Resurface road and sidewalks, upgrade underground water, sewer and electrical utilities
Construction dates: March-January 2017

Cost (MnDOT portion): $4.1 million [of total $23 million]
Traffic impacts: Long-term lane and road closures, with detours
More information: wspmn.gov/729/Robert-St-Improvements

Contact: robertstreet@zanassoc.com