Minnesota Department of Transportation

511 Travel Info

Minnesota state highway projects

Construction projects, plans, and studies

Projects completed in 2020

Browse by highway number

Hwys 1–9

Hwy 1 — Red Lake

Reconstruct between Hwy 89 and border with Red Lake Nation

Hwy 1 — Stony River Bridge

Replace bridge at Stony River, grade approaches near County Road 2 west of Isabella in Lake County

Hwy 1 and Hwy 59 — Thief River Falls roundabouts

Construct three roundabouts, frontage road and multi-use trail between Hwy 59 and Kinney Avenue

Hwy 2 — Bagley

Resurface and pedestrian improvements, construct multi-use trail

Hwy 2 — Bena to Ball Club

Resurface between Bena and Ball Club, construct multi-use trail near Bena

Hwy 2 — Crookston

Resurface east of Crookston

Hwy 2 — Deer River

Urban reconstruct on Hwy 2 and 6 in Deer River

Hwy 2 — Marcoux Corner

Resurface westbound lanes between Hwy 32 and Polk County Road 44

Hwy 3 — Empire Township and Farmington

Added roundabout at 170th St. and left turn lane construction

Hwy 5 — Green Isle

Resurface from Fifth Street in Green Isle to Hwy 212

Hwy 5 — Mississippi River to Minneapolis-Saint Paul International Airport

Highway and ramp resurfaced on Hwy 5 from Mississippi River to 34th Avenue

Hwy 6 — Talmoon

Resurface between Talmoon and Itasca County Road 136

Hwy 7 — Victoria

Stabilized the highway and shoulders and installed an improved drainage system with curb and gutters and new shoulders between Merrywood Lane and Waterford Lane on Hwy 7

Hwy 8 — Taylors Falls

Applied a seal coat on Hwy 8 over the St. Croix River

Hwys 10–19

Hwy 10 and Hwy 47 — Anoka and Coon Rapids

Resurfaced Hwy 10 in both directions between Hwy 47 and Hwy 65 and Hwy 47 between Anoka County Road 10 and Hwy 10; Americans with Disabilities (ADA) improvements at the Hwy 47 and County Road 10 interchange and at the Hwy 10/610 and University Avenue (County Road 51) interchange.

Hwy 10 — Detroit Lakes

Intersection improvements at Kris Street and signal installation at County Road 54

Hwy 10 — Glyndon

Pavement repair on eastbound Hwy 10 in Glyndon

Hwy 10 — Wadena

Reconstruct Hwy 10 from Birch Avenue to east of County Road 4 in the city of Wadena, includes sidewalks, accesses and utilities.

Hwy 12 — Cokato

Resurface from Sunset Avenue Northwest to Seventh  Street Southeast, update pedestrian sidewalks; reconstruct access and replace signal at Wright County Road 3; update accesses at Dassel-Cokato high school.

Hwy 12 — Maple Plain to Delano

Installed flexible rubber safety poles in center of Hwy 12 and removed trees on state property.

Hwy 12 — Montrose to Delano

Resurface from Zephyr Avenue in Montrose to north of Bridge Avenue in Delano

Hwy 12 and Hwy 22 — Litchfield

Reconstruction of four blocks of Hwy 12 and Hwy 22 through downtown Litchfield.

Hwy 13 — Prior Lake

Reconstructed Hwy 13, constructed turn lanes, installed traffic signal and improved pedestrian crossings

Hwy 14 — Chester drainage repair

Replace two drainage pipes and a box culvert

Hwy 14 — New Ulm gateway

Complete bridge aesthetics and landscaping

Hwy 15 — Hutchinson

Reconstruct and resurface Hwy 15 in Hutchinson

Hwy 18 — East of Brainerd

Replace bridge over Portage Creek west of Hwy 6

Hwy 19 — Morton slope repair

Stabilize slope and repair road on Hwy 19 near Morton

Hwys 20–29

Hwy 23 — Cottonwood to Granite Falls

Resurface Hwy 23 from Cottonwood to Granite Falls.

Hwy 23 — East St. Cloud

Resurface both directions from Benton County Road 1 to Hwy 95 east of St. Cloud. Reconstruct Hwy 23/County Road 8 access as a safer reduced conflict intersection

Hwy 23 — Nemadji River Bridge

Replace Nemadji River Bridge on Hwy 23, 1.6 miles north of County Road 8 in Carlton County

Hwy 23 and I-94 — Waite Park interchange

Add loop ramps to improve access to/from the Hwy 23/I-94 interchange

Hwy 24 — Annandale

Reconstruct from Hwy 55 to Poplar Avenue in Annandale, includes pedestrian sidewalks and city utilities

Hwy 25 — Monticello, and Hwy 210 — Riverton

Install overhead intersection lighting at Hwy 25 at 600th Street/Kjellberg Court in Monticello; Hwy 210 at Crow Wing County Road 12 (Deerwood shortcut) near Riverton. Improves pedestrian and motorist safety.

Hwy 25 — Montrose

Resurface and improve Hwy 25 from Hwy 12 to Seventh Street South, add new multiuse paved trail and install new water and sewer lines. (City of Montrose-led project)

Hwy 28 — Chokio to Morris

Resurface, replace box culverts

Hwy 28 — Sauk Centre

Replace the bridge over Hoboken Creek west of Sauk Centre.

Hwys 28, 29, and 114 — Starbuck Complete Streets

Downtown complete streets reconstruction, resurface, utility replacement, ADA improvements and multi-use trail.

Hwy 29 — Montevideo bridge

Replace bridge on Hwy 29 over North Parkway Drive in Montevideo.

Hwys 30-39

Hwy 30 — Cottonwood County

Resurface from Cottonwood County Road 7 to Hwy 71

Hwy 30 and Hwy 22 — New Richland

Resurface Hwy 30 from Hwy 22 to New Richland; replace two bridges

Hwy 32 — Thief River Falls to St. Hilaire resurfacing

Resurface, pedestrian improvements in St. Hilaire

I-35 — Duluth Lake Avenue Bridge

Resurface Lake Avenue Bridge in Duluth, safety and mobility improvements

I-35 — Harris to Chisago/Pine County line

Concrete pavement work, drainage updates and safety improvements

I-35 — Heath Creek Rest Area

Rest area reconstruction

I-35 — Pine City

Replace the bridges at Hwy 70 and County Road 7

I-35, I-90, Hwy 56 — concrete pavement repair

Concrete pavement repair on I-35 near Faribault, I-90 Stewartville to Austin and Hwy 56 at West Concord.

I-35, I-35E, I-35W North Metro Split — Lino Lakes to Forest Lake

Project included resurfacing the road and replacing bridges

I-35E — Little Canada

Applied a seal coat on southbound I-35E ramp over I-694

I-35E and County Road J/Ash Street Interchange — Lino Lakes

Install traffic signal and lighting at east and west ramps

I-35E, I-35W, and I-35 North Metro Split — Lino Lakes to Forest Lake

Project included resurfacing the road and replacing bridges

I-35W — Richfield

Repaired concrete on I-35W between 66th Street and 76th Street in Richfield

I-35W — Roseville

Applied a seal coat on the County Road 88 bridge over I-35W and on the I-35W southbound ramp over northbound I-35W

I-35W, I-35E, I-35 North Metro Split — Lino Lakes to Forest Lake

Project included resurfacing the road and replacing bridges

Hwy 36 — Roseville

Applied a seal coat on westbound Hwy 36 over I-35W

Hwy 36 — Saint Croix River Crossing

Mitigation for construction of the new Saint Croix River Crossing. Included rehabilitation of the Stillwater Lift bridge, construction of the Upper Loop Trail along Hwy 95 and landscaping along Hwy 95 north of the bridge and in the interchange of Hwy 36 and Hwy 95.

Hwy 36 — Stillwater Lift Bridge

Transformation into a bicycle/pedestrian crossing including repaired steel connections, restored mechanical and electrical components, repaired concrete railings, reconstructed concourse, paint and lighting replacements

Hwys 40-59

Hwy 41 — Chaska

Landscape, reconstructed and expanded road, improved intersection, signals and pedestrian ramps, relocated trail and built underpass for trail between Hwy 212 and Pioneer Trail. Project lead is Carver County.

Hwy 42 — Resurfacing

Resurfacing Hwy 42 from Plainview to the west side of the newly replaced bridge west of Hwy 61

Hwy 47 — Isle to Ogilvie

Reconstruct 22 miles of road surface, improve road access and update drainage between Hwy 27/47 in Isle and Hwy 23 in Ogilvie. Replace two bridges near Ann Lake.

Hwy 47 and Hwy 10 — Anoka and Coon Rapids

Resurfaced Hwy 10 in both directions between Hwy 47 and Hwy 65 and Hwy 47 between Anoka Co. Rd 10 and Hwy 10; Americans with Disabilities (ADA) improvements at the Hwy 47 and County Road 10 interchange and at the Hwy 10/610 and University Avenue (County Road 51) interchange.

Hwy 53 — Virginia

Turn lanes, traffic signal and accessibility improvements at 13th Street, Mount Iron Drive, 12th Avenue West and Second Avenue West in Virginia in St. Louis County

Hwy 53 and Hwy 1 — St. Louis, Koochiching Counties

Intersection improvement, passing lanes project

Hwy 55 — Plymouth bridge

Repaired concrete, replaced joints and made improvements to the barrier on the westbound Hwy 55 bridge over the Luce Line and the railroad tracks.

Hwy 55 — Pomme de Terre Bridge Replacement

Replace the bridge at Pomme de Terre River, southeast of Barrett

Hwy 57 and Hwy 60 — Wanamingo

Intersection roundabout

Hwy 59 — Newfolden

Replace two culverts

Hwy 59 and Hwy 14 — Slope repairs

Stabilize slopes in Lyon, Murray and Redwood counties

Hwy 59 and Hwy 19 — Resurfacing

Resurface 18 miles on Hwy 59 and Hwy 19 in Lyon and Yellow Medicine counties

Hwys 60-79

Hwy 61 — Hastings

Applied a seal coat on Hwy 61 over the Mississippi River between Second Street and North Loop Road

Hwy 61 — Lake City

Hwy 61 reconstruction

Hwy 61 — Winona

Hwy 61 intersection safety improvements

Hwy 63 — Red Wing bridges

Replace the Mississippi River crossing between Red Wing, Minn. and Wisconsin.

Hwy 65 — Isanti

Improve access; install a reduced conflict intersection to improve access at Hwy 65/Cajima St NE, Isanti. (City of Isanti-led project)

Hwy 65 and 41st Avenue — Columbia Heights

Replaced signal system at intersection of Hwy 65 and 41st Avenue Installed audible pedestrian signals and upgraded pedestrian crossing to ADA standards.

Hwy 67 — Morgan

Resurface road. Project led by City of Morgan.

Hwy 71 — Jackson to Windom and Windom to Hwy 30

Resurfacing and bridge replacement

Hwy 71 — Long Prairie

Replace bridge over Long Prairie River in Long Prairie; resurface Hwy 71 one mile north of Long Prairie.

Hwy 71 — Park Rapids

Install truck route signs, install intersection lighting

Hwy 72 — Blackduck

Replace three culverts between Blackduck and Kelliher

Hwy 72 — Waskish

Resurface 14 miles of rural Hwy 72 between Waskish and Baudette

Hwy 74 — Bridge replacement

Replace a bridge on Hwy 74 north of Winona County Road 30.

Hwy 75 — Argyle

Resurface and pedestrian improvements

Hwy 75 — Mustinka River Bridge replacement

Replace bridge over Mustinka River; resurface from Fifth Street in Wheaton to Mustinka River

Hwy 75 — Pipestone bridge

Replace bridge on Hwy 75 over Pipestone Creek.

Hwy 75 — Warren

Resurface and pedestrian improvements on Hwys 1 and 75

Hwys 80-99

I-90 — Austin repaving

I-90 repaving

I-90 — Fairmont to Blue Earth corridor preservation

Pavement restoration and bridge rehab

Hwy 91 — Adrian North

Resurface from Adrian to Nobles/Murray County line

Hwy 91 — Nobles/Murray County line to Russell

Resurface Hwy 91 from Nobles/Murray County line to Russell, replace four bridges, repair culverts, improve sidewalks in Lake Wilson

I-94 — Albany to Sauk Centre

Resurface both directions of I-94 between Albany and Sauk Centre (nine miles) in Stearns County

I-94 — East Metro Interchange (I-694/I-494/I-94)

Reconstructed ramp, built new southbound auxiliary lane from 10th St. to I-94, replaced and/or widened northbound and southbound interchange bridges, added northbound and southbound buffer lanes, constructed ramp merge area and repair pavement.

I-94 — Minneapolis

Resurfaced road and ramps on I-94 between Nicollet Avenue and Hwy 280

I-94 — Minneapolis

Applied a seal coat on I-94 over Franklin Terrace

I-94 — Minneapolis

Applied a seal coat on westbound I-94 off ramp over the CP Rail Road

I-94 — Minneapolis bridge over 17th Avenue

Crews repaired and painted the bridge over the blue line light-rail transit at 17th Avenue

Hwy 95 — Bayport and Lakeland

Repaired pavement, Updated drainage, upgraded sidewalks and curb ramps

Hwy 95/Hemmingway Avenue roundabout — North Branch

Constructed a single-lane roundabout on Hwy 95 at Hemmingway Avenue in North Branch.

Hwy 97 — Forest Lake

Constructed left turn lanes on Hwy 97 at North Shore Trail and at Keewahtin Avenue North.

Hwy 97/Goodview Avenue — Forest Lake

Constructed a single-lane roundabout on Hwy 97 at Goodview Avenue/Eighth Street in Forest Lake.

Hwys 100-199

County Road 101/Central Avenue Bridge over Hwy 12 — Wayzata

Repaired the County Road 101/Central Avenue Bridge over Hwy 12, added left turn lanes, reconstructed approaches, and repaired ramp pavement

Hwy 111, Hwy 22 — Nicollet to Gaylord

Resurface from Nicollet to Gaylord

Hwy 169 and 101st Avenue interchange — Brooklyn Park

The city of Brooklyn Park is constructing a new interchange at Hwy 169 and 101st Avenue

Hwy 169 and Hwy 41 — Scott County intersection improvements

MnDOT and Scott County constructed a new interchange at Hwys 169/41/78 in Jackson and Louisville townships

Hwy 169 — Milaca

Install Reduced Conflict Intersections (RCI) at Mille Lacs County Road 11 north of Milaca, and County Road 12 and County Road 13 south of Milaca.

Hwy 169 — Nashwauk

Construct intersection safety improvements at the intersection of Hwy 169 and Hwy 65 Nashwauk

Hwy 169 — Plymouth

Place concrete barrier on Rockford Road bridge

Hwy 169 — Saint Louis County

Resurfacing Hwy 169 from Hwy 53 to County Road 26 in St. Louis County, incudes northbound Hwy 169 ramp

Hwy 169 — Vineland

Install pedestrian High Intensity Activated Crosswalk System (HAWK) system at Hwy 169/Ataage Dr. in Vineland. Project led by Mille Lacs Band of Ojibwe

Hwy 172 — Baudette

Resurface between Baudette and Wheeler’s Point

Hwy 194 — Central Entrance repaving

Repaving Hwy 194/Central Entrance in preparation of the Twin Ports Interchange traffic detour

Hwys 200-299

Hwy 200 — Laporte

Reconstruct and raise grade

Hwy 200 — Whipholt

Historic restoration at roadside parking area

Hwy 212 — Norwood Young America

Repaved Hwy 212 from Hwy 25/5 to Cologne

Hwy 220 — Oslo

Replace bridges over the Snake and Tamarac Rivers north of Oslo

Hwy 251 — Hollandale

Resurfacing and culvert replacement

Hwy 280 — St. Paul

Applied a seal coat on the University Ave. and Wabasha Ave. bridges over Hwy 280

Hwys 300-694

Hwy 313 — Warroad

Resurface between Warroad and Canada

Hwy 371 — Hackensack to Hwy 200

Resurface between Cass County Road 5 in Hackensack and Hwy 200

I-394 — Minneapolis

Repaired I-394 bridge over Dunwoody Boulevard in Minneapolis.

I-494 — Bloomington to Eagan

Resurfaced trail from the River Bridge to Hwy 13

I-494 and France Avenue — Bloomington

Repaired concrete, installed signals and accessible ramps

I-494 — Mendota to South Saint Paul

Bridge deck resurfaced and auxiliary lane addition

I-494 and I-94 — East Metro Interchange project (I-694/I-494/I-94)

Reconstructed ramp, built new southbound auxiliary lane from 10th St. to I-94, replaced and/or widened northbound and southbound interchange bridges, added northbound and southbound buffer lanes, constructed ramp merge area and repair pavement.

I-694 — East Metro Interchange project (I-694/I-494/I-94)

Reconstructed ramp, built new southbound auxiliary lane from 10th St. to I-94, replaced and/or widened northbound and southbound interchange bridges, added northbound and southbound buffer lanes, constructed ramp merge area and repair pavement.

I-694 and Rice Street — Shoreview, Little Canada, Vadnais Heights

Built a new bridge and an offset single point interchange with three roundabouts