Current projects on Minnesota highways

Updated April 6, 2020

Select a project by highway

Hwys 1–9

Hwy 1

Hwy 1 and Hwy 73 — Itasca and Saint Louis counties

Description: Resurface Hwy 1 from Hwy 65 to Hwy 53 and on Hwy 73 from Hwy 1 to Hwy 53 and intersection improvement at County Road 115/Ashawa Road north junction Hwy 1 in Itasca and St. Louis counties
Construction dates: July to October 2020
Traffic impacts: Lane closures
More information: mndot.gov/d1/projects/hwy1resurfacing

Hwy 1 — Red Lake

Description: Reconstruct between Hwy 89 and border with Red Lake Nation
Construction dates: May to late October 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/hwy1-redlake

Hwy 1 — Stony River Bridge

Description: Replace bridge at Stony River, grade approaches near CR 2 west of Isabella in Lake County
Construction dates: May to November 2020
Traffic impacts: Lane closures
More information: mndot.gov/d1/projects/hwy1-stonyriverbridge

Hwy 1 — Thief River Falls

Description: Resurface Hwy 1 between Hwy 219 and Pennington CR 18
Construction dates: mid-August to early October 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/thief-river-falls

Hwy 1 and Hwy 59 — Thief River Falls

Description: Construct three roundabouts, frontage road and multi-use trail between Hwy 59 and Kinney Avenue
Construction dates: June to late October 2020
Traffic impacts: Stage detours
More information: mndot.gov/d2/projects/2020/thief-river-falls

Hwy 2

Hwy 2 — Bagley

Description: Resurface and pedestrian improvements, construct multi-use trail
Construction dates: June to August 2020
Traffic impacts: Lane closures
More information: mndot.gov/d2/projects/2020/hwy2-bagley

Hwy 2 — Bena to Ball Club

Description: Resurface between Bena and Ball Club, construct multi-use trail near Bena
Construction dates: July to September 2020
Traffic impacts: Lane closures
More information: mndot.gov/d2/projects/2020/hwy2-bena

Hwy 2 — Crookston

Description: Resurface east of Crookston
Construction dates: June to July 2020
Traffic impacts: Lane shift, single lane traffic
More information: mndot.gov/d2/projects/2020/hwy2-crookston

Hwy 2 — Deer River

Description: Urban reconstruct on Hwy 2 and 6 in Deer River
Construction dates: May to October 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/hwy6-deerriver

Hwy 2 — Marcoux Corner

Description: Resurface westbound lanes between Hwy 32 and Polk CR 44
Construction dates: July to August 2020
Traffic impacts: Lane closures
More information: mndot.gov/d2/projects/2020/hwy2-marcoux

Hwy 3

Hwy 3 — Empire Township and Farmington

Description: Adding roundabout at 170th St. and left turn lane construction

Construction dates: Summer through fall 2020

More information: mndot.gov/metro/projects/hwy3farmington-empiretwp

Hwy 3/Robert Street — St. Paul

Description: Repair Robert St. Bridge over the Mississippi River.

Construction dates: Preventative maintenance begins summer 2020

More information: mndot.gov/metro/projects/hwy3robertstreet-stpaul

Hwy 5

Hwy 5 — Mississippi River to Minneapolis-St. Paul International Airport

Description: Highway and ramp resurfacing on Hwy 5 from Mississippi River to 34th Ave.

Construction dates: Construction begins spring 2020

More information: mndot.gov/metro/projects/hwy5mpls-stpaul

Hwy 5 — Green Isle

Description: Resurface from 5th St in Green Isle to Hwy 212
Construction dates: Construction July/August - October 2020
Traffic impacts: Detour
More information: mndot.gov/d7/projects/hwy5greenisle

Hwy 6

Hwy 6 — Talmoon

Description: Resurface between Talmoon and Itasca CR 136
Construction dates: July to September 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/hwy6-talmoon

Hwy 7

Hwy 7 — Victoria

Description: Stabilize the highway and shoulders and install an improved drainage system with curb and gutters and new shoulders between Merrywood Ln. and Waterford Ln. on Hwy 7.

Construction dates: August through October 2020

More information: mndot.gov/metro/projects/hwy7victoria

Hwys 10–19

Hwy 10

Hwy 10 and Hwy 47 — Anoka and Coon Rapids

Description: Resurface Hwy 10 in both directions between Hwy 47 and Hwy 65 and Hwy 47 between Anoka Co. Rd 10 and Hwy 10; Americans with Disabilities (ADA) improvements at the Hwy 47 and Co. Rd. 10 interchange and at the Hwy 10/610 and University Ave. (Co. Rd. 51) interchange.

Construction dates: Mid-September through October 2020

Traffic impacts: Lane and shoulder closures

Hwy 10 — Glyndon

Description: Pavement repair on eastbound Hwy 10 in Glyndon

Construction dates: 2020 construction season

More information: mndot.gov/d4/projects/glyndon

Hwy 10 — Detroit Lakes

Description: Intersection improvements at Kris Street and signal installation at County Road 54

Construction dates: 2020 construction season

More information: mndot.gov/d4/projects/easthwy10

Hwy 10 — Wadena

Description: Reconstruct Hwy 10 from Birch Ave to east of CR 4 in the city of Wadena, includes sidewalks, accesses and utilities.

Traffic Impacts: Lane closures, flaggers, staged detours
Construction dates: May 2019 - October 2020; work operations resume April 2020

More information: mndot.gov/d3/wadena

Hwy 11

Hwy 11 and Hwy 72 — Baudette/Rainy River International Bridge Replacement

Description: Replace bridge over the Rainy River
Construction dates: May 2018 to summer 2020
Traffic impacts: None (use old bridge until new bridge opens)
More information: mndot.gov/baudette-bridge

Hwy 12

Hwy 12 — Cokato

Description: Resurface from Sunset Ave. NW to 7th  St. SE, update pedestrian sidewalks; reconstruct access and replace signal at Wright Co. Rd. 3.; update accesses at Dassel-Cokato high school.
Traffic impacts: Lane and sidewalk closures, flaggers, access detour at Wright Co. Rd. 3
Construction dates: July through October 2020
More information: mndot.gov/d3/cokato

Hwy 12 and Hwy 22 — Litchfield

Description: Reconstruction of four blocks of Hwy 12 and Hwy 22 through downtown Litchfield.

Construction dates: June 2019 through November 2020

More information: mndot.gov/d8/projects/hwy12litchfield

Hwy 12 — Maple Plain to Delano

Description: Install flexible rubber safety poles in center of Hwy 12, remove trees on state property.

Construction dates: November 2019 through February 2020

Traffic impacts: Watch for flaggers and delays from 9 a.m. to 3 p.m. Dec. 26-27 and 30-31.

Hwy 12 — Montrose to Delano

Description: Resurface from Zephyr Ave. in Montrose to north of Bridge Ave. in Delano
Construction dates: August through October 2020

Traffic impacts: Lane closures

Hwy 12 and Hwy 40 — Willmar Wye Rail Connector & Industrial Access Project

Description: Realign Hwy 12 and reconstruct Hwy 40 to facilitate a railroad bypass on the west side of Willmar.

Construction dates: May 2019 through November 2020

More information: mndot.gov/d8/projects/willmarwye

Hwy 13

Hwy 13 — Prior Lake

Description: Reconstructing Hwy 13, constructing turn lanes, installing traffic signal and improving pedestrian crossings

Construction dates: May 2019 through 2020

More information: clients.bolton-menk.com/movingforward13-21

Hwy 14

Hwy 14 — New Ulm Gateway

Description: Complete bridge aesthetics and landscaping

Construction dates: Spring 2020

Traffic impacts: None

More information: mndot.gov/d7/projects/14newulmtonmankato

Hwy 14 — Owatonna to Dodge Center

Description: Four-lane expansion
Construction dates: Segment 1 construction complete. Segment 2 construction TBD.
More information: mndot/gov/d6/projects/hwy14

Hwy 15

Hwy 15 — Hutchinson

Description: Reconstruct and resurface Hwy 15 in Hutchinson
Construction dates: April to October 2020
More information: mndot.gov/d8/projects/hwy15downtownhutch

Hwy 18

Hwy 18 — East of Brainerd

Description: Replace bridge over Portage Creek west of Hwy 6
Traffic impacts: Detour
Construction dates: July to August 2020
More information: mndot.gov/d3/projects/2020/h18

Hwy 19

Hwy 19 — Morton slope repair

Description: stabilize slope and repair road on Hwy 19 near Morton
Construction dates: April 6 to May 7, 2020
More information: mndot.gov/d8/projects/hwy19sloperepair

Hwy 19 — New Prague

Description: Reconstruct Hwy 19 in downtown New Prague
Construction dates: 2020 – city led project
Traffic impacts: Detour

More information: mndot.gov/d7/projects/hwy19newprague

Hwys 20–29

Hwy 21

Hwy 21 — Jordan

Description: Replacing two bridges, repaving, adding trail, erosion and drainage repair.

Construction dates: February through late November 2020

Traffic impacts: Full closure of Hwy 21 with detours

More information: mndot.gov/metro/projects/hwy21-282-jordan

Hwy 23

Hwy 23 — Cottonwood to Granite Falls

Description: Resurface Hwy 23 from Cottonwood to Granite Falls.

Construction dates: May to November 2020

More Information: mndot.gov/d8/projects/hwy23cottonwoodtogranite

Hwy 23 — Deer Creek Bridge

Description: Replace Deer Creek Bridge on Hwy 23 just south of Pleasant Valley in Carlton County
Construction dates: May to October 2020
Traffic impacts: Bypass
More information: mndot.gov/d1/projects/hwy23bridge

Hwy 23 — East St. Cloud

Description: Resurface both directions from Benton Co. Rd. 1 to Hwy 95 east of St. Cloud. Reconstruct Hwy 23/Co. Rd. 8 access as a safer Reduced Conflict Intersection (RCI)

Traffic impacts: Lane and shoulder closures

Construction dates: September through October 2020

More information: mndot.gov/d3/projects/h23stc

Hwy 23 — Fond du Lac

Description: New road connection from Hwy 23 to Fourth Street in Fond du Lac
Construction dates: September to October 2020
Traffic impacts: Lane closures

More information: mndot.gov/d1/projects/hwy23roadconnection

Hwy 23 — Mission Creek

Description: Burial recovery and cemetery restoration

Construction dates: May 2017 (work has stopped, traffic impacts still in place)

Traffic Impacts: Lane closures

More Information: mndot.gov/d1/projects/hwy23-mission-creek

Hwy 23 — Nemadji River Bridge

Description: Replace Nemadji River Bridge on Hwy 23, 1.6 miles north of County Road 8 in Carlton
County
Construction dates: May to October 2020
Traffic impacts: One lane bypass
More information: mndot.gov/d1/projects/hwy23bridge-nemadji

Hwy 23/I-94 interchange — St. Cloud

Description: Add loop ramps to improve access to/from the Hwy 23/I-94 interchange
Impacts: Access detour to use Hwy 15/I-94 interchange, follow signs
Construction dates: July 2019 to June 2020
More information: mndot.gov/d3/i94

Hwy 24

Hwy 24 — Annandale

Description: Reconstruct from Hwy 55 to Poplar Ave. in Annandale, includes pedestrian sidewalks and city utilities
Traffic impacts: Detour(s)
Construction dates: April through November 2020
More information: mndot.gov/d3/projects/annandale

Hwy 25

Hwy 25 — Montrose

Description: Resurface and improve Hwy 25 from Hwy 12 to 7th St S., add new multiuse paved trail and install new water and sewer lines. (City of Montrose led project)

Construction dates: Fall 2019 to spring 2020

Traffic impacts: Detour via local streets

More information: montrose-mn.com

Hwy 25 — Watertown, and Mayer

Description: Resurface Hwy 25 south of Co. Rd. 30 in Mayer to State St in Watertown, update drainage and sidewalks to meet current American with Disability Standards (ADA).

Construction dates: June through fall 2020

More information: mndot.gov/metro/projects/hwy25mayer

Hwy 28

Hwy 28 — Sauk Centre

Description: Replace the bridge over Hoboken Creek west of Sauk Centre.
Traffic impacts: Detour
Construction dates: July through September 2020
More information: mndot.gov/d3/projects/2020/h28

Hwys 28, 29, and 114 — Starbuck Complete Streets

Description: Downtown complete streets reconstruction, resurface, utility replacement, ADA improvements and multi-use trail.
Construction dates: 2020 construction season
More information: mndot.gov/d4/projects/starbuck

Hwy 28 — Chokio to Morris

Description: Resurface, replace box culverts
Construction dates: 2020 construction season
More information: mndot.gov/d4/projects/hwy28

Hwy 29

Hwy 29 — Montevideo bridge

Description: Replace bridge on Hwy 29 over North Parkway Drive in Montevideo.
Construction dates: March through June 2020
More information: mndot.gov/d8/projects/hwy29montevideobridge

Hwys 30-39

Hwy 30

Hwy 30 — Chatfield to Rushford

Description: Repaving
Construction dates: August to November 2019
Traffic impacts: Single lane closures
More information: mndot.gov/d6/projects/hwy30-repaving

Hwy 30 — Cottonwood County

Description:Resurface from Cottonwood CR 7 to Hwy 71
Construction dates: July to September 2020
Traffic impacts: Lane restrictions
More information: mndot.gov/d7/projects/hwy30cottonwoodcounty

Hwy 30 and Hwy 22 — New Richland

Description: Resurface Hwy 30 from Hwy 22 to New Richland; replace two bridges
Construction dates: May through October 2020
Traffic Impacts: Detour
More information: mndot.gov d7/projects/hwy30-83newrichland

Hwy 32

Hwy 32 — Thief River Falls to St. Hilaire

Description: Resurface, pedestrian improvements in St. Hilaire
Construction dates: May to June 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/thief-river-falls

I-35

I-35 — Harris to Chisago/Pine County line

Description: Concrete pavement work, drainage updates and safety improvements

Construction dates: Fall 2018 through summer 2020

More information: mndot.gov/metro/projects/i35harris

I-35 — Lake Avenue Bridge

Description: Resurface Lake Avenue Bridge in Duluth, safety and mobility improvements
Construction dates: April to September 2020
Traffic impacts: Lane and ramp closures
More information: mndot.gov/d1/projects/lakeavenue

I-35, I-35E, I-35W North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 through spring 2020

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

I-35 — Pine City

Description: Replace the bridges at Hwy 70 and County Road 7

Construction dates: Mid-April to May 2020

Impact: Single lane closures

More information: mndot.gov/d1/projects/i35snakeriver

I-35E

I-35E — Standalone Noise Barrier in Eagan

Description: Construct new 3,500 foot long, 20 foot tall concrete noise barrier near NB I-35E between the Hwy 77 ramps and just south of Cliff Rd. in Eagan
Construction dates: November 2020 through July 2021
Traffic impacts:
Shoulder closures
More information: mndot.gov/metro/projects/standalonenoisebarrier

I-35E, I-35W, I-35 North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 through spring 2020

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

I-35W

I-35W — Burnsville and Bloomington

Description: Reconstruct I-35W bridge over the Minnesota River, replace pavement, add northbound lane

Construction dates: August 2018 through November 2021

Traffic impacts: Lane closures and detours

More Information: mndot.gov/metro/projects/i35wbloomington

I-35W and Hwy 52 — Metro Wide Noise Wall Repairs

Description: Repair select noise walls along I-35W and Hwy 52 in Dakota and Hennepin Counties
Construction dates: October 2018 through spring 2020
Traffic impacts:
Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/noisewallrepairs2018

I-35W and I-94 — Downtown to Crosstown (Minneapolis)

Description: Improve transit and regional access, reconstruct bridges and pavement
Construction dates: August 2017 through fall 2021
Traffic impacts:
Road, lane and ramp closures and delays
More information:
mndot.gov/35w94

I-35W — Richfield

Description: Concrete repairs on I-35W between 66th St. and 76th St. in Richfield
Construction dates: March through September 2020
Traffic impacts:
Weekend directional lane closures

More information: mndot.gov/35w94/schedule.html#projects

I-35W — Minneapolis

Description: Crews will build six stormwater storage tanks east of NB I-35W between 40th St. and 42nd St.
Construction dates: February 2020 through August 2023
Traffic impacts:
Overnight lane closures of NB I-35W; short-term closures of Second Ave.

More information: mndot.gov/35w94/schedule.html#projects

I-35W, I-35E, I-35 North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 through spring 2020

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

I-35W — Roseville to Lino Lakes

Description: Construct MnPASS Express Lanes (one lane in each direction) in the middle of existing I-35W between Hwy 36 in Roseville and Sunset Ave. (Co. Rd. 53) in Lino Lakes

Construction dates: Summer 2018 through fall 2021

More Information: mndot.gov/metro/projects/35wnorthmnpass

Hwy 36

Hwy 36 — Stillwater Lift Bridge

Description: Transformation into a bicycle/pedestrian crossing including repaired steel connections, restored mechanical and electrical components, repaired concrete railings, reconstructed concourse, paint and lighting replacements
Construction dates: August 2017 through spring 2020
Traffic impacts: The bridge is closed to all traffic, but will still operate to accommodate boat navigation.
More information: mndot.gov/metro/projects/liftbridge

Hwy 36 — St. Croix River Crossing

Description: Mitigation for construction of the new St. Croix River Crossing. Includes rehabilitation of the Stillwater Lift bridge, construction of the Upper Loop Trail along Hwy 95 and landscaping along Hwy 95 north of the bridge and in the interchange of Hwy 36 and Hwy 95
Construction dates: May 2014 through spring 2020
Traffic impacts: Road closure and detour, lane closures, shoulder closures, noise impacts
More information: mndot.gov/stcroixcrossing

Hwy 37

Hwy 37 — Gilbert

Description: Resurfacing, safety and accessibility improvements on Hwy 37 from Hwy 53 to Hwy 135
Construction dates: July to October 2020, and May to Augusut 2021
Traffic impacts: Lane closures
More information: mndot.gov/d1/projects/hwy37-gilbert

Hwys 40-59

Hwy 40

Hwy 40 — Milan Bridge

Description: Replace bridge (known as Milan Bridge) over Lac qui Parle Lake west of Milan.
Construction dates: May 2019 to summer 2020
More information: mndot.gov/d8/projects/hwy40-bridge-milan

Hwy 41

Hwy 41 — Chaska

Description: Landscape, reconstruct and expand road, improve intersection, signals and pedestrian ramps, relocate trail and build underpass for trail between Hwy 212 and Pioneer Trail. Project lead is Carver County.

Construction dates: May 2018 through summer 2019

Traffic Impacts: Lane and turn lane closures

More information: co.carver.mn.us/departments/public-works/projects-studies/highway-41-project-jonathan

Hwy 47

Hwy 47 — Isle to Ogilvie

Description: Reconstruct 22 miles of road surface, improve road access and update drainage between Hwy 27/47 in Isle and Hwy 23 in Ogilvie. Replace two bridges near Ann Lake.
Traffic impacts: Detour(s)
Construction dates: May through November 2020
More information: mndot.gov/d3/projects/h47isletoogilvie

Hwy 47 and Hwy 10 — Anoka and Coon Rapids

Description: Resurface Hwy 10 in both directions between Hwy 47 and Hwy 65 and Hwy 47 between Anoka Co. Rd 10 and Hwy 10; Americans with Disabilities (ADA) improvements at the Hwy 47 and Co. Rd. 10 interchange and at the Hwy 10/610 and University Ave. (Co. Rd. 51) interchange.

Construction dates: Mid-September through October 2020

Traffic impacts: Lane and shoulder closures

Hwy 47 and Hwy 65 — Columbia Heights to Coon Rapids

Description: Conduct a roadway safety audit to analyze crash information with a focus on pedestrian crashes on Hwy 47 and Hwy 65 between the Hennepin-Anoka County line in Columbia Heights and Hwy 10 in Coon Rapids.

Construction dates: Spring 2020 through 2021

More information: mndot.gov/metro/projects/hwy47andhwy65safetyaudit

Hwy 52

Hwy 52 and I-35W — Metro Wide Noise Wall Repairs

Description: Repair select noise walls along I-35W and Hwy 52 inn Dakota and Hennepin Counties
Construction dates: October 2018 through spring 2020
Traffic impacts:
Lane, ramp and shoulder closures
More information: mndot.gov/metro/projects/noisewallrepairs2018

Hwy 53

Hwy 53 — International Falls

Description: Reconstruct Hwy 53 from Crescent Drive to 4th Street and on Hwy 11 from the east junction of Hwy 71 to the east junction of Hwy 53 in International Falls in St. Louis County; complete streets improvements
Construction dates: July to October 2020, and May to October 2021
Traffic impacts: Lane closures, local detours
More information: mndot.gov/d1/projects/hwy-53-international-falls

Hwy 53, Hwy 1 — St. Louis, Koochiching Counties

Description: Intersection improvement, passing lanes project

Construction dates: 2019 to 2020

More information: mndot.gov/d1/projects/hwy53-1-st.-louis-koochiching

Hwy 53 — Virginia

Description: Turn lanes, traffic signal and accessibility improvements at 13th Street, Mount Iron Drive, 12th Avenue West and Second Avenue West in Virginia in St. Louis County
Construction dates: July to October 2020
Traffic impacts: Lane closures, local detours
More information: mndot.gov/d1/projects/hwy-53-virginia-signal-improvements

Hwy 55

Hwy 55 (Hiawatha) — Minneapolis Storm Sewer project

Description: Repair storm sewer pipe that takes water from Hwy 55 in Minneapolis to the Mississippi River. The work can only be done during cold temperatures.

Construction dates: December 2018 through March 2020

Traffic impacts: 28th St. closed between 42nd Ave. and alley east of 42nd Ave.

Hwy 55 — Pomme de Terre Bridge Replacement

Description: Replace the bridge at Pomme de Terre River, southeast of Barrett

Construction dates: 2020 construction season

More information: mndot.gov/d4/projects/hwy55

Hwy 55 Bridge — Plymouth

Description: Repair concrete, replace joints and make improvements to the barrier on the WB Hwy 55 bridge over the Luce Line and the railroad tracks.

Construction dates: August through October 2020

Traffic impacts: Lane restrictions and trail closure

More information: mndot.gov/metro/projects/hwy55bridge-plymouth

Hwy 59

Hwy 59 — Newfolden

Description: Replace two culverts
Construction dates: July to September 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/hwy59-newfolden

Hwy 59 and Hwy 14 — Slope repairs

Description: Stabilize slopes in Lyon, Murray and Redwood counties

Construction dates: July to September 2020

More information: mndot.gov/d8/projects/hwy59hwy14slopes

Hwys 60-79

Hwy 61

Hwy 61 — Grand Marais

Description: Reconstruct, resurface Hwy 61 in Grand Marais, accessibility, drainage improvements from just north of Cutface Creek to just north of Hwy 14 in Grand Marais in Cook County
Construction dates: December 2019 to 2021
Traffic impacts: Lane closures, detours
More information: mndot.gov/d1/projects/hwy-61-grand-marais

Hwy 61 — Grand Portage

Description: Resurfacing and bridge project from Reservation Bay Road to the Canadian Border in
Cook County
Construction dates: July 2020 to fall 2021
Traffic impacts: Lane closures, local detour
More information: mndot.gov/d1/projects/hwy61grandportage

Hwy 61 — Kellogg to Lake City

Description: Resurfacing

Construction dates: TBD

Traffic impacts: TBD

More Information: mndot.gov/d6/projects/hwy61-resurfacing

Hwy 63

Hwy 63 — Red Wing bridges

Description: Rehabilitate existing bridges, identify a preferred alternative for a bridge crossing between Red Wing, Minn. and Wisconsin

Construction dates: May 2017 to August 2020

More information: mndot.gov/d6/projects/redwing-bridge

Hwy 65

Hwy 65/Third Avenue Bridge — Minneapolis

Description: The Hwy 65/Third Ave. bridge will get major renovation improvements including a new bridge deck.

Construction Dates: May 2020 through August 2022

Traffic Impacts: Lane and bridge closures
More information: mndot.gov/metro/projects/hwy65andthirdavebridge

Hwy 65 and 41st Avenue — Columbia Heights

Description: Replace signal system at intersection of Hwy 65 and 41st Ave. Install audible pedestrian signals and upgrade pedestrian crossing to ADA standards.

Construction dates: Early September 2019 through spring 2020

Traffic impacts: Daytime non-peak lane closures. Pedestrian and business access will be maintained at all times.

Hwy 65 — Isanti

Description: Improve access; install a reduced conflict intersection to improve access at Hwy 65/Cajima St NE, Isanti. (City of Isanti-led project)

Impacts: Lane and shoulder closures

Construction dates: July through September 2020
More information about reduced conflict intersections: mndot.gov/roadwork/rci

Hwy 67

Hwy 67 — Morgan

Description: Resurface road. Project led by City of Morgan.

Construction dates: Summer 2018 to 2021

More information: mndot.gov/d8/projects/hwy67morgan

Hwy 67 — Upper Sioux Agency State Park

Description: Road closed, slope failure

Investigation dates: 2019-2020

More information: mndot.gov/d8/projects/hwy67statepark

Hwy 71

Hwy 71 — Jackson to Windom and Windom to Hwy 30

Description: Resurfacing and bridge replacement

Construction dates: May to August 2020

Traffic impacts: Detour for bridge replacement near Jackson

More information: mndot.gov/d7/projects/hwy71jackson

Hwy 71 — Long Prairie

Description: Replace bridge over Long Prairie River in Long Prairie; resurface Hwy 71 one mile north of Long Prairie.
Traffic impacts: Detour
Construction dates: Mid-May through early September 2020
More information: mndot.gov/d3/projects/2020/h71

Hwy 71 — Park Rapids

Description: Install truck route signs, install intersection lighting
Construction dates: June 2020
Traffic impacts: None
More information: mndot.gov/d2/projects/2020/hwy71-parkrapids

Hwy 72

Hwy 72 — Blackduck

Description: Replace 3 culverts between Blackduck and Kelliher
Construction dates: August to October 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/hwy72-blackduck

Hwy 72 — Wakish

Description: Resurface 14 miles of rural Hwy 72 between Waskish and Baudette
Construction dates: May to June 2020
Traffic impacts: Lane closures
More information: mndot.gov/d2/projects/2020/hwy72-waskish

Hwy 73

Hwy 73 — Railroad bridge

Description: Rehabilitate the Hwy 73 bridge over the BNSF Railroad on Hwy 73, 2.5 miles south of Hwy 169 in St. Louis County
Construction dates: May to October 2020
Traffic impacts: Detour
More information: mndot.gov/d1/projects/hwy73-rr-bridge

Hwy 75

Hwy 75 — Argyle

Description: Resurface and pedestrian improvements
Construction dates: July to October 2020
Traffic impacts: Lane closures
More information: mndot.gov/d2/projects/2020/hwy75-warren-argyle

Hwy 75 — Mustinka River Bridge replacement

Description: Replace bridge over Mustinka River; resurface from Fifth Street in Wheaton to Mustinka River
Construction dates: 2020 construction season
More information: mndot.gov/d4/projects/hwy75mustinka

Hwy 75 — Pipestone

Description: Resurface Hwy 75 from Madison to Bellingham.
Construction dates: TBD
More information: mndot.gov/d8/projects/hwy75madisontobellingham

Hwy 75 — Pipestone bridge

Description: Replace bridge on Hwy 75 over Pipestone Creek.
Construction dates: June to November 2020
More information: mndot.gov/d8/projects/hwy75pipestonebridge

Hwy 75 — Warren

Description: Resurface and pedestrian improvements on Hwys 1 and 75
Construction dates: July to October 2020
Traffic impacts: Lane closures
More information: mndot.gov/d2/projects/2020/hwy75-warren-argyle

Hwys 80-99

Hwy 87

Hwy 87 — Frazee to Menahga

Description: Clear cut all trees and vegetation in right of way ahead of 2021 construction project
Construction dates: Winter 2020-21
More information: mndot.gov/d4/projects/frazee

I-90

I-90 — Fairmont to Blue Earth corridor preservation

Description: Pavement restoration and bridge rehab

Construction dates: 2019-2020

Traffic impacts: Lane restrictions

More information: mndot.gov/d7/projects/I90preserve

I-90 — Hayward and Oakland Woods Rest Area

Description: Rest area reconstruction
Construction Dates: June 2019 to October 2020
Traffic impacts: Rest area will be closed during construction
More information: mndot.gov/d6/projects/i90-rest-areas

I-90 and Hwy 61 — Dresbach

Description: Resurfacing I-90 and Hwy 61 resurfacing - Dresbach

Construction dates: August to November 2019

Traffic impacts: Single lane traffic on I-90 and Hwy 61 during paving

More information: mndot.gov/d6/projects/i90-hwy61-repaving

Hwy 91

Hwy 91 — Adrian North

Description: Resurface from Adrian to Nobles/Murray County line

Construction Dates: 2019 to late-June 2020

Traffic Impacts: Lane restrictions
More information: mndot.gov/d7/projects/hwy91

Hwy 91 — Nobles/Murray County line to Russell

Description: Resurface Hwy 91 from Nobles/Murray County line to Russell, replace four bridges, repair culverts, improve sidewalks in Lake Wilson

Construction Dates: July 2019 through October 2020
More information: mndot.gov/d8/projects/hwy91Russell

I-94 in Twin Cities Metro

I-94 and I-35W — Downtown to Crosstown (Minneapolis)

Description: Improve transit and regional access, reconstruct bridges and pavement
Construction dates: August 2017 through fall 2021
Traffic impacts: Lane and ramp closures
More information:
mndot.gov/35w94

I-94 — Minneapolis bridge over 17th Avenue

Description: Crews will repair and paint the bridge over the blue line light-rail transit at 17th Ave.

Construction dates: 2020

Traffic impacts: Up to three weekend closures, partial closure of the Hiawatha Trail with detour, possible freeway lane closures.

More Information: mndot.gov/metro/projects/i94bridge-mpls

I-94 — Minneapolis

Description: Resurface road and ramps on I-94 between Nicollet Ave. and Hwy 280
Construction dates: Summer 2020
Traffic impacts:
Weekend and overnight directional lane and ramp closures
More information:
mndot.gov/35w94/schedule.html#projects

I-94 — East Metro Interchange project (I-694/I-494/I-94)

Description: Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

Construction dates: 2019 through late fall 2020

Traffic impacts: Lane, ramp closures and delays

More Information: mndot.gov/metro/projects/i94-494-694

I-94 — Maple Grove to Clearwater

Description: Resurface road, replace/construct bridges, add lanes and improve access
Construction dates: August 2019 through fall 2021
Traffic impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

More Information: mndot.gov/i94-mg-clearwater

I-94 — Saint Paul

Description: ADA pedestrian ramps and sidewalk improvements along St. Anthony Ave. and Concordia Ave. Periodic enhancements will occur along the project area.

Construction dates: April through November 2020

Pedestrian impacts: Sidewalk closures

More information: mndot.gov/metro/projects/i94stpaul-ada

I-94 — Dale Street Bridge in Saint Paul

Description: Reconstruct Dale St. (Co. Rd. 53) between Iglehart Ave. and University Ave. and the Dale St. bridge over I-94.
Construction dates: March 2020 through July 2021
Traffic impacts:
Lane and ramp closures with detours
More information:
ramseycounty.us/residents/roads-transit/future-road-construction-projects/dale-street-reconstruction

I-94 in Greater Minnesota

I-94 — Maple Grove to Clearwater

Description: Resurface road, replace/construct bridges, add lanes and improve access
Construction dates: August 2019 to fall 2021
Traffic impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

More Information: mndot.gov/i94-mg-clearwater

I-94 — Melrose to Freeport

Description: Resurface both directions of I-94 between Melrose and Freeport (nine miles) in Stearns County
Traffic impacts: Daytime single lane closures
Construction dates: Late summer 2020
More information: mndot.gov/d3/i94

Hwy 95

Hwy 95 — Bayport and Lakeland

Description: Repair pavement, Update drainage, Upgrade sidewalks and curb ramps

Construction dates: Work begins spring 2020
More information: mndot.gov/metro/projects/hwy95bayport

Hwy 95 and Manning Avenue — Washington County safety improvements

Description: Widening shoulders, resurface road, add turn lanes and update drainage.

Construction dates: July 2017 through late fall 2021

Traffic impacts: Closures, detours

More information: mndot.gov/metro/projects/hwy95safetyimprovements

Hwy 97

Hwy 97 — Forest Lake

Description: Constructing left turn lanes on Hwy 97 at North Shore Trail and at Keewahtin Ave. North.

Construction: Spring through fall 2020

More information: mndot.gov/metro/projects/hwy97forestlake

Hwys 100-199

Co. Rd. 101

Co. Rd. 101/Central Ave. Bridge over Hwy 12 — Wayzata

Description: Repair the Co. Rd. 101/Central Ave. Bridge over Hwy 12, add left turn lanes, reconstruct approaches, and repair ramp pavement

Construction dates: Late April/early May 2019 through spring 2020

More information: mndot.gov/metro/projects/hwy12andcountyroad101bridge

Hwy 111, Hwy 22 — Nicollet to Gaylord

Description: Resurface from Nicollet to Gaylord

Construction dates: May to October 2020

Traffic impacts: Detour

More information: mndot.gov/d7/projects/hwy111-22nicollet

Hwy 135

Hwy 135 — Biwabik

Description: Reconstruct Hwy 135 in Biwabik; complete streets improvements
Construction dates: July to September 2020, and May to October 2021
Traffic impacts: Lane closures, possible detour
More information: mndot.gov/d1/projects/hwy135biwabik

Hwy 149

Hwy 149 High Bridge (Smith Ave. and Dodd Rd.) — St. Paul to Mendota Heights

Description: Landscaping

Construction dates: Spring 2020 through June 2021

Traffic impacts: Possible shoulder closures

More information: mndot.gov/metro/projects/hwy149highbridge

Hwy 169 in the Twin Cities Metro

Hwy 169 and 101st Avenue interchange — Brooklyn Park

Description: The city of Brooklyn Park is constructing a new interchange at Hwy 169 and 101st Ave.

Construction Dates: March through November 2020

Traffic impacts: Hwy 169 lane and traffic shifts, no anticipated lane closures

More information: projects.srfconsulting.com/hwy169and101st

Hwy 169 and Hwy 41 intersection improvements — Scott County

Description: MnDOT and Scott County are constructing a new interchange at Highways 169/41/78 in Jackson and Louisville townships

Construction Dates: Fall 2018 through fall 2020

Traffic impacts: Hwy 169 lane closures and traffic shifts, temporary full road closures and detours, restricted access to Hwy 41 and Co. Rd. 78 from Hwy 169, and permanent access changes.

More information: scottcountymn.gov/1778/Highways-1694178-Interchange

Hwy 169 — Plymouth

Description: Place concrete barrier on Rockford Rd. bridge

Construction: Mid-May to late May 2020

Traffic impacts: Two weekend closures of Hwy 169 near the Rockford Rd. bridge

Hwy 169 in Greater Minnesota

Hwy 169 — near Milaca

Description: Install Reduced Conflict Intersections (RCI) at Mille Lacs Co. Rd. 11 north of Milaca, and Co. Rd. 12 and Co. Rd. 13 south of Milaca.

Construction dates: May to June 2020
Traffic impacts: Lane closures
More information: mndot.gov/d3/projects/rci/h169

Hwy 169 — Nashwauk

Description: Construct intersection safety improvements at the intersection of Hwy 169 and Hwy 65 Nashwauk
Construction dates: July to August 2020
Traffic impacts: Lane closures, local detour
More information: mndot.gov/d1/projects/hwy-169-nashwauk

Hwy 169 — Saint Louis County

Description: Resurfacing Hwy 169 from Hwy 53 to CR 26 in St. Louis County, incudes NB Hwy 169 ramp
Construction dates: July to October 2020
Traffic impacts: Lane closures
More information: mndot.gov/d1/projects/hwy169resurfacing

Hwy 169 — Vineland

Description: Install pedestrian High Intensity Activated Crosswalk System (HAWK) system at Hwy 169/Ataage Dr. in Vineland. Project led by Mille Lacs Band of Ojibwe

Construction dates: Late summer 2020
Traffic impacts: Single lane or shoulder closures
More information: mndot.gov/d3/hottopics/hawk.html

Hwy 172

Hwy 172 — Baudette

Description: Resurface between Baudette and Wheeler’s Point
Construction dates: August to October 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/hwy172-baudette

Hwys 200-299

Hwy 200

Hwy 200 — Laporte

Description: Reconstruct and raise grade
Construction dates: June to September 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/hwy200-laporte

Hwy 200 — Whipholt

Description: Historic restoration at roadside parking area
Construction dates: June to September 2020
Traffic impacts: None (boat access closed for one to two weeks)
More information: mndot.gov/d2/projects/2020/hwy200-whipholt

Hwy 212

Hwy 212 — Norwood Young America

Description: Repave Hwy 212 from Hwy 25/5 to Cologne

Construction dates: Spring through fall 2020

More information: mndot.gov/metro/projects/hwy212nya

Hwy 220

Hwy 220 — Oslo

Description: Replace bridges over the Snake and Tamarac Rivers north of Oslo
Construction dates: Summer 2019 to late-June 2020
Traffic impacts: Detour
More information: mndot.gov/d2/projects/2020/hwy220-oslo

Hwys 300-694

Hwy 313

Hwy 313 — Warroad

Description: Resurface between Warroad and Canada
Construction dates: September to October 2020
Traffic impacts: Lane closures
More information: mndot.gov/d2/projects/2020/hwy313-warroad

I-394

I-394 — Minneapolis

Description: Repair I-394 bridge over Dunwoody Blvd. in Minneapolis.

Construction dates: September 2019 through summer 2020

Traffic Impacts: Closure of trail under bridge, ramp closures and directional overnight closures of I-394

I-494

I-494 — Mendota to South St. Paul

Description: Bridge deck resurfacing and auxiliary lane addition

Construction dates: Fall 2018 through fall 2020

Traffic Impacts: Lane and ramp closures with detours

More information: mndot.gov/metro/projects/i494invergroveheights

I-494, I-94 — East Metro Interchange project (I-694/I-494/I-94)

Description: Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

Construction dates: 2019 through late fall 2020

Traffic impacts: Lane, ramp closures and delays

More Information: mndot.gov/metro/projects/i94-494-694

I-494 — Richfield

Description: Build tunnel under I-494 at Knox Ave. for Orange line bus rapid transit.

Construction dates: August 2019 to October 2021

Traffic impacts: Closure of ramps from SB I-35W to WB I-494 and from EB I-494 to SB I-35W

More information: metrotransit.org/metro-orange-line

I-694

I-694, I-94 — East Metro Interchange project (I-694/I-494/I-94)

Description: Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

Construction dates: 2019 through late fall 2020

Traffic impacts: Lane, ramp closures and delays

More Information: mndot.gov/metro/projects/i94-494-694

I-694/Rice St. Interchange — Shoreview, Little Canada, Vadnais Heights

Description: Build a new bridge and an offset single point interchange with three roundabouts

Construction dates: April 2019 through fall 2020

More information: ramseycounty.us/694Rice

Hwy 210

Hwy 210 — West of I-94 near Fergus Falls

Description: Concrete reconstruct, snow fence, lighting  
Construction dates: 2020 construction season
More information: mndot.gov/d4/projects/hwy210