Project complete
Sod will be installed in spring 2023.
About this project
Summary of work
- Reconstruct Hwy 6 between Etna Ave. and 3rd Ave E., includes reconfigured design:
- One-lane in each direction, a center turn-lane, side street parking on both sides and a grass boulevard along the sidewalk
- Resurface (asphalt) from Hwy 6 to Etna Ave and 3rd Ave to Hwy 200
- Improve or repair pedestrian sidewalks and road approaches
- Update overhead street lighting
- Replace or repair storm sewer, curb, gutter and ditch drainage
- City water main work
Roadwork on Hwy 6 in Remer in 2022. Click map to enlarge.
Meetings
June 9, 2022