Project Complete
Final lighting cabinet will be installed in December.
St. Louis County
Final lighting cabinet will be installed in December.
MnDOT, in partnership with St. Louis County, conducted an Intersection Control Evaluation study at the intersection of Hwy 37/Cty Rd 7. The study found a roundabout would be the best way to improve the safety of the high risk intersection.
Watch: Intersection of Hwy 37 and County Road 7 at morning peak hours
Watch: Intersection of Hwy 37 and County Road 7 at afternoon peak hours
Watch: Intersection of Hwy 37 and County Road 7 with a double hauler
Watch: Intersection of Hwy 37 and County Road 7 with a superload transporter