Project complete
In 2021, the Minnesota Department of Transportation completed a project on Highway 87 from Frazee to the Becker/Wadena county line.
Project details
Frazee to Menahga
- Tree clearing. Clear cut all trees and vegetation 65 feet from both sides of the center of Highway 87. Link to the MnDOT Integrated Roadside Vegetation Management Plan
North River Drive in Frazee to Evergreen
- Robust resurfacing (reclaim)
- Shoulder widening, with 8 additional feet on each side of the highway
- Centerline and box culvert replacements and improvements
Evergreen to the Becker/Wadena county line
- Robust resurfacing (reclaim)
- Culvert work and improvements