Minnesota Department of Transportation

511 Travel Info

Hwy 12

Chippewa River, Cottonwood Creek and County Ditch 3 Bridge replacements

Project details

Project map for Highway 75 Mustinka River bridge replacement and resurfacing from the bridge to Fifth Street in Wheaton
Project map for the 2023 project near Benson
Project map for Highway 75 Mustinka River bridge replacement and resurfacing from the bridge to Fifth Street in Wheaton
Project map for the 2023 project 6.6 miles East of Hwy 59
Project map for Highway 75 Mustinka River bridge replacement and resurfacing from the bridge to Fifth Street in Wheaton
Project map for the 2023 project near Danvers

In 2023, the Minnesota Department of Transportation will begin a projects to replace the bridges over the Chippewa River, Cottonwood Creek and County Ditch 3.

Key project elements

  • Replace bridges over Chippewa River, Cottonwood Creek and County Ditch 3

Future traffic impacts

  • Road closed, detour
  • Local traffic: road will be impassable at the bridge site