Technical Memoranda
MnDOT’s Active and Historical Technical Memoranda (TM)
Tech Memo | Subject | Issue Date | Expire Date |
Commissioner's Equipment Rental Schedule | 6/07/2024 | 12/31/2025 |
|
Adhesive Anchoring Systems in Sustained Tensile-Load Applications | 6/04/2024 | 12/27/2028 |
|
Tree Clearing Timing Requirement | 2/21/2024 | 12/31/2028 |
|
Interchange Ramp Terminal Configuration | 12/20/2023 | 12/31/2029 |
|
Dissolution of Supplemental Specifications to the MnDOT Standard Specifications for Construction, 2020 Edition | 7/07/2023 | 7/19/2026 |
|
E-ZPass Lanes Design and Implementation Guidelines | 12/20/2022 | 12/31/2026 |
|
Minnesota Work Zone Safety and Mobility Requirements | 12/13/2022 | 11/08/2027 |
|
Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways | 5/06/2022 | 4/18/2027 |
|
Bridge Preservation and Improvement Guidelines | 4/07/2022 | 6/30/2026 |
|
MnDOT Provisions for Pavement Marking Operations | 1/20/2022 | 1/05/2027 |
|
Restricted Crossing U-Turn (RCUT) Design and Implementation Guidance | 1/04/2022 | 11/15/2026 |
|
Under-Bridge Typical Section | 12/07/2021 | 11/01/2026 |
|
Storm Drain Design Frequency and Catch Basin Spacing | 10/19/2021 | 10/11/2026 |
|
MnDOT Standard Specifications for Construction | 7/26/2021 | 7/19/2026 |
|
Use of Atlas 14 Volume 8 Precipitation Frequency Estimates | 12/16/2020 | 11/23/2025 |
|
Reinforced Concrete Pipe Load Tables | 3/16/2020 | 2/25/2025 |
|
Use of Geo-Synthetic Reinforced Soil- Integrated Bridge System (GRS-IBS) Abutments | 3/09/2020 | 2/26/2025 |
|
MnDOT Bicycle Facility Design Manual | 2/04/2020 | 1/22/2025 |
|
Crashworthy Requirements for Temporary Traffic Control Devices | 8/14/2019 | 12/31/2024 |
|
W-Beam Bull Nose. | 10/03/2001 | 1/01/2099 |
|
Please refer to the State-Aid website. (Link will redirect you) | 1/01/2000 | 12/31/2099 |