Minnesota Department of Transportation

511 Travel Info

Flood Mitigation

 

banner image

Mitigation projects

Twin Cities metro area

Hwy 101 Minnesota River crossing between Shakopee and Chanhassen
Construct new bridge north of existing Hwy 101 Minnesota River Bridge and raise existing two-lane roadway
$20,035,500
Construction 2014-2015

Hwy 25 next to the south fork of the Crow River in Carver County
Raise existing roadway
$350,000
Constructed 2013

Northeastern Minnesota

Hwy 75 north of Breckenridge
Realign Hwy 75 south of Whiskey Creek, replace bridge over Whiskey Creek and construct bridge over rail tracks
$6 million
Construction 2015-2016

Hwy 61 south of Grand Marais
Replace culvert with single-span bridge and adjust channel
$2 million
Construction 2015

Hwy 108 west of Pelican Rapids in Norwegian Grove township
Construct outlet for water to drain
$282,500
Constructed 2014

Hwy 25 next to the south fork of the Crow River in Carver County
Raise existing roadway
$350,000
Constructed 2013

Hwy 1 near Murphy City
Raise existing roadway by four feet
$450,000
Constructed 2013

Hwy 23 bridge over the St. Louis River
Control erosion around bridge piers
$340,000
Constructed 2013

Hwy 217 bridge in Littlerock
Control erosion around three bridge piers
$110,000
Constructed 2012

Hwy 12 east of Ortonville
Install underground drainage system and new ditch
$92,000
Constructed 2012

Northwestern Minnesota

Hwy 9 south of Ada
Raise existing roadway and bridge
$1 million
Construction 2016

Hwy 310 five miles north of Roseau
Raise existing roadway and increase drainage capacity
$1.5 million
Construction 2016

Hwy 75 from Perley to Shelly
Pave shoulder and in-slope
$600,000
Construction 2015-2016

Hwy 75 north of Humboldt
Raise existing roadway and increase drainage capacity
$750,000
Construction 2015-2016

Hwy 2 in Crookston
Construct permanent lift station at underpass
$250,000
Constructed 2013

Hwy 59 bridge in Thief River Falls
Repair bridge pier and protect from erosion
$1.6 million
Constructed 2013

Hwy 200 west of Ada
Replace two culverts, raise road grade
$600,000
Constructed 2013

Hwy 9 and Hwy 200 south and west of Ada
Protect shoulder slopes from erosion
$400,000
Construction 2012-16

Hwy 220 north of Hwy 1
Protect shoulder slopes from erosion
$900,000
Construction 2012-16

Hwy 32 bridge in Red Lake Falls
Construct wall or jetty
$400,000
Constructed 2011

Hwy 220 from Hwy 1 to Hwy 11, Hwy 317 from the Red River to Hwy 220
Pave shoulder and in-slope
$210,160
Constructed 2011

Southwestern Minnesota

Hwy 14 between Tyler and Florence
Raise existing roadway
$940,000
Construction 2014-2015

Southeastern Minnesota

Hwy 14 between Stockton and Winona
Rehabilitate box culverts
$556,700
Constructed 2012

Hwy 44 from Caledonia to Hokah
Reconstruct truck lane, ditches and drainage structures
$360,000
Constructed 2012

Hwy 60 near Buchman Coulee
Repair shoulder and ditch
$20,000
Constructed 2012

South central Minnesota

Hwy 22 in St. Peter
Raise existing roadway and bridge approaches
$3.96 million
Construction 2015-2016

Hwy 169 north of St. Peter
Raise existing roadway
$1.67 million
Constructed 2014

Hwy 169 in St. Peter
Raise existing roadway
$2.47 million
Constructed 2014

West central Minnesota

Hwy 75 north of Breckenridge
Realign Hwy 75 south of Whiskey Creek, replace bridge over Whiskey Creek and construct bridge over rail tracks
$6 million
Construction 2016

Hwy 108 west of Pelican Rapids in Norwegian Grove township
Construct outlet for water to drain
$282,500
Constructed 2014

Hwy 12 east of Ortonville
Install underground drainage system and new ditch
$92,000
Constructed 2012

Hwy 12 one mile east of Ortonville
Reconstruct ditch
$125,000
Constructed 2011

Hwy 59 near Sand Lake
Construct outlet for water to drain
$898,714
Constructed 2011

Hwy 108 near Rice Lake
Raise existing roadway
$1 million
Constructed 2011