Hwy 212

Norwood Young America

Traffic impacts

Hwy 212 in Norwood Young America project location map
Hwy 212 in Norwood Young America project location map.
Click map for larger version
.

All traffic impacts are tentative and weather dependent. Access to businesses and residences will remain throughout the project via detours.

Current

Road closures

9 a.m. Sat, Aug. 1 through mid-August
  • Faxon Rd. on the south side of Hwy 212 is closed
  • Faxon Rd. traffic is limited to a right in and right out only on the north side of Hwy 212
9 a.m. Sat, Aug. 1 through mid-September
  • Morse St. on the north side of Hwy 212 is closed
  • Morse St. on the south side of Hwy 212 is closed permanently
7 a.m. Mon, July 20 through 8 a.m. Sat, Aug. 1
  • Reform St. is closed in both directions between Hwy 212 and just north of Wilson St. W

Lane closures

Fri, June 12 through Tue, Sept. 1
  • Hwy 212 is reduced to a single lane in both directions between Hwy 25 and Tacoma Ave.

Upcoming

Information about upcoming traffic impacts will be posted as details become available.

About this project

Summary of work

  • Repave Hwy 212 between Hwy 5/25 and Co. Hwy 36 in Cologne
  • Construct pedestrian underpass and trails
  • Construct Reduced Conflict Intersection (RCI)
  • Close Morse St. access south of Hwy 212
  • Replace signals add turn lanes and update ADA to meet current standards