About this project
Hwy 97 will be reconstructed between I-35 and Hwy 61 to improve traffic flow and safety. Turn lanes will be added at specific intersections along the highway and a single-lane roundabout at Fenway Ave. also will be constructed. A raised median will be added to divide east and westbound traffic on the two-lane roadway. The median will also serve as an accessible pedestrian crossing. A new multi-use trail will be constructed along the south side of Hwy 97 to provide a safer space for pedestrians and bicyclists, as well as a connection to the Hardwood Creek Regional Trail.
Summary of work
- Reconstruct roadway and add raised medians
- Add turn lanes at specific intersections
- Build a single-lane roundabout
- Construct multi-use trail
- Upgrade pedestrian accessibility
- Repair/replace drainage
Project visualization
Check out a video visualization of what the finished project area is anticipated to look like.
Project timeline
Construction will be done in two stages, with one half of the road under construction each year.
- Stage 1 (June through late fall 2025): Hwy 97 from Hornsby St. to Falcon Ave.
- Stage 2 (2026): Hwy 97 from Falcon Ave. to Forest Rd.