Minnesota Department of Transportation

511 Travel Info

Project selection

Increasing the transparency of how we select highway construction projects

Urban non-freeway/non-expressway pavement projects

MnDOT Metro District

Scoring criteria for urban non-freeway, non-expressway pavement projects. Out of 100 possible points, 25 points are based on the timing of the improvement, 25 points are based on cracking, rutting and patching, 10 points are based on traffic volume, 10 points are based on compliance with the Americans with Disability Act, 10 points are based on active transportation and transit, 10 points are based on other infrastructure needs, 5 points are based on the condition of local utilities under the road, and 5 points are based on whether the project will benefit an environmental justice population.

Learn more about how MnDOT evaluates and selects urban pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. MnDOT scores and prioritizes urban non-freeway/non-expressway pavement projects separately from the normal pavement scoring process, because of their complexity, utilities and other infrastructure and level of required local coordination and public involvement. In many instances, these roads function both as state highways and as city streets. These pavement projects can be on either National Highway System or non-NHS.

Freeways have full access control (no driveways, signals or at-grade intersections). Expressways have partial access control (limited or no driveways, few and widely spaced intersections, and may include some grade separated crossings). Both are high speed roads designed to facilitate longer trips.

For the purposes of this scoring category, MnDOT uses a flexible, context-based definition of urban. This includes areas with medium-to-high density adjacent development with small to medium setbacks, and in some instances no setback. This includes both residential, industrial and commercial areas. In some instances, the urban context may cover less than a quarter mile.

Urban pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related Links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.

Last updated October 2024

Score Route  Community Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
45 Hwy 120 Oakdale, Maplewood Medium mill and overlay from Ridge Dr to 4th St  $1,400,000 Not Selected  Projected poor pavement conditions.
30 Hwy 121 Minneapolis Medium mill and overlay from Pedestrian Bridge to 58th ST  $1,200,000 Not Selected  Poor pavement conditions.
50 Hwy 13 LILYDALE, MENDOTA, MENDOTA HEIGHTS Resurface Hwy 13 from Hwy 55 to Hwy 13 in St. Paul $13,296,239 2032 NA
60 Hwy 156 Saint Paul  Medium mill and overlay from Dakota/Ramsey County Line to US52 $500,000 Not Selected  Program limited by available funding.
55 Hwy 156 South Saint Paul  Medium mill and overlay from I-494 to Armour Ave $600,000 Not Selected  Program limited by available funding.
50 Hwy 156 South Saint Paul  Medium mill and overlay from Armour Ave to Wentworth Ave $1,200,000 Not Selected  Program limited by available funding.
35 Hwy 156 South Saint Paul  Medium mill and overlay from Wentworth Ave to Dakota/Ramsey County line $900,000 Not Selected  Program limited by available funding.
55 Hwy 21 Jordan Thin mill and overlay from Mill st to US169  $2,300,000 Not Selected  Poor pavement conditions.
35 Hwy 244 Mahtomedi, White Bear Lake Reconstruction from Hwy 120 to Ash St $6,000,000 Not Selected  Turnback. Recent surface treatment concealing poor pavement conditions.
70 Hwy 284 Waconia, Cologne Thick mill and overlay from US212 to Hwy 5  $8,400,000 Not selected Many issues with this pavement including geometric and ADA needs in Cologne. RQI data not reflective of the poor pavement conditions.
75 Hwy 3 St Paul  Medium mill and overlay from Mendota Rd to Wyoming St $2,700,000 Not Selected  Program limited by available funding.
65 Hwy 3 Rosemount Medium mill and overlay from Dakota County Road 58 to 145th  $1,300,000 Not Selected  Program limited by available funding.
40 Hwy 3 St Paul Resurface and jurisdictional transfer Hwy 3 (Robert St) from Mississippi River Bridge to E 11th St in St Paul    $14,610,000   Not Selected Poor pavement conditions. Turnback to city. 
40 Hwy 3 St Paul Thin mill and overlay from Kellogg Blvd to I35E  $7,700,000 Not selected Poor pavement conditions. Turnback to city.
25 Hwy 3 St Paul  Rehab pavement, sidewalk replacement and ADA improvements on Hwy 3 (Robert St) from Annapolis St E to Mississippi River in St Paul   $13,529,000   2027   Poor pavement conditions. 
55 Hwy 5 Waconia Medium mill and overlay from Oak ave to Hwy 284  $1,500,000 Not Selected  Program limited by available funding.
55 Hwy 5 Waconia Medium mill and overlay from Hwy 284 to Elm St  $100,000 Not Selected  Program limited by available funding.
45 Hwy 5 Waconia Medium mill and overlay from Elm St to Birch St $300,000 Not Selected  Program limited by available funding.
50 Hwy 51 St Paul, Falcon Heights, Roseville Medium mill and overlay from Pierce Butler to Hwy 36 $3,000,000 Not Selected  Program limited by available funding.
45 Hwy 51 St Paul Thin mill and overlay from St Clair Ave to Grand Ave  $1,000,000 Not Selected  Poor pavement conditions. 
65 Hwy 65 Minneapolis Reconstruction, ADA and BR repair on Hwy 65 from 2nd ST to 37th Ave NE in Mpls and 37st Ave to 53rd Ave in Columbia Heights   $1   Not Selected NA
60 Hwy 65 Minneapolis Medium mill and overlay from 3rd Ave S to 27th Ave  $4,800,000 Not Selected  Poor pavement conditions.
35 Hwy 65 NA Repair road from University Ave SE. to NE 27th Ave   $3,300,000   Not Selected Poor pavement conditions.
60 Hwy 95 Taylors Falls Medium mill and overlay from County Road 16/Taylors Falls to US8 $300,000 Not Selected  Program limited by available funding.
65 US52 Minneapolis Medium mill and overlay from Hwy 65 to University Ave $3,200,000 Not selected Poor pavement conditions plus ADA and bike needs. 
75 US61 Forest Lake Medium mill and overlay from Hwy 95 to Forest Lake Cl  $7,400,000 Not Selected Poor pavement conditions.
70 US61 White Bear Lake Medium mill and overlay from White Bear Ave to Hwy 96 $1,700,000 Not Selected  Program limited by available funding.
55 US61 White Bear Lake Medium mill and overlay from 8th St to Hwy 96 $300,000 Not Selected  Program limited by available funding.
10 US61 NA Resurface road from Jct Hwy 316 to W 36th St in Hastings $9,924,926 2029 Projected poor pavement conditions. 
67 US61, Hwy 5 NA Improve pavement conditions, stormwater drainage, corridor safety, walkability, traffic signals, landscaping, trails, bus stops, lighting, and sidewalk curb ramps on Hwy 61 (Arcade) from East 7th St to 0.2 miles south Roselawn Ave in Maplewood and on Hwy 5 from east end bridge 62703 to Minnehaha Ave in St Paul    $33,300,000   2025   NA

Previous years

Score Route  Year Planned (FY) Description High Level Cost Estimate for Planning Purposes  Comments
96 I35 2029-2031 Reconstruct I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 and replace bridges $36,230,000 NA
95 I35 2028 Resurface I-35 under the 5th Ave W bridge and from Hwy 23 to 50th Ave W in Duluth $1,350,000 6982-344
92 Hwy 61 2025 On  London Rd (Hwy 61), in Duluth, from 26 Ave E. to just north of. 60th Ave. E., construct roundabout at 26th and 40th Ave. E and 60th Ave E.., resurface pavement and install trail. $20,000,000 6925-145; 118-166-004
92 US169 2030 Resurface Hwy 169 from 13th St SW to Hwy 2 in Grand Rapids $3,525,000 3115-131
92 US169 2033 Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine $11,252,000 3116-155
91 I535 Not Selected Resurface I-535 from railroad bridge to Jct I-35/Hwy 53  $730,000 Partially covered by Twin Ports Interchange project
88 I35 2025 Northbound and Southbound I-35 in Duluth Repair concrete pavement and interchange ramps from Lake Ave to 0.7 miles South of 21st Ave E. $3,165,000 6982-336; 6982-336BFP
88 Hwy 61 2027  Hwy 61 from 2.6 miles north County Rd  6 to 0.20 mi. North Leveaux Ridge Rd. Resurface Pavement $8,500,000 1601-66
88 US53 Not Selected Resurface Hwy 53 from just north of wayside rest to the Rice River bridge  $7,100,000 Cost is greater than available budget
87 US53 2024 Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 7 ramps at the Hwy 169/Hwy 53 intersections $5,500,000 6918-102
85 US169 2024 Resurface northbound Hwy 169 from just west of CR 67 to CR 103 and southbound Hwy 169 from just north of CR 5 to just south of CR 103 and rehabilitate 3 bridges & pedestrian accessibility improvements and sidewalk improvements along Emerald Avenue from US 169 to Enterprise Drive South in Mt Iron .  $62,500 6935-94; 069-596-017
84 US2 Not Selected Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW  $3,000,000 Waiting to avoid simultaneous or multiple years of detours in the same area
83 US169 Not Selected Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73  $6,740,000 Crack sealed in 2022; Cost is greater than available budget.
83 US53 2025 Resurface Hwy 53 in Eveleth from Hwy 37 to Vermillion Dr $3,000,000 6918-100
82 Hwy 33 Not Selected Resurface Hwy 33 from  just north of Carlton County Road 116 to 1.5 miles south of Hwy 2  $5,270,000 Chip sealed in 2022
82 Hwy 61 2029 Resurface NB Hwy 61 from CR 33 (McQuade Rd) to CR 42 (Homestead Rd) and SB Hwy 61 from CR 33 (McQuade Rd) to Knife River $8,500,000 6926-56
82 US169 2030 Resurface Hwy 169 from CR 64 (Harristown Rd) to 13th St SW in Grand Rapids $4,744,000 3115-129
82 US53 Not Selected Resurface Hwy 53 from St Louis County Road 682/691 to the St Louis River bridge  $4,580,000 Cost is greater than available budget
81 US169 Not Selected Resurface Hwy 169 from 8th Ave E to just south of St. Louis County 92  $1,110,000 District does not expect pavement segment(s) to deteriorate as fast as model predicts.
81 US53 2028 Resurface Hwy 53/Trinity Rd from just north of Piedmont Ave to Hwy 194/Central Entrance in Duluth $4,230,000 6915-139
80 Hwy 33 Not Selected Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge  $2,990,000 Chip sealed in 2022
78 Hwy 61 2030 Resurface Hwy 61 from just south of CR 14 to Reservation Bay Rd
$15,713,000 1603-54
78 Hwy 61 2029 Resurface Hwy 61 from just north of 60th Ave E to just north of N. Superior St.
$1,060,000 6925-147
77 I35 Not Selected Resurface I-35 from north of tunnel to Hwy 61/London Rd  $1,590,000 NA
77 I35 2033 Resurface I-35 from 2.6 miles south of CR 4 to the north end of the Hwy 210 bridge $18,648,000 0980-168
77 Hwy 61 2024 Two Harbors Expressway,Highway 61 North and South Bound In Duluth 0.12 miles North of Superior St to CR33/Mcquade. Resurface roadway $3,200,000 6925-144 
77 US2 2033 Resurface Hwy 2 from .25 miles east of Hwy 73 to just east of CR 845/Maki Rd $14,627,000 6907-54
77 US2 2024 State Highway 2 from State Highway 200 to 0.25 mi. west of county rd. 30. Pavement resurfacing $3,900,000 6906-19
76 US53 Not Selected Resurface Hwy 53 from just south of Cook to south limits of Cook  $170,000 NA
75 I535 Not Selected Resurface I-535 from Blatnik bridge to railroad bridge  $360,000 NA
75 Hwy 33 Not Selected Resurface Hwy 33 from I-35 to roundabout  $250,000 NA
75 US169 Not Selected Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW  $3,160,000 NA
75 US71 Not Selected Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W  $40,000 NA
74 Hwy 210 Not Selected Resurface Hwy 210 from railroad bridge to just east of I-35  $9,770,000 NA
73 US2 2031 Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd in Cohasset $2,974,159 3103-72
72 US169 Not Selected Resurface Hwy 169 from just north of Saint Louis County Road 5 to just south of Saint Louis County Road 5  $1,760,000 Crack sealed in 2022
70 Hwy 61 2027 Repair Highway 61 in locations between Two Harbors and just south of CR 5 in Silver Bay $2,150,000 3804-64
70 US53 Not Selected Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road  901  $26,530,000 NA
69 US169 Not Selected Resurface Hwy 169 from just north of Saint Louis County 7 to Hwy 53  $600,000 NA
69 US2 Not Selected Resurface Hwy 2 from 5th St SW to just east of Deer River  $200,000 NA
68 Hwy 11 Not Selected Resurface Hwy 11 from Hwy 71 to just east of Hwy 71  $100,000 NA
68 Hwy 61 2032 Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of UT 89
$2,582,000 1602-54
68 Hwy 61 Not Selected Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek  $1,940,000 NA
68 US169 2032-2033 Resurface Hwy 169 from just south of the Aitkin/Itasca County line to CR 64 (Harristown Rd) $14,218,230 3115-128
67 Hwy 61 2029 Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel and from just north of Crow Creek to just north of Gooseberry River $2,886,000 3805-111
67 Hwy 61 2032 Resurface Hwy 61 from 1.2 miles north of the Gooseberry River to 0.85 miles south of the Split Rock River and 1.3 miles north of CR 22 to Beaver Bay Bridge $3,957,000 3806-72
65 I35 2028 Repair I-35 concrete in locations between north of Hinckley to Hwy 53 $2,500,000 5880-203
65 US53 Not Selected Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB  $100,000 NA
62 US53 Not Selected Resurface Hwy 53 from south limits of Cook to Little Fork River bridge  $770,000 NA
61 Hwy 33 Not Selected Resurface Hwy 33 from railroad bridge to Hwy 53  $10,160,000 Chip sealed in 2022
60 US2 2028 Resurface Hwy 2 from just east of Hwy 200 to west limits of Floodwood $8,939,000  6906-19  
58 Hwy 61 Not Selected Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367  $1,780,000 NA
46 I35 2029 Resurface NB and SB I-35 from the north end of the Hwy 210 bridge to the north end of the St Louis River bridge
$6,219,000 0980-166
46 US2 Not Selected Resurface Hwy 2 from north end of grass median to I-35  $90,000 NA
41 Hwy 194 Not Selected Resurface Hwy 194 from just north of Mesaba Ave to Superior St  $1,240,000 NA
41 Hwy 33 Not Selected Repair Hwy 33 concrete pavement from roundabout to just north of Doddridge Ave  $690,000 NA
39 US53 2031 Resurface SB Hwy 53 from just north of Hwy 169 to Rice River bridge $6,332,000 6920-57
34 Hwy 61 2031 Reconstruct Hwy 61 from just southwest of CR 61 to just east of CR 26 in Two Harbors $8,935,000 3804-1112183, scored as urban project
30 US53 Not Selected Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of St. Louis County Road 52  $2,560,000 NA
27 Hwy 61 Not Selected Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1  $2,070,000 NA
25 US53 Not Selected Resurface Hwy 53 from 4th St to just north of Piedmont Ave  $580,000 NA

Score Route  Year Planned (FY) Description High Level Cost Estimate for Planning Purposes  Comments
96 I35 2029-2031 Reconstruct I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 $285,000,000 6982-1072803
95 I35 2028 Resurface I-35 under the 5th Ave W bridge and from Hwy 23 to 50th Ave W in Duluth $1,350,000 6982-344
92 Hwy 61 2025 On State Highway 61, in Duluth, from 26 Ave E. to just north of. 60th Ave. E., construct roundabout at 26th , 40th & 60th Ave. E., resurface pavement and install trail. $14,153,469 6925-145
92 US169 2030 Resurface Hwy 169 from 13th St SW to Hwy 2 $3,000,000 3115-1038336
92 US169 2032 Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine $10,361,000 3116-155
91 I535 Not Selected Resurface I-535 from railroad bridge to Jct I-35/Hwy 53  $730,000 Partially covered by Twin Ports Interchange project
88 I35 2025 Northbound and Southbound I-35 in Duluth Repair concrete pavement and interchange ramps from Lake Ave to 0.7 miles South of 21st Ave E. $1,900,000 6982-336
88 US53 2031 Resurface Hwy 53 NB from north of Swan Lake Rd to just south of Cemetery Rd $9,795,000 6917-140
88 US53 Not Selected Resurface Hwy 53 from just north of wayside rest to the Rice River bridge  $7,100,000 Cost is greater than available budget
87 US53 2024 Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 7 ramps at the Hwy 169/Hwy 53 intersections $7,475,000 6918-102
85 US169 2024 Resurface northbound Hwy 169 from just west of CR 67 to CR 109 and southbound Hwy 169 from just north of CR 5 to just south of CR 109 and rehabilitate 3 bridges . $17,900,000 6935-94
84 US2 Not Selected Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW  $3,000,000 Waiting to avoid simultaneous or multiple years of detours in the same area
83 US169 Not Selected Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73  $6,740,000 Crack sealed in 2022; Cost is greater than available budget.
83 US53 2024 Resurface Hwy 53 from Hwy 37 to Vermillion Dr $2,944,000 6918-100
82 Hwy 33 Not Selected Resurface Hwy 33 from  just north of Carlton County Road 116 to 1.5 miles south of Hwy 2  $5,270,000 Chip sealed in 2022
82 Hwy 61 2028 Resurface NB Hwy 61 from CR 33 (McQuade Rd) to CR 42 (Homestead Rd) and SB Hwy 61 from CR 33 (McQuade Rd) to Knife River $6,089,000 6926-56
82 US169 2028 Resurface Hwy 169 from CR 97/Crystal Springs Rd  to 13th St SW in Grand Rapids $4,000,000 3115-129
82 US53 Not Selected Resurface Hwy 53 from St Louis County Road 682/691 to the St Louis River bridge  $4,580,000 Cost is greater than available budget
81 Hwy 61 2031 Resurface Hwy 61 from 2.6 miles north CR 6 to 1.4 Miles south of CR 79 $10,015,000 1601-66
81 US169 Not Selected Resurface Hwy 169 from 8th Ave E to just south of St. Louis County 92  $1,110,000 District does not expect pavement segment(s) to deteriorate as fast as model predicts.
81 US53 2028 Resurface Hwy 53 from just north of Piedmont Ave to just south of Mall Dr $4,230,000 6915-139
80 Hwy 33 Not Selected Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge  $2,990,000 Chip sealed in 2022
80 US53 2029 Resurface NB Hwy 53 from 1.1 miles south of CR 52 to Bridge 69019 $2,058,000 6917-1038383
78 Hwy 61 2028 Resurface Hwy 61 from just south of CR 14 to Reservation Bay Rd  $14,573,000 1603-54
78 Hwy 61 2028 Resurface Hwy 61 from just north of 60th Ave E to just north of Superior St $1,060,000 6925-147
77 I35 Not Selected Resurface I-35 from north of tunnel to Hwy 61/London Rd  $1,590,000 NA
77 Hwy 61 2024 Highway 61 North and South Bound In Duluth 0.12 miles North of Superior St to County Rd 33/Mcquade. Resurface roadway $3,100,000 6925-144
77 US2 Not Selected Resurface Hwy 2 from just west of Floodwood to St Louis County Road 845  $9,050,000 NA
76 US53 Not Selected Resurface Hwy 53 from just south of Cook to south limits of Cook  $170,000 NA
75 I535 Not Selected Resurface I-535 from Blatnik bridge to railroad bridge  $360,000 NA
75 Hwy 33 Not Selected Resurface Hwy 33 from I-35 to roundabout  $250,000 NA
75 US169 Not Selected Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW  $3,160,000 NA
75 US71 Not Selected Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W  $40,000 NA
74 Hwy 210 Not Selected Resurface Hwy 210 from railroad bridge to just east of I-35  $9,770,000 NA
73 Hwy 23 2030 Resurface Hwy 23 from Hwy 107 to I-35 $5,292,000 5801-1039097
73 US2 2030 Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd $2,684,000 3103-1038975
73 US53 2032 Resurface NB Hwy 53 from CR 13 to 1.6 miles north of Hwy 33 $21,974,000 6916-116
72 US169 Not Selected Resurface Hwy 169 from just north of Saint Louis County Road 5 to just south of Saint Louis County Road 5  $1,760,000 Crack sealed in 2022
71 US2 Not Selected Resurface Hwy 2 from just east of Hwy 200 to just west of Floodwood  $6,670,000 NA
70 Hwy 61 2027 Repair Highway 61 in locations between Two Harbors and just south of CR 5 in Silver Bay $1,945,000 3804-64
70 US53 Not Selected Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road  901  $26,530,000 NA
69 US169 Not Selected Resurface Hwy 169 from just north of Saint Louis County 7 to Hwy 53  $600,000 NA
69 US2 Not Selected Resurface Hwy 2 from 5th St SW to just east of Deer River  $200,000 NA
68 Hwy 11 Not Selected Resurface Hwy 11 from Hwy 71 to just east of Hwy 71  $100,000 NA
68 Hwy 61 2032 Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of UT 89  $2,582,000 1602-54
68 Hwy 61 Not Selected Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek  $1,940,000 NA
68 US169 2027 Resurface Hwy 169 from just south of the Aitkin/Itasca County line to CR 437 $9,477,000 3115-128
67 Hwy 61 2029 Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel and from just north of Crow Creek to just north of Gooseberry River $2,886,000 3805-111
67 Hwy 61 2032 Resurface Hwy 61 from 1.2 miles north of the Gooseberry River to 0.85 miles south of the Split Rock River and 1.3 miles north of CR 22 to Beaver Bay Bridge $3,957,000 3806-72
65 I35 2028 Repair I-35 concrete in locations between north of Hinckley to Hwy 53 $2,500,000 5880-203
65 US53 Not Selected Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB  $100,000 NA
62 US53 Not Selected Resurface Hwy 53 from south limits of Cook to Little Fork River bridge  $770,000 NA
61 Hwy 33 Not Selected Resurface Hwy 33 from railroad bridge to Hwy 53  $10,160,000 Chip sealed in 2022
60 US2 2023 Highway 2 from Highway 65 to Highway 200 Resurface Highway and Junction of Highway 2 and Highway 65 in Swan River, Construct Roundabout, Turn Lanes. Safety Improvements     $6,600,000 3104-62 Selected prior to policy (in 2019-2022 STIP); 
58 Hwy 61 Not Selected Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367  $1,780,000 NA
58 US2 2023 Resurface US 2 from just west of CR 874 to Hwy 194 and construct a roundabout at US 2/Hwy 194 $3,744,750 6908-61
46 I35 2029 Resurface NB and SB I-35 from the north end of the Hwy 210 bridge to the north end of the St Louis River bridge $6,219,000 0980-1038133
46 US2 Not Selected Resurface Hwy 2 from north end of grass median to I-35  $90,000 NA
41 Hwy 194 Not Selected Resurface Hwy 194 from just north of Mesaba Ave to Superior St  $1,240,000 NA
41 Hwy 33 Not Selected Repair Hwy 33 concrete pavement from roundabout to just north of Doddridge Ave  $690,000 NA
39 US53 2031 Resurface SB Hwy 53 from just north of Hwy 169 to Rice River bridge $6,332,000 6920-57
30 US53 Not Selected Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of St. Louis County Road 52  $2,560,000 NA
27 Hwy 61 Not Selected Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1  $2,070,000 NA
25 US53 Not Selected Resurface Hwy 53 from 4th St to just north of Piedmont Ave  $580,000 NA

Score Route  Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
96 I35 Reconstruct I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23  $28,550,000 2029 6982-1072803; interim project in 2021 (6982-318)
95 I35 In Duluth Resurface I-35 under the 5th Ave W bridge & from Highway 23 to 50th  $1,350,000 2028 6982-344
92 Hwy 61 Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E.,  Pavement Resurface, Trail  $833,000 2025 Listed as one project in STIP; 6925-145
92 US169 Resurface Hwy 169 from 13th St SW to Hwy 2  $3,000,000 2030 3115-1038336
92 US169 Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine  $8,330,000 2028 3115-1037792
91 I535 Resurface I-535 from railroad bridge to Jct I-35/Hwy 53  $730,000 Not Selected Partially covered by Twin Ports Interchange project
88 US53 Resurface Hwy 53 from just north of wayside rest to the Rice River bridge  $7,100,000 Not Selected Cost is greater than available budget
88 I35 Repair concrete pavement & storm sewer repair on NB and SB I-35 in Duluth from 5th Ave to 0.7 Miles South 21st ave East  $2,600,000 2024 6982-336
87 US53 Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 7 ramps at the Hwy 169/Hwy 53 intersections  $7,480,000 2027 Project includes ramps; 6918-102/6919-19
85 US169 Resurface North Bound Hwy 169 from .4 miles West of County Road 67 to County Road 109 & South Bound Hwy 169 from just North of County Road 5 to just South of County Road 109  $16,900,000 2024 6935-94
84 US2 Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW  $3,000,000 Not Selected Waiting to avoid simultaneous or multiple years of detours in the same area
83 US169 Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73  $6,740,000 Not Selected Cost is greater than available budget
83 US53 Resurface Hwy 53 from Hwy 37 to Vermillion Dr  $2,950,000 2027 6918-100
82 US53 Resurface Hwy 53 from St Louis County Road 682/691 to the St Louis River bridge  $4,580,000 Not Selected Cost is greater than available budget
82 Hwy 33 Resurface Hwy 33 from  just north of Carlton County Road 116 to 1.5 miles south of Hwy 2  $5,270,000 Not Selected Preventive maintenance planned for 2022 to improve/extend life until later programming
82 Hwy 61 Resurface NB Hwy 61 from Saint Louis County Road 33 (McQuade Rd) to St. Louis County Road 42 (Homestead Rd) and SB Hwy 61 from St. Louis County Road 33 (McQuade Rd) to Knife River  $6,090,000 2028 6926-56
81 Hwy 61 Resurface Hwy 61 from 2.6 miles north of Lake County Rd 6 to 1.4 Miles south of Cook County Road 79  $1,020,000 2031 1601-66
81 US53 Resurface Hwy 53 from just north of Piedmont Ave to just south of Mall Dr  $4,230,000 2028 6915-1038826
81 US169 Resurface Hwy 169 from 8th Ave E to just south of St. Louis County 92  $1,110,000 Not Selected District does not expect pavement segment(s) to deteriorate as fast as model predicts.
81 Hwy 11 Resurface Hwy 11 from just west of Koochiching County Road 332 to 6th Ave W in International Falls  $5,120,000 2028 Scored as urban pavement; 3605-43 
80 US2 Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169  $3,770,000 2028 Scored as urban pavement; 3103-1037794
80 Hwy 33 Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge  $2,990,000 Not Selected Preventive maintenance planned for 2022 to improve/extend life until later programming
80 US53 Resurface NB Hwy 53 from 1.1 miles south of Saint Louis County Road 52 to Bridge 69019  $2,070,000 2029 6917-1038383
78 Hwy 61 Resurface Hwy 61 from 60th Ave E to Brighton Beach Rd; Resurface Hwy 61 from just north of Brighton Beach Rd to just north of Superior St  $1,060,000 2028 Listed as two projects in the CHIP; 6925-1037834 and 6925-1038655
78 Hwy 61 Resurface Hwy 61 from just south of Cook County Road 14 to Reservation Bay Rd  $14,850,000 2028 1603-54
77 Hwy 61 Resurface roadway from 0.3 miles North of Superior St to St. Louis County Road  33/Mcquade.
 $2,800,000 2024 6925-144
77 US2 Resurface Hwy 2 from just west of Floodwood to St Louis County Road 845  $9,050,000 Not Selected  
77 I35 Resurface I-35 from north of tunnel to Hwy 61/London Rd  $1,590,000 Not Selected  
76 US53 Resurface Hwy 53 from just south of Cook to south limits of Cook  $170,000 Not Selected  
75 US2 Resurface Hwy 2 from Hwy 194 to just east of Boundary Ave in Proctor  $10,800,000 2026 Scored as urban pavement; 6908-68
75 US169 Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW  $3,160,000 Not Selected  
75 I535 Resurface I-535 from Blatnik bridge to railroad bridge  $360,000 Not Selected  
75 Hwy 33 Resurface Hwy 33 from I-35 to roundabout  $250,000 Not Selected  
75 US71 Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W  $40,000 Not Selected  
74 Hwy 210 Resurface Hwy 210 from railroad bridge to just east of I-35  $9,770,000 Not Selected  
73 Hwy 61 Resurface Hwy 61 from 1.3 miles north of Lake County Road 22 to Mary St  $1,650,000 2030 3806-1038873
73 US2 Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd  $2,690,000 2030 Selected prior to policy (in 2019-2028 CHIP); 3103-1038975
73 US53 Resurface NB Hwy 53  from Saint Louis County Road  13 to 1.6 miles north of Hwy 33   $21,000,000 2031 6916-166
73 Hwy 33 Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet  $840,000 2029 Scored as urban pavement; 0906-1038528
73 Hwy 23 Resurface Hwy 23 from Hwy 107 to I-35  $4,900,000 2030 5801-1039097
72 Hwy 61 Realign and replace the Silver Creek Bridge and approaches in Lake County
 $6,860,000 2022 Bridge project; 3805-79 (tied to 3805-99)
72 US169 Resurface Hwy 169 from just north of Saint Louis County Road 5 to just south of Saint Louis County Road 5  $1,760,000 Not Selected  
71 US2 Resurface Hwy 2 from just east of Hwy 200 to just west of Floodwood  $6,670,000 Not Selected  
71 Hwy 194 Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth  $14,400,000 2026 Scored as urban pavement; 6933-99
70 Hwy 61 Repair Highway 61 in locations between Two Harbors and just south of Lake County Road 5 in Silver Bay  $1,950,000 2027 3804-1090403  
70 US53 Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road  901  $26,530,000 Not Selected  
69 US2 Resurface Hwy 2 from 5th St SW to just east of Deer River  $200,000 Not Selected  
69 US169 Resurface Hwy 169 from just north of Saint Louis County 7 to Hwy 53  $600,000 Not Selected  
68 Hwy 61 Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek  $1,940,000 Not Selected  
68 US2 Resurface EB and WB Hwy 2 in Grand Rapids to just east of La Prairie Ave

 $3,310,000 2024 Scored as urban pavement; 3104-61
68 Hwy 11 Resurface Hwy 11 from Hwy 71 to just east of Hwy 71  $100,000 Not Selected  
68 US169 Resurface Hwy 169 from just south of the Aitkin/Itasca County line to Itasca County Road 437  $9,480,000 2027 Selected prior to policy (in 2019-2028 CHIP); 3115-128
68 Hwy 61 Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of UT 89   $2,360,000 2030 District anticipates the pavement condition will deteriorate faster than the model is projecting 1602-1038215
67 Hwy 61 Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel and from just south of CR 1 to just north of Gooseberry River     $1,060,000 2028 Ongoing maintenance concerns; 3806-1037835
67 US2 Reconstruct Hwy 2 from just west of CR 73 to just west of CR 74 in Warba  $4,000,000 2027 Scored as urban pavement; 3104-63
67 Hwy 61 Repair concrete pavement on Hwy 61 from just south of Lake County Road 1 to just north of Gooseberry River; Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel  $2,130,000 2027 Selected prior to policy (in 2019-2028 CHIP); previously listed as two projects in CHIP 3805-111
66 Hwy 61 Resurface Hwy 61 from just south of Mary St to Beaver Bay bridge   $400,000 Not Selected  
65 I35 Repair I-35 concrete in locations between north of Hinckley to Hwy 53  $2,500,000 2028 Scores 95 if in 2030 or 2031, funding available in 2029; 5880-1090423  
65 US53 Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB  $100,000 Not Selected  
65 Hwy 194 Resurface Hwy 194 from Superior St to I-35  $220,000 2025 Part of CHIP bridge project 6933-101
63 US61 Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel  $770,000 2027 Selected prior to policy (in 2019-2028 CHIP); 3805-1038872; Previously score 63
62 US53 Resurface Hwy 53 from south limits of Cook to Little Fork River bridge  $770,000 Not Selected  
61 Hwy 33 Resurface Hwy 33 from railroad bridge to Hwy 53  $10,160,000 Not Selected  
60 US2 Highway 2 from Highway 65 to Highway 200 Resurface Highway and Junction of Highway 2 and Highway 65 in Swan River, Construct Roundabout, Turn Lanes. Safety Improvements     $6,600,000 2023 Selected prior to policy (in 2019-2022 STIP); 3104-62
60 US2 Hwy 2, 0.1 mile west of Saint Louis County Road 874  to Hwy 194, Resurface Hwy and construct roundabout at Hwy2/Hwy194  $6,500,000 2023 To coordinate with the timing of MnDOT safety project; 6908-61
58 Hwy 61 Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367  $1,780,000 Not Selected  
58 Hwy 33 Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet  $1,930,000 2029 Scored as urban pavement; 0905-56
50 Hwy 61 Hwy 61, NB and SB, in Duluth, from 26 Ave E. To 0.14 mi. N. 60th Avenue East, Const Roundabout at 26th & 40th Ave. E.,  Pavement Resurface, Trail  $70,000 Not Selected Included in 6925-145
46 US2 Resurface Hwy 2 from north end of grass median to I-35  $90,000 Not Selected  
46 I35 Resurface NB and SB I-35 from the north end of the Hwy 210 bridge to the north end of the St Louis River bridge  $6,220,000 2029 RQI forecast doesn’t reflect on the ground conditions or expectations; 0980-1038133
41 Hwy 194 Resurface Hwy 194 from just north of Mesaba Ave to Superior St  $1,240,000 Not Selected  
41 Hwy 33 Repair Hwy 33 concrete pavement from roundabout to just north of Doddridge Ave  $690,000 Not Selected  
39 US53 Resurface SB Hwy 53 from just north of Hwy 169 to Rice River bridge  $6,340,000 2031 6920-57; Scores higher with earlier project, so good candidate to move up if budget becomes available.  
35 Hwy 61 Reconstruct Hwy 61 from just north of the DM&IR railway bridge to just east of 5th St  $6,400,000 2025 Scored as urban pavement; 3804-62
30 US53 Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of St. Louis County Road 52  $2,560,000 Not Selected  
27 Hwy 61 Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1  $2,070,000 Not Selected  
25 US53 Resurface Hwy 53 from 4th St to just north of Piedmonth Ave  $580,000 Not Selected  

Score Route  Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
95 I35 Resurface I-35 from Hwy 23 to 50th Ave W $300,000 2026 NA
92 Hwy 61 Resurface northbound and southbound Hwy 61 from 28th Ave E to 60th Ave E in Duluth $3,100,000 2025 NA
92 I35 Resurface I-35 from Ramsey Street to Hwy 23 $400,000 2021 Partially covered by TPI project limits
92 US 169 Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine $8,300,000 2028 NA
92 US 169 Resurface Hwy 169 from 13th St SW to Hwy 2 $3,000,000 2030 NA
91 I535 Resurface I-535 from railroad bridge to Jct I-35/Hwy 53 $600,000 2021 Partially covered by Twin Ports Interchange; remainder under consideration
90 US 2 Resurface Hwy 2 from Hwy 194 to just east of Boundary Ave in Proctor $10,300,000 2026 Scored as urban pavement
88 I35 Repair concrete pavement on Northbound and Southbound I-35 in Duluth from Lake Ave to south of 21st Ave E $2,400,000 2024 NA
86 I35 Resurface I-35 under the 5th Ave bridge $700,000 2026 NA
86 US 53 Resurface Hwy 53 from just north of wayside rest to the Rice River bridge $14,000,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
85 Hwy 61 Resurface Highway from Knife River to .3 mi. South Lake  County Highway 61 $6,600,000 2022 Selected prior to policy (in 2019-2022 STIP)
84 US 169 Resurface North Bound Hwy 169 from .4 miles West of St Louis County Road 67 to St Louis County Road 109 & South Bound Hwy 169 from just North of St Louis County Road 5 to just South of St Louis County Road 109 $14,200,000 2024 NA
83 US 53 Resurface Hwy 53 from Hwy 37 to Vermillion Dr $3,000,000 2027 NA
82 Hwy 61 Resurface SB Hwy 61 from St Louis County Road 33 (McQuade Rd) to Knife River and NB Hwy 61 from St Louis County Road 33 (McQuade Rd) to St Louis County Road 42 (Homestead Rd) $6,300,000 2028 Listed as two projects in the CHIP
82 I35 Resurface I-35 from 2.6 miles north of Carlton County Road 4 to Hwy 210 $11,000,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
82 US 53 Resurface Hwy 53 from just south of bridge 69031 to just north of St Louis Count Road 52 in Cotton $8,100,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
81 Hwy 61 Resurface Hwy 61 from 2.6 miles north Lake County Road 6 to 1.4 Miles south of Cook County Road 79 $4,600,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
81 US 169 Resurface Hwy 169 from 8th Ave E to just south of St Louis County Road 92 $1,200,000 Not Selected District does not expect pavement segment(s) to deteriorate as fast as model predicts.
81 Hwy 194 Reconstruct NB and SB Hwy 194 from Hwy 53 (Trinity Rd) to 200 feet north of Mesaba Ave in Duluth $12,800,000 2026 Scored as urban pavement
80 US 53 Resurface NB Hwy 53 from 1.1 miles south of St Louis County Road 52 to Bridge 69019 $2,000,000 2029 NA
78 Hwy 11 Resurface Hwy 11 from just west of Koochiching 332 to 6th Ave W $4,000,000 2027 Scored as urban pavement
77 US 2 Resurface Hwy 2 from just west of Floodwood to St. Louis County 845 $4,600,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
77 Hwy 61 Resurface Hwy 61 from just south of Cook County Road 14 to Reservation Bay Rd $13,600,000 2025 NA
77 Hwy 61 Mill and overlay Hwy 61 Northbound & Southbound in Duluth 0.3 miles North of Superior St to St Louis County Road 33/McQuade.
$3,700,000 2024 NA
76 US 2 Resurface Hwy 2 from just east of Hwy 200 to just west of Floodwood $3,400,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
76 US 2 Resurface Hwy 2 in Grand Rapids to just east of La Prairie Ave

$1,900,000 2024 Scored as urban pavement
76 US 53 Resurface Hwy 53 from just north of Piedmont Ave to just south of Mall Dr $4,200,000 2028 NA
76 US 169 Resurface Hwy 169 from just north of St. Louis County Road 7 to Hwy 53 $300,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
75 US 2 Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW $3,100,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
75 Hwy 33 Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge $3,000,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
74 US 53 Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 3 ramps at the Hwy 169/Hwy 53 intersection $7,400,000 2027 Project includes ramps
73 US 2 Resurface Hwy 2 from just west of 19th Ave NW to Hwy 169 $3,600,000 2029 Scored as urban pavement
73 Hwy 61 Resurface Hwy 61 from 60th Ave E to just north of Superior St $1,100,000 2028 Listed as two projects in the CHIP
73 Hwy 33 Resurface Hwy 33 from just north of Doddridge Ave to Cloquet Ave in Cloquet $1,500,000 2027 Scored as urban pavement
73 Hwy 33 Resurface Hwy 33 from Cloquet Ave to bridge 09008 in Cloquet $700,000 2027 Scored as urban pavement
73 Hwy 210 Resurface Hwy 210 from railroad bridge to just east of I-35 $5,200,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
73 Hwy 23 Resurface Hwy 23 from Hwy 107 to I-35 $4,200,000 2028 NA
72 US 169 Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73 $6,800,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
71 US 169 Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW $3,000,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
70 Hwy 61 Resurface Hwy 61 from 1.3 miles north of Lake County Road 22 to Mary St $1,700,000 2030 NA
70 US 53 Resurface Hwy 53 from Saint Louis County 682/691 to the St Louis River bridge $3,200,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
69 US 2 Resurface highway from .4 mi. E. Prairie River to 1.97 Mi. East of State Highway 65 $12,500,000 2021 Selected prior to policy (in 2019-2022 STIP)
69 US 2 Resurface Hwy 2 from 1st St SW to just east of Deer River $200,000 Not Selected NA
69 US 169 Resurface Hwy 169 from just north of Hwy 73 NB ramp to just south of Saint Louis County Road 67 $300,000 Not Selected NA
68 Hwy 61 Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek $1,000,000 Not Selected NA
68 Hwy 61 Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of Unincorporated Township Road 89  $2,300,000 2030 District anticipates the pavement condition will deteriorate faster than the model is projecting
68 US 169 Resurface Hwy 169 from just south of the Aitkin/Itasca County line to Itasca County Road  437 $9,400,000 2027 Selected prior to policy (in 2019-2028 CHIP)
68 Hwy 11 Resurface Hwy 11 from Hwy 71 to just east of Hwy 71 $100,000 Not Selected NA
67 US 2 Reconstruct Hwy 2 from 3rd Ave to the Swan River bridge in Warba $4,000,000 2027 Scored as urban pavement
67 Hwy 61 Repair concrete pavement on Hwy 61 from just south of Lake County Road 1 to just north of Gooseberry River $2,200,000 2028 Selected prior to policy (in 2019-2028 CHIP)
67 Hwy 61 Resurface Hwy 61 from just north of Split Rock entrance to 1.3 miles north of Lake County Road 22 $300,000 Not Selected NA
67 Hwy 210 Resurface and reconstruct the Highway 210/73 and drainage improvements in Cromwell in Carlton County
$2,100,000 2021 Selected prior to policy (in 2019-2022 STIP)
66 Hwy 61 Resurface Hwy 61 from just south of Mary St to Beaver Bay bridge  $200,000 Not Selected NA
66 US 53 Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB $200,000 Not Selected NA
66 US 53 Resurface NB Hwy 53  from Saint Louis County Road 13 to 1.6 miles north of Hwy 33 and SB Hwy 53 from Saint Louis County Road 13 to Saint Louis County Road 8 $32,800,000 2030 RQI forecast doesn’t reflect on the ground conditions or expectations; listed as two projects in the CHIP
66 US 53 Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road 901 $6,900,000 Not Selected NA
66 US 169 Resurface Hwy 169 from just north of Saint Louis County road 5 to just south of Saint Louis County Road 5 $2,000,000 Not Selected NA
66 Hwy 194 Resurface Hwy 194 from Superior St to I-35 $400,000 2026 Part of CHIP bridge project 6933-101
66 Hwy 33 Resurface Hwy 33 from  just north of Carlton County  116 to 1.5 miles south of Hwy 2 $3,900,000 Not Selected NA
65 US 2 Highway 2 from Highway 65 to Highway 200 Resurface Highway and Junction of Highway 2 and Highway 65 in Swan River, Construct Roundabout, Turn Lanes. Safety Improvements    $8,600,000 2023 Selected prior to policy (in 2019-2022 STIP)
65 Hwy 61 Reconstruct Hwy 61 from just north of the DM&IR railway bridge to just east of 5th St $6,600,000 2025 Scored as urban pavement
65 US 53 Resurface Hwy 53 from just north of Saint Louis County Road 901 to just north of Kinmount Creek bridge $6,400,000 Not Selected NA
65 US 71 Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W $100,000 Not Selected NA
64 US 2 Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd $3,000,000 2030 Selected prior to policy (in 2019-2028 CHIP)
63 Hwy 61 Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel $700,000 2027 Selected prior to policy (in 2019-2028 CHIP)
62 Hwy 61 Resurface highway from Reservation Bay Rd. to US/Canadian border
$17,700,000 2021 Selected prior to policy (in 2019-2022 STIP)
62 Hwy 61 Realign and replace the Silver Creek Bridge and approaches in Lake County
$100,000 2021 Bridge project
61 Hwy 33 Resurface Hwy 33 from railroad bridge to Hwy 53 $10,200,000 Not Selected NA
61 US  71/Hwy   11 Resurface the highway from 1000' south of Koochiching COunty Road 7 (Memorial Dr.) to the junction of 4th Street and from the east junction of Hwy 11 to 300' north of 2nd St. and on Highway 11 from the east junction of Highway 71 to the east junction of Highway 53 in International Falls. $12,500,000 2021 Selected prior to policy (in 2019-2022 STIP)
59 Hwy 61 Resurface Hwy 61 from 1.2 miles north of the Gooseberry River to 0.85 miles south of the Split Rock River  $1,000,000 2028 Ongoing maintenance concerns
58 US 2 Resurface Hwy & and construct roundabout at Hwy2/Hwy194
$4,000,000 2023 To coordinate with the timing of MnDOT safety project and a culvert project
58 Hwy 61 Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367 $900,000 Not Selected NA
56 US 53 Resurface SB Hwy 53 from Saint Louis County Road 13 to Saint Louis County Road 8 $14,500,000 2029 RQI forecast doesn’t reflect on the ground conditions or expectations
53 Hwy 61 Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1 $1,400,000 Not Selected NA
53 US 53 Resurface Hwy 53 from south limits of Cook to Little Fork River bridge $400,000 Not Selected NA
50 I535 Resurface I-535 from Blatnik bridge to railroad bridge $400,000 Not Selected NA
49 I-35/Hwy 33 Resurface I-35 from Hwy 210 bridge to St Louis River Bridge and Highway 33 from I-35 to I-35 NB $6,600,000 Not Selected NA
46 US 2 Resurface Hwy 2 from north end of grass median to I-35 $100,000 Not Selected NA
45 I35 Resurface I-35 from south of CR 138 to south of Carlton County Road 4 $10,800,000 Not Selected NA
42 US 2 Resurface Hwy 2 from Saint Louis County Road 845 to just west of Saint Louis County Road 874 $3,000,000 Not Selected NA
41 Hwy 194 Resurface Hwy 194 from just north of Mesaba Ave to Superior St $1,100,000 Not Selected NA
38 I35 I -35 In Proctor and Duluth. Pavement overlay from Boundary Ave to Central Ave
$3,300,000 2022 To coordinate with the timing of another MnDOT project, reconstruction scheduled for 2028 (scores 96).
25 US 53 Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of Saint Louis County Road 52 $2,600,000 Not Selected NA
23 Hwy 61 Resurface Hwy 61 from 26th Ave E to 28th Ave E in Duluth $100,000 Not Selected NA
22 I35 Resurface I-35 from bridge over railroad to 1 mile north of bridge $200,000 Not Selected NA
21 US 169 Resurface Hwy 169 from just west of Hwy 65 to just northeast of old Hwy 169 $200,000 Not Selected NA
21 Hwy 210 Resurface Hwy 210 from 1.5 miles east of Hwy 65 to Hwy 73 in Cromwell $200,000 Not Selected NA
19 US 53 Resurface Hwy 53 from 4th St to just north of Piedmont Ave $700,000 Not Selected NA
17 US 169 Resurface Hwy 169 from just south of Pokegama Lake bridge to Pokegama Lake bridge $200,000 Not Selected NA
16 Hwy 61 Resurface Hwy 61 from just northeast of Cook County Road 24 to just south of Cook County Road 7 $200,000 Not Selected NA
11 Hwy 33 Resurface Hwy 33 from bridge 09008 over St Louis River to just north of Carlton County Road 116 $200,000 Not Selected NA
7 Hwy 61 Resurface Hwy 61 from just north of Silver Creek tunnel to 1 mile north of Crow Creek bridge $200,000 Not Selected NA
7 Hwy 61 Resurface Hwy 61 from just south of Cook County Road 7 to 1.3 miles south of Cutface Creek $200,000 Not Selected NA
7 Hwy 61 Resurface Hwy 61 from just north of Silver Creek tunnel to Township Road 89 $200,000 Not Selected NA
7 Hwy 210 Resurface Hwy 210 from Hwy 65 to 1.5 miles east of Hwy 65 $200,000 Not Selected NA
6 US 169 Resurface Hwy 169 from Hwy 200 to just south of Aitkin/Itasca County line $200,000 Not Selected NA
6 US 71 Resurface Hwy 71 from Hwy 6 to bridge in Big Falls $200,000 Not Selected NA

Score Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
98 I-35 Mill and overlay from bridge over DM&IR Railroad to south end of bridge over Highway 23 $16,000,000 2022 NA
95 I-35 Medium mill and overlay from Highway 23 to 50th Ave W Bridge $300,000 2027 Part of 2027 bridge project
92 US169 Medium mill and overlay from Pokegama Lake bridge to Elizabeth Ave $17,000,000 2028  
91 US2 Medium mill and overlay from Itasca County Highway 62 to Highway 169 $15,000,000 2027 Also listed as Urban Pavement project
91 I-35 Unbonded overlay from south of Pine-Carlton County line to 2.6 miles south of County Road 4 $23,000,000 Not Selected Project is being developed to be ready if additional funding becomes available
89 Hwy 61 Medium mill and overlay from 28th Ave E to 40th Ave E $5,400,000 2026 Also listed as an Urban Pavement project 
88 I-35 Major concrete pavement rehabilitation/diamond grinding from under Lake Ave to Highway 61 $6,900,000 2024  
87 US2 Major concrete pavement rehabilitation/diamond grinding from Reference point 260 to I35 $800,000 Not Selected Waiting to avoid multiple detours in same area. 
86 I-35 Medium mill and overlay from under 5th Ave bridge to under Lake Ave bridge $900,000 2027  
84 Hwy 194 Medium mill and overlay from Highway 53 to Mesaba Ave $19,000,000 2027 Also listed as Urban Pavement project
83 US53 Medium mill and overlay from Highway 37 to Bourgin Dr $3,200,000 2029  
82 Hwy 61 Medium mill and overlay from Knife River to Duluth Missabe Illinois Railroad Bridge $7,600,000 2022  
82 Hwy 61 Medium mill and overlay from McQuade Road to Knife River $5,900,000 2024 Northbound and southbound limits differ
82 US169 Meduim mill and overlay from St. Louis County Road 67 to St Louis County Road 109 $16,000,000 2024  
82 I-35 Full mill and replace from Bridge number 9790 over BNSF railroad to one mile north of bridge number 9790 $900,000 Not Selected Waiting to coordinate with another project
81 Hwy 73 Medium mill and overlay from Moose Horn River to Highway 27 $300,000 Not Selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
81 US2 Medium mill and overlay from 0.4 miles east of bridge over Prairie River to Highway 200 $22,000,000 2021  
81 Hwy 61 Medium mill and overlay from 40th Ave E to 60th Ave E $6,700,000 2027 Also listed as Urban Pavement project
81 US53 Medium mill and overlay from wayside rest to Rice River bridge $13,000,000 Not Selected Schedule preventive maintenance 
81 US53 Medium mill and overlay from Little Fork River Bridge to St. Louis County Road 901 $9,400,000 Not Selected Not a district priority, continue to monitor pavement performance
81 I-35 Medium mill and overlay from south of Carlton County Highway 4 to Bridge over Highway 210 $11,000,000 2028  
80 Hwy 61 Medium mill and overlay from 2.6 miles north of Cook County Highway 6 to 0.9 miles south of Onion River $10,000,000 2023  
80 US53 Medium mill and overlay from St. Louis County Highway 52 to Paleface River $2,900,000 2028  
80 US169 Medium mill and overlay from Highway 65 to old Highway 169 $6,800,000 Not Selected Schedule preventive maintenance 
79 Hwy 194 Reconstruction from Anderson Rd to Arlington Ave $9,500,000 2027 Also listed as Urban Pavement project
78 Hwy 210 Medium mill and overlay from west of Highway 65 to Highway 73 $17,000,000 2029  
78 US53 Medium mill and overlay from Paleface River to St. Louis County Highway 16 $6,700,000 Not Selected Project is being developed to be ready if additional funding becomes available
77 Hwy 61 Reclaim and overlay from Cook County Highway 14 to Reservation River Road $16,000,000 2024  
77 US53 Resurface on Highway 53 in multiple locations $12,000,000 2020  
76 US53 Medium mill and overlay from Piedmont Ave to Highway 194 $2,600,000 2027  
76 US53 Reclaim and overlay from Saint Louis County Rd 109 to Kinmount Creek bridge $25,000,000 Not Selected Project is being developed to be ready if additional funding becomes available
75 Hwy 61 Medium mill and overlay from Superior St to McQuade Rd $5,600,000 2023  
74 Hwy 11 Reconstruction from Highway 332 to 6th Ave W $8,600,000 2027 Also listed as Urbam Pavement project
74 US2 Medium mill and overlay from US169 to 0.4 miles East of Railroad bridge $2,500,000 2024 Also listed as Urban Pavement project
74 Hwy 33 Medium mill and overlay from I-35 to Doddridge Ave $2,200,000 Not Selected Not a district priority, continue to monitor pavement performance
74 US53 Major concrete pavement rehabilitation/Edge Drain from 2nd Ave NW to Wayside Rest $11,000,000 2027  
73 US2 Reclaim and overlay from Highway 194 to E Boundary Ave $13,000,000 2025 Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project
73 Hwy 23 Medium mill and overlay from Highway 107 (district boundary) to I-35 $6,700,000 2028 Selected prior to policy (in 2019-2028 CHIP)
73 Hwy 23 Medium mill and overlay from Hulett Ave to I-35 $3,000,000 Not Selected NA
73 Hwy 210 Unbonded overlay from Aitkin County Road 81 to Highway 169 $12,000,000 Not Selected NA
73 US169 Medium mill and overlay from Pokegama Lake Bridge to 0.2 miles south of the bridge $400,000 Not Selected NA
71 US2 Thick overlay from 1st St to Deer River $500,000 Not Selected NA
71 Hwy 61 Medium mill and overlay from Railroad bridge to 5th Street crossings $8,700,000 2025 Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project
71 Hwy 61 Medium mill and overlay from 60th Ave to North Superior St $910,000 2028 Selected prior to policy (in 2019-2028 CHIP)
71 Hwy 33 Medium mill and overlay from Highway 2 to north end of the railroad bridge $4,800,000 2027 Selected prior to policy (in 2019-2028 CHIP)
71 Hwy 210 Major concrete pavement repair from Crow Wing/Aitkin County line to Highway 169 $2,200,000 2022 Selected prior to policy (in 2019-2022 STIP)
71 US53 Medium mill and overlay from Highway 33 to bridge 69031 $3,800,000 2027 Selected prior to policy (in 2019-2028 CHIP)
71 US169 Medium mill and overlay from Highway 200 in Hill City $12,000,000 Not selected NA
70 Hwy 61 Medium mill and overlay from Lake County Highway 22 to Mary St $1,800,000 2028 Selected prior to policy (in 2019-2028 CHIP)
70 Hwy 61 Reconstruction from Reference point 30 to Silver Creek Tunnel $3,700,000 2021 Selected prior to policy (in 2019-2022 STIP)
70 Hwy 210 Medium mill and overlay from east of Highway 73 to 0.4 miles east of I-35 $15,000,000 2029 Selected prior to policy (in 2019-2028 CHIP)
69 Hwy 210 Medium mill and overlay from Highway 169 to Ripple River Bridge $1,400,000 2028 Selected prior to policy (in 2019-2028 CHIP), also listed as an Urban Pavement project
69 US169 Unbonded overlay from Highway 210 to Mississippi River Bridge $5,200,000 Not selected NA
68 US169 Medium mill and overlay from Aitkin County line to Aitkin County Road 76 $7,500,000 Not selected NA
67 US71 Thick mill and overlay from the junction of Highways 11 and 71 to Highway 53 $100,000 Not selected NA
67 Hwy 210 Unbonded overlay from Ripple River to Aitkin County Road $1,400,000 Not selected NA
67 US169 Medium mill and overlay from Aitkin County Road 76 to Highway 210 $2,200,000 2027 Selected prior to policy (in 2019-2028 CHIP)
66 Hwy 61 Medium mill and overlay from Cook County Highway 7 to Cutface Creek $1,000,000 Not selected NA
66 US169 Major Concrete pavement repair from County Road 5 to County Road 75 $1,100,000 Not selected NA
65 Hwy 61 Major concrete pavement rehabilitation/diamond grinding from Lake County Highway 1 to Gooseberry River $500,000 2024 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 61 Medium mill and overlay from Mary St to Beaver Bay $400,000 Not selected NA
65 Hwy 210 Medium mill and overlay from East of Carlton County Road 53 to the end of Railroad bridge $600,000 Not selected NA
65 US169 Reclaim and overlay from Itasca County Highway 67 to County Road 437 $4,400,000 2026 Selected prior to policy (in 2019-2028 CHIP)
65 US169 Reclaim and overlay from Aitkin/Itasca County line to Aitkin County Highway 67 $4,200,000 Not selected NA
64 US2 Medium mill and overlay from Pinchberry Road to Itasca County Highway 62 $4,200,000 2028 Selected prior to policy (in 2019-2028 CHIP)
64 Hwy 61 Medium mill and overlay from Split Rock Entrance to Lake County Highway 22 $500,000 Not Selected NA
64 Hwy 210 Full mill and replace from Highway 65 to 1.5 miles west of  Highway 65 $1,300,000 Not Selected NA
63 US71 Reconstruction from Itasca/Koochiching County line to Highway 1 $17,000,000 Not Selected NA
63 Hwy 61 Major concrete pavement rehabilitation/diamond grinding within Silver Creek tunnel $1,000,000 2027 Selected prior to policy (in 2019-2028 CHIP)
62 Hwy 61 Reclaim and overlay from Reservation Bay Road to US/Canadian Border $15,000,000 2020 Selected prior to policy (in 2019-2022 STIP)
61 US2 Thick overlay from Highway 46 to Highway 6 $900,000 Not Selected NA
61 Hwy 33 Medium mill and overlay from Cloquet Ave to St. Louis Bridge $700,000 2025 Also listed as Urban Pavement project
61 Hwy 6 Medium mill and overlay from Big Fork River Bridge to Highway 1 $4,800,000 2028 Ongoing maintenance concerns
59 Hwy 73 Medium mill and overlay from 3rd Ave to Carlton County Road 129 $4,000,000 Not Selected NA
59 US2 Reclaim and overlay from Floodwood to St. Louis County Road 845 $9,100,000 Not selected NA
59 Hwy 61 Medium mill and overlay from Gooseberry River to Split Rock River $1,100,000 2028 Ongoing maintenance concerns
59 Hwy 33 Medium mill and overlay from St Louis River to Carlton County Rd 116 $1,800,000 Not selected NA
59 US2 Reclaim and overlay from Highway 200 to Floodwood $11,000,000 2028 District anticipates the pavement condition will  deteriorate faster than the model is projecting
58 I-535 Major Concrete rehabilitation from Blatnik Bridge to NW end of Railroad Bridge $400,000 2020 Part of Twin Ports Interchange project
57 US53 Medium mill and overlay from Cook to Little Fork River $700,000 Not Selected NA
56 US2 Medium mill and overlay from St. Louis County Road 874 to Highway 194 $4,000,000 2023 Selected prior to policy (in 2019-2028 CHIP)
56 Hwy 33 Reclaim and overlay from Doddridge Ave to Cloquet Ave $1,500,000 2025 Also listed as an Urban Pavement project 
54 US2 Medium mill and overlay from Bridge 5760 to Itasca County Highway 18 $2,300,000 2022 Ongoing maintenance concerns
52 Hwy 61 Reclaim and overlay from 1.3 miles South of Cutface Creek to 1.8 miles north of Cutface Creek $3,200,000 2028 District anticipates the pavement condition will deteriorate faster than the model is projecting
49 Hwy 210 Urban Reconstruction from Highway 73 to Cromwell $2,000,000 2020 Selected prior to policy (in 2019-2022 STIP)
47 I-35 Reclaim and overlay from Highway 210 to St. Louis River Bridge $7,600,000 2025 Selected prior to policy (in 2019-2028 CHIP)
44 US53 Reclaim and overlay northbound lanes from 1.3 miles north of Swan Lake Road to .1 miles south of Cemetery Road and bridge repair work. $10,000,000 2023 Selected prior to policy (in 2019-2028 CHIP)
44 US53 Diamond Grinding from Highway 169 to Highway 33 $1,600,000 Not Selected NA
39 Hwy 33 Medium mill and overlay from St. Louis County Rd 116 to Highway 2 $5,300,000 Not Selected NA
38 Hwy 33 Medium mill and overlay from Railroad bridge to Highway 53 $11,000,000 2028 Inadequate funding for reclaim/reconstruction which scores higher
35 Hwy 73 Medium mill and overlay from Highway 169 to 4th St $600,000 2025 Also listed as Urban Pavement project
34 US169 Diamond Grinding from St. Louis County Road 109 to Highway 53 $300,000 Not Selected NA
33 Hwy 73 Medium mill and overlay from Highway 73 to 13th St $100,000 2026 Also listed as Urban Pavement project
32 US169 Full mill and replace from Highway 47 to Highway 210 $400,000 Not Selected NA
30 US169 Reclaim and overlay from St. Louis County Road 5 to Highway 73 $1,400,000 Not Selected NA
29 Hwy 73 Major concrete pavement rehabilitation from 4th St to Highway 73 $800,000 2026 Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project
28 Hwy 61 Minor concrete rehabilitation from 26th Ave to 28th Ave $100,000 Not Selected NA
19 US53 Diamond Grinding from 4th St to Piedmont Ave $300,000 2020 Part of Twin Ports Interchange project
17 US53 Minor concrete rehabilitation from I-35 to 4th St $200,000 2020 Part of Twin Ports Interchange project