Minnesota Department of Transportation

511 Travel Info

Project selection

Increasing the transparency of how we select highway construction projects

Non-National Highway System pavement projects

MnDOT District 7

Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in Hwy SHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.

Last updated November 2024

Score Route Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
90 US Hwy 75 Resurface from Luverne to Trosky; replace 3 bridges   $10,300,000   2028, Future   6705-47   
87 Hwy 15 Resurface from Iowa to Fairmont   $5,200,000   Not Selected 4603-52; Not a district priority, will continue to monitor pavement performance    
85 Hwy 19 Resurface from Gaylord to Henderson   $20,200,000   2030 7206-117    
85 Hwy 19 Resurface from Hwy 169 to east Jct of Hwy 13   $17,900,000   2032 4004-126    
85 Hwy 22 Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20  $5,300,000 Not Selected Will be completed with remainder of the Hwy 22 to US 169 in St. Peter
85 Hwy 22 Reconstruction from Hungry Hollow Rd to Maple Hill Rd  $1,500,000 Not Selected Not a district priority, will continue to monitor pavement performance
84 Hwy 13 Resurface from Waterville to Montgomery    $15,100,000   2031 4001-48    
83 Hwy 86 Resurface Hwy 86 from I-90 to Hwy 60 (Except Lakefield); replace or improve drainage; replace signs   $4,600,000   Not Selected 3208-1101745; Not a district priority, will continue to monitor pavement performance
83 Hwy 68 Reclaim and overlay from Hwy 15 south of New Ulm to US Hwy 169  $14,800,000 2031 0710-123
82 Hwy 19 Medium mill and overlay from Red Wing Ave to Leroy Ave  $800,000 Not Selected Not a district priority, will continue to monitor pavement performance
81 Hwy 4 Resurface Hwy 4 from Martin Hwy 26 near Sherburn to Hwy 60 near St. James; replace 1 bridge and repair 3 bridges   $21,954,637   2025, Prior   4602-27   
80 Hwy 13 Resurface from Montgomery to New Prague   $6,520,000   2034 4002-1071423    
80 Hwy 22 Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15  $5,500,000 Not Selected NA 
80 Hwy 22 Medium mill and overlay from County Road 90 to Hungry Hollow Rd  $300,000 Not Selected NA 
79 Hwy 22 Resurface from Iowa border to west Jct of CR 16   $8,400,000   2033 2203-115    
79 Hwy 22 Resurface from west Jct of CR 16 to Wells    $6,500,000   2029 2204-27    
79 Hwy 30 Resurface Hwy 30 from US 71 to Darfur; replace or improve drainage, signing and lighting   $6,100,000   Not Selected 1702-1101744    
79 Hwy 5 Cold in place recycling and medium overlay from Hwy 22 to east of 4th St in Arlington  $3,700,000 Not Selected NA 
78 Hwy 5 Cold in place recycling and medium overlay from 5th St to US 212  $3,100,000 Not Selected NA 
78 Hwy 91 Resurface Hwy 91 from Iowa to Adrian   $8,000,000   Not Selected 5307-1112064    
77 Hwy 99 Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center  $6,300,000 Not Selected NA 
76 Hwy 19 Resurface Hwy 19 from Fairfax to Gibbon   $6,500,000   Not Selected 7204-1112109    
76 Hwy 93 Medium mill and overlay from Minnesota River Bridge to US Hwy 169  $400,000 Not Selected NA 
76 US Hwy 75 Resurface from Iowa border to Luverne   $9,900,000   2033 6704-116    
75 Hwy 22 Medium mill and overlay from Maple Hill Road to Hwy 86  $400,000 Not Selected NA 
74 Hwy 13 Medium mill and overlay from 2.2 miles north of Hwy 30 to 1.5 miles north of Waseca  $4,100,000 Not Selected NA 
74 Hwy 22 Resurface Hwy 22 from Gaylord to Hwy 212; replace bridge 72003 and rehab bridge 72004; replace or improve drainage, signing and lighting   $4,800,000   Not Selected 7208-1101723    
73 Hwy 19 Medium mill and overlay from 11th Ave SW to New Prague western City Limits  $200,000 Not Selected NA 
72 Hwy 19 Resurface Henderson to Hwy 169   $2,000,000   2031 7206-1121943    
72 Hwy 257 Resurface from Hanska to Hwy 15   $2,000,000   Not Selected 0808-1038067    
72 Hwy 83 Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41  $7,200,000 Not Selected NA 
71 Hwy 109 Hwy 109 from east side of Winnebago to western Wells limits  $7,300,000 Not Selected NA 
71 Hwy 19 Resurface from Winthrop to Gaylord   $8,800,000   2029 7205-118    
71 Hwy 22 Reconstruct from Hwy 83 to Bassett Dr   $16,500,000   2032 0704-1069603    
71 Hwy 22 Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90  $3,400,000 Not Selected NA 
71 Hwy 264 Resurface from Round Lake to I-90   $2,600,000   2029 5310-13    
71 Hwy 68 Medium mill and overlay from County Road 4 in Morgan to Hwy 4 in Sleepy Eye  $4,000,000 Not Selected NA 
70 Hwy 13 Medium mill and overlay from Hwy 30 to 2.2 miles north of Hwy 30  $1,200,000 Not Selected NA 
70 Hwy 22 Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90  $300,000 Not Selected NA 
70 Hwy 22 Medium mill and overlay from .33 south of Hwy 83 to 200ft north of Hwy 83  $400,000 Not Selected NA 
70 Hwy 83 Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41  $300,000 Not Selected NA 
68 Hwy 30 Medium mill and overlay from 1 mile east of US Hwy 169 to Troendle St NW  $5,200,000 Not Selected NA 
68 Hwy 4 Medium mill and overlay from Iowa/Minnesota Border to County Road 26 (where Hwy 4 turns right)  $5,200,000 Not Selected NA 
68 Hwy 4 Medium mill  and overlay from Hwy 68 to Hwy 19 in Fairfax  $4,300,000 Not Selected NA 
68 Hwy 83 Medium mill and overlay from Hwy 30 to Blue Earth County Road 173  $6,900,000 Not Selected NA 
67 Hwy 19 Medium mill and overlay from Alton Ave to Red Wing Ave  $200,000 Not Selected NA 
65 Hwy 22 Medium mill and overlay from 1500 south of the west junction US Hwy 212 to US Hwy 212  $200,000 Not Selected NA 
64 Hwy 99 Medium mill and overlay from Hwy 13 to Hwy 21  $4,100,000 Not Selected NA 
61 Hwy 109 Medium mill and overlay from Hwy 22 to I-90  $5,200,000 Not Selected NA 
61 US59 Medium mill and overlay from the Iowa/Minnesota Border to Hwy 60  $2,200,000 Not Selected NA 
60 Hwy 5 Medium mill and overlay from Sibley County Road 15 to 5th St  $300,000 Not Selected NA 
60 Hwy 83 Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane  $300,000 Not Selected NA 
54 Hwy 4 Reclaim and overlay from 3rd Ave SW in Sleepy Eye to Hwy 68  $2,000,000 Not Selected NA 
53 Hwy 19 Minor CPR and diamond grinding from Hwy 4 to Hwy 15  $5,000,000 Not Selected NA 
46 Hwy 13 Resurface from Waseca to Waterville    $5,700,000   2033 8102-30    
43 Hwy 13 Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca  $500,000 Not Selected NA 
43 Hwy 62 Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom  $12,300,000 Not Selected NA 
41 Hwy 111 Thin mill and overlay from US 14 to Seventh Street in Nicollet  $200,000 Not Selected NA 
41 Hwy 30 Resurface from Hwy 15 to Hwy 169    $6,000,000   2033 0705-26    
41 Hwy 5 Medium mill and overlay from 4th Ave E to Blue Earth County Road 15  $2,900,000 Not Selected NA 
40 Hwy 13 Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103  $500,000 Not Selected NA 
40 Hwy 83 Thin mill and overlay from Ichabod Lane to Hwy 22/Victory Dr  $100,000 Not Selected NA 
27 Hwy 22 Resurface Hwy 22 from St Peter to Hwy 111; pedestrian improvements   $5,800,000   2027   5205-113   
23 Hwy 91 Medium mill and overlay from I-90 to Murray County line  $3,900,000 Not Selected NA 
20 Hwy 30 Cold in place recycling from Hwy 83 to western New Richland city limits  $4,900,000 Not Selected NA 
19 Hwy 22 Reclaim and overlay from Hwy 111 to Sibley County Road 67  $7,400,000 Not Selected NA 
18 Hwy 13 Minor CPR and diamond grinding from .2 miles south of Hwy 60 to .26 miles north of Hwy 60  $200,000 Not Selected NA 
18 Hwy 19 Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW  $200,000 Not Selected NA 
16 Hwy 4 Minot CPR and diamond grinding from Hwy 60 to Wantonwan County Road 12  $200,000 Not Selected NA 

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
90 Hwy 13 Resurface from Montgomery to New Prague   $4,000,000   2033 4002-1071423    
88 Hwy 99 Resurface from Le Center to Hwy 13    $7,800,000   2029 4009-114    
88 US Hwy 75 Resurface from Luverne to Trosky   $12,100,000   2028 6705-47    
87 Hwy 15 Resurface from Iowa to Fairmont   $5,200,000   2033 4603-52    
87 Hwy 4 Resurface Hwy 4 from Brown Hwy 18 to Ellsworth St in the City of Sleepy Eye; replace 2 bridges - TIED LET GROUP 10144   $13,100,000   2024   0801-35   
87 Hwy 4 Resurface Hwy 4 from Armstrong Blvd in St James to Brown Hwy 18; replace 1 bridge - TIED LET GROUP 10144   $9,100,000   2024   8302-48   
85 Hwy 13 Resurface from Waseca to Waterville    $5,700,000   2028 8102-30    
85 Hwy 22 Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20  $5,300,000 Not Selected Will be completed with remainder of the Hwy 22 to US 169 in St. Peter
85 Hwy 22 Reconstruction from Hungry Hollow Rd to Maple Hill Rd  $1,500,000 Not Selected NA 
84 Hwy 19 Resurface from Hwy 169 to east Jct of Hwy 13   $12,900,000   2031 4004-126    
83 Hwy 86 Resurface Hwy 86 from I-90 to Hwy 60 (Except Lakefield); replace or improve drainage; replace signs   $4,600,000   2033 3208-1101745    
83 US Hwy 75 Resurface from Iowa border to Luverne   $5,000,000   2030 6704-116    
82 Hwy 19 Medium mill and overlay from Red Wing Ave to Leroy Ave  $800,000 Not Selected NA 
82 Hwy 68 Reclaim and overlay from Hwy 15 south of New Ulm to US Hwy 169  $14,800,000 Not Selected NA 
81 Hwy 13 Resurface from Waterville to Montgomery    $15,000,000   2030 4001-48    
81 Hwy 19 Medium mill and overlay from Leroy Ave S to Hwy 13  $200,000 Not Selected NA 
81 Hwy 4 Resurface Hwy 4 from Martin Hwy 26 to Hwy 60; replace 1 bridge and repair 3 bridges   $21,954,637   2024, 2025   4602-27   
80 Hwy 19 Resurface from Winthrop to Gaylord   $8,800,000   2029 7205-1070404    
80 Hwy 22 Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15  $5,500,000 Not Selected NA 
80 Hwy 22 Medium mill and overlay from County Road 90 to Hungry Hollow Rd  $300,000 Not Selected NA 
80 Hwy 30 Medium mill and overlay from Cottonwood County Road 7/Railroad Corssing to US 71  $8,400,000 Not Selected Completed in 2020
80 Hwy 93 Reconstruct Hwy 93 from Hwy 169 to flood wall in Henderson; replace 1 bridge and add 2 bridges    $34,250,000   2024   7212-21   Flood mitigation project included with bonding bill
79 Hwy 30 Resurface Hwy 30 from US 71 to Darfur; replace or improve drainage, signing and lighting   $6,100,000   2032 1702-1101744    
79 Hwy 5 Cold in place recycling and medium overlay from Hwy 22 to east of 4th St in Arlington  $3,700,000 Not Selected NA 
78 Hwy 22 Resurface from west Jct of CR 16 to Wells    $6,500,000   2030 2204-27    
78 Hwy 5 Cold in place recycling and medium overlay from 5th St to US 212  $3,100,000 Not Selected NA 
78 Hwy 91 Resurface Hwy 91 from Iowa to Adrian   $8,000,000   2033 5307-1112064    
77 Hwy 22 Resurface from Iowa border to west Jct of CR 16   $8,400,000   2031 2203-115    
77 Hwy 270 Resurface from Hills to Hwy 75   $3,800,000   2031 6706-1071303    
77 Hwy 99 Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center  $6,300,000 Not Selected NA 
76 Hwy 19 Resurface Hwy 19 from Fairfax to Gibbon   $6,500,000   2033 7204-1112109    
76 Hwy 264 Resurface from Round Lake to I-90   $2,000,000   2030 5310-1071283    
76 Hwy 93 Medium mill and overlay from Minnesota River Bridge to US Hwy 169  $400,000 Not Selected NA 
75 Hwy 22 Medium mill and overlay from Maple Hill Road to Hwy 86  $400,000 Not Selected NA 
74 Hwy 13 Medium mill and overlay from 2.2 miles north of Hwy 30 to 1.5 miles north of Waseca  $4,100,000 Not Selected NA 
74 Hwy 22 Resurface Hwy 22 from Gaylord to Hwy 212; replace bridge 72003 and rehab bridge 72004; replace or improve drainage, signing and lighting   $4,800,000   2033 7208-1101723    
73 Hwy 19 Medium mill and overlay from 11th Ave SW to New Prague western City Limits  $200,000 Not Selected NA 
72 Hwy 257 Resurface from Hanska to Hwy 15   $2,000,000   2029 0808-1038067    
72 Hwy 83 Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41  $7,200,000 Not Selected NA 
71 Hwy 109 Hwy 109 from east side of Winnebago to western Wells limits  $7,300,000 Not Selected NA 
71 Hwy 22 Reconstruct from Hwy 83 to Bassett Dr   $16,500,000   2031 0704-1069603    
71 Hwy 22 Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90  $3,400,000 Not Selected NA 
71 Hwy 30 Resurface from Hwy 15 to Hwy 169    $6,000,000   2030 0705-26    
71 Hwy 68 Medium mill and overlay from County Road 4 in Morgan to Hwy 4 in Sleepy Eye  $4,000,000 Not Selected NA 
70 Hwy 13 Medium mill and overlay from Hwy 30 to 2.2 miles north of Hwy 30  $1,200,000 Not Selected NA 
70 Hwy 22 Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90  $300,000 Not Selected NA 
70 Hwy 22 Medium mill and overlay from .33 south of Hwy 83 to 200ft north of Hwy 83  $400,000 Not Selected NA 
70 Hwy 83 Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41  $300,000 Not Selected NA 
69 Hwy 19 Resurface from Gaylord to Hwy 169   $19,200,000   2029 7206-117    
68 Hwy 30 Medium mill and overlay from 1 mile east of US Hwy 169 to Troendle St NW  $5,200,000 Not Selected NA 
68 Hwy 4 Medium mill and overlay from Iowa/Minnesota Border to  County Road 26 (where Hwy 4 turns right)  $5,200,000 Not Selected NA 
68 Hwy 4 Medium mill  and overlay from Hwy 68 to Hwy 19 in Fairfax  $4,300,000 Not Selected NA 
68 Hwy 83 Medium mill and overlay from Hwy 30 to Blue Earth County Road 173  $6,900,000 Not Selected NA 
67 Hwy 19 Medium mill and overlay from Alton Ave to Red Wing Ave  $200,000 Not Selected NA 
65 Hwy 22 Medium mill and overlay from 1500 south of the west junction US Hwy 212 to US Hwy 212  $200,000 Not Selected NA 
64 Hwy 99 Medium mill and overlay from Hwy 13 to Hwy 21  $4,100,000 Not Selected NA 
63 Hwy 22 Resurface Hwy 22 from St Peter to Hwy 111   $5,500,000   2027   5205-113   
61 Hwy 109 Medium mill and overlay from Hwy 22 to I-90  $5,200,000 Not Selected NA 
61 US59 Medium mill and overlay from the Iowa/Minnesota Border go Hwy 60  $2,200,000 Not Selected NA 
60 Hwy 5 Medium mill and overlay from Sibley County Road 15 to 5th St  $300,000 Not Selected NA 
60 Hwy 83 Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane  $300,000 Not Selected NA 
54 Hwy 4 Reclaim and overlay from 3rd Ave SW in Sleepy Eye to Hwy 69  $2,000,000 Not Selected NA 
53 Hwy 19 Minor CPR and diamond grinding from Hwy 4 to Hwy 15  $5,000,000 Not Selected NA 
43 Hwy 13 Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca  $500,000 Not Selected NA 
43 Hwy 62 Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom  $12,300,000 Not Selected NA 
41 Hwy 111 Thin mill and overlay from US 14 to Seventh Street in Nicollet  $200,000 Not Selected NA 
41 Hwy 5 Medium mill and overlay from 4th Ave E to Blue Earth County Road 15  $2,900,000 Not Selected NA 
40 Hwy 13 Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103  $500,000 Not Selected NA 
40 Hwy 83 Thin mill and overlay from Ichabod Lane to Hwy 22/Victory Dr  $100,000 Not Selected NA 
23 Hwy 91 Medium mill and overlay from I-90 to Murray County line  $3,900,000 Not Selected NA 
20 Hwy 30 Cold in place recycling from Hwy 83 to western New Richland city limits  $4,900,000 Not Selected NA 
19 Hwy 22 Reclaim and overlay from Hwy 111 to Sibley County Road 67  $7,400,000 Not Selected NA 
18 Hwy 13 Minor CPR and diamond grinding from .2 miles south of Hwy 60 to .26 miles north of Hwy 60  $200,000 Not Selected NA 
18 Hwy 19 Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW  $200,000 Not Selected NA 
17 Hwy 30 Cold in place recycling from Hwy 22 to Hwy 83  $5,500,000 Not Selected NA 
16 Hwy 4 Minot CPR and diamond grinding from Hwy 60 to Wantonwan County Road 12  $200,000 Not Selected NA 
11 Hwy 30 Thin mill and overlay from Troendle St to Mapleton city limits  $400,000 Not Selected NA 
6 Hwy 30 Thin mill and overlay from US Hwy 169 to east side of Amboy  $400,000 Not Selected NA 

 

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
90 Hwy 13 Resurface from Montgomery to New Prague   $3,000,000   2030 4002-1071423    
89 Hwy 22 Resurface Hwy 22 from Hwy 29 in Wells to Hwy 30 in Mapleton; extend 1 bridge   $9,065,000   2023   2205-13   
88 Hwy 99 Resurface from Le Center to Hwy 13    $7,000,000   2029 4009-114    
88 US Hwy 75 Resurface from Luverne to Trosky   $12,100,000   2028 6705-47    
87 Hwy 15 Resurface from Iowa to Fairmont   $5,200,000   2032 4603-52    
87 Hwy 4 Resurface Hwy 4 from Armstrong Blvd in St James to Brown Hwy 18; replace 1 bridge $8,200,000   2023   8302-48   
87 Hwy 4 Resurface Hwy 4 from Brown Hwy 18 to Ellsworth St in the City of Sleepy Eye; replace 2 bridges $12,600,000   2023, 2024   0801-35   
85 Hwy 13 Resurface from Waseca to Waterville    $5,700,000   2031 8102-30    
85 Hwy 22 Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20  $5,300,000 Not Selected Will be completed with remainder of the Hwy 22 to US 169 in St. Peter
85 Hwy 22 Reconstruction from Hungry Hollow Rd to Maple Hill Rd  $1,500,000 Not Selected NA 
84 Hwy 19 Resurface from Hwy 169 to east Jct of Hwy 13   $12,900,000   2031 4004-126    
83 Hwy 86 Resurface Hwy 86 from I-90 to Hwy 60 (Except Lakefield); replace or improve drainage; replace signs   $4,600,000   2032 3208-1101745    
83 US Hwy 75 Resurface from Iowa border to Luverne   $5,000,000   2030 6704-116    
82 Hwy 19 Medium mill and overlay from Red Wing Ave to Leroy Ave  $800,000 Not Selected NA 
82 Hwy 68 Reclaim and overlay from Hwy 15 south of New Ulm to US Hwy 169  $14,800,000 NA  NA 
81 Hwy 13 Resurface from Waterville to Montgomery    $15,000,000   2028 4001-48    
81 Hwy 19 Medium mill and overlay from Leroy Ave S to Hwy 13  $200,000 Not Selected NA 
81 Hwy 4 Resurface Hwy 4 from Martin Hwy 26 to Hwy 60; replace 1 bridge and repair 3 bridges   $17,800,000   2024, 2025   4602-27   
81 US Hwy 75 Thick Mill and overlay from I-90 to Main St (Rock County Road 4)  $1,400,000 Not Selected NA 
80 Hwy 19 Resurface from Winthrop to Gaylord   $8,800,000   2028 7205-1070404    
80 Hwy 22 Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15  $5,500,000 Not Selected NA 
80 Hwy 22 Medium mill and overlay from County Road 90 to Hungry Hollow Rd  $300,000 Not Selected NA 
80 Hwy 30 Medium mill and overlay from Cottonwood County Road 7/Railroad Corssing to US 71  $8,400,000 Not Selected Completed in 2020
80 Hwy 93 Reconstruct Hwy 93 from Hwy 169 to flood wall in Henderson; repair 1 bridge    $17,900,000   2023   7212-21; Flood mitigation project included with bonding bill
79 Hwy 30 Resurface Hwy 30 from US 71 to Hwy 4; replace or improve drainage, signing and lighting   $9,363,000   2032 1702-1101744    
79 Hwy 5 Cold in place recycling and medium overlay from Hwy 22 to east of 4th St in Arlington  $3,700,000 Not Selected NA 
78 Hwy 22 Resurface from west Jct of CR 16 to Wells    $6,500,000   2029 2204-27    
78 Hwy 5 Cold in place recycling and medium overlay from 5th St to US 212  $3,100,000 Not Selected NA 
77 Hwy 22 Resurface from Iowa border to west Jct of CR 16   $8,400,000   2031 2203-115    
77 Hwy 270 Resurface from Hills to Hwy 75   $3,800,000   2030 6706-1071303    
77 Hwy 99 Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center  $6,300,000 Not Selected NA 
76 Hwy 264 Resurface from Round Lake to I-90   $2,000,000   2031 5310-1071283    
76 Hwy 93 Medium mill and overlay from Minnesota River Bridge to US Hwy 169  $400,000 Not Selected NA 
75 Hwy 22 Medium mill and overlay from Maple Hill Road to Hwy 86  $400,000 Not Selected NA 
74 Hwy 13 Medium mill and overlay from 2.2 miles north of Hwy 30 to 1.5 miles north of Waseca  $4,100,000 Not Selected NA 
74 Hwy 22 Resurface Hwy 22 from Gaylord to Hwy 212; replace bridge 72003 and rehab bridge 72004; replace or improve drainage, signing and lighting   $3,800,000   2032 7208-1101723    
73 Hwy 19 Medium mill and overlay from 11th Ave SW to New Prague western City Limits  $200,000 Not Selected NA 
72 Hwy 257 Resurface from Hanska to Hwy 15   $2,000,000   2029 0808-1038067    
72 Hwy 83 Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41  $7,200,000 Not Selected NA 
71 Hwy 109 Hwy 109 from east side of Winnebago to western Wells limits  $7,300,000 Not Selected NA 
71 Hwy 22 Reconstruct from Hwy 83 to Bassett Dr   $13,000,000   2030 0704-1069603    
71 Hwy 22 Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90  $3,400,000 Not Selected NA 
71 Hwy 30 Resurface from Hwy 15 to Hwy 169    $6,000,000   2030 0705-26    
71 Hwy 68 Medium mill and overlay from County Road 4 in Morgan to Hwy 4 in Sleepy Eye  $4,000,000 Not Selected NA 
70 Hwy 13 Medium mill and overlay from Hwy 30 to 2.2 miles north of Hwy 30  $1,200,000 Not Selected NA 
70 Hwy 22 Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90  $300,000 Not Selected NA 
70 Hwy 22 Medium mill and overlay from .33 south of Hwy 83 to 200ft north of Hwy 83  $400,000 Not Selected NA 
70 Hwy 83 Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41  $300,000 Not Selected NA 
69 Hwy 19 Resurface from Gaylord to Hwy 169   $19,200,000   2028 7206-117    
68 Hwy 30 Medium mill and overlay from 1 mile east of US Hwy 169 to Troendle St NW  $5,200,000 Not Selected NA 
68 Hwy 4 Medium mill and overlay from Iowa/Minnesota Border to  County Road 26 (where Hwy 4 turns right)  $5,200,000 Not Selected NA 
68 Hwy 4 Medium mill  and overlay from Hwy 68 to Hwy 19 in Fairfax  $4,300,000 Not Selected NA 
68 Hwy 83 Medium mill and overlay from Hwy 30 to Blue Earth County Road 173  $6,900,000 Not Selected NA 
67 Hwy 19 Medium mill and overlay from Alton Ave to Red Wing Ave  $200,000 Not Selected NA 
65 Hwy 22 Medium mill and overlay from 1500 south of the west junction US Hwy 212 to US Hwy 212  $200,000 Not Selected NA 
64 Hwy 99 Medium mill and overlay from Hwy 13 to Hwy 21  $4,100,000 Not Selected NA 
63 Hwy 22 Resurface Hwy 22 from St Peter to Hwy 111   $5,500,000   2026   5205-113   
63 Hwy 91 Reclaim and overlay from Iowa/Minnesota Border to Adrian City Limits  $9,400,000 Not Selected NA 
61 Hwy 109 Medium mill and overlay from Hwy 22 to I-90  $5,200,000 Not Selected NA 
61 US59 Medium mill and overlay from the Iowa/Minnesota Border go Hwy 60  $2,200,000 Not Selected NA 
60 Hwy 5 Medium mill and overlay from Sibley County Road 15 to 5th St  $300,000 Not Selected NA 
60 Hwy 83 Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane  $300,000 Not Selected NA 
54 Hwy 4 Reclaim and overlay from 3rd Ave SW in Sleepy Eye to Hwy 69  $2,000,000 Not Selected NA 
53 Hwy 19 Minor CPR and diamond grinding from Hwy 4 to Hwy 15  $5,000,000 Not Selected NA 
46 Hwy 21 Resurface from Hwy 99 to Hwy 13    $4,251,047   2023   6605-38   
43 Hwy 13 Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca  $500,000 Not Selected NA 
43 Hwy 62 Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom  $12,300,000 Not Selected NA 
41 Hwy 111 Thin mill and overlay from US 14 to Seventh Street in Nicollet  $200,000 Not Selected NA 
41 Hwy 5 Medium mill and overlay from 4th Ave E to Blue Earth County Road 15  $2,900,000 Not Selected NA 
40 Hwy 13 Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103  $500,000 Not Selected NA 
40 Hwy 83 Thin mill and overlay from Ichabod Lane to Hwy 22/Victory Dr  $100,000 Not Selected NA 
23 Hwy 91 Medium mill and overlay from I-90 to Murray County line  $3,900,000 Not Selected NA 
20 Hwy 30 Cold in place recycling from Hwy 83 to western New Richland city limits  $4,900,000 Not Selected NA 
19 Hwy 22 Reclaim and overlay from Hwy 111 to Sibley County Road 67  $7,400,000 Not Selected NA 
18 Hwy 13 Minor CPR and diamond grinding from .2 miles south of Hwy 60 to .26 miles north of Hwy 60  $200,000 Not Selected NA 
18 Hwy 19 Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW  $200,000 Not Selected NA 
17 Hwy 30 Cold in place recycling from Hwy 22 to Hwy 83  $5,500,000 Not Selected NA 
16 Hwy 4 Minot CPR and diamond grinding from Hwy 60 to Wantonwan County Road 12  $200,000 Not Selected NA 
11 Hwy 30 Thin mill and overlay from Troendle St to Mapleton city limits  $400,000 Not Selected NA 
6 Hwy 30 Thin mill and overlay from US Hwy 169 to east side of Amboy  $400,000 Not Selected NA 

 

View more detailed scores (Excel).

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
90 Hwy 13 Thick overlay from northern Montgomery City limits to Hwy 19 in New Prague  $5,300,000 2030 NA 
88 US Hwy 75 Cold in place recycling and medium overlay from Veterans Dr to Hwy 268/Trosky  $5,600,000 2028 6705-47
88 Hwy 99 Medium mill and overlay from Le Sueur County Road 11 to Hwy 13  $2,900,000 2029 NA 
87 Hwy 15 Cold in place recycling and medium overlay from the Iowa/Minnesota Border to Johnson St  $4,700,000 2031 4603-52
85 Hwy 13 Medium mill and overlay from Waseca County Road 30 to Hwy 60  $4,400,000 2031 8102-30
85 Hwy 22 Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20  $5,300,000 Not Selected Will be completed with remainder of the Hwy 22 to US 169 in St. Peter
85 Hwy 22 Reconstruction from Hungry Hollow Rd to Maple Hill Rd  $1,500,000 Not Selected NA 
84 Hwy 19 Reclaim and overlay from US Hwy 169 to Le Sueur County Road 143  $8,200,000 2029 NA 
83 Hwy 13 Reconstruction from Hwy 21 to Montgomery City Limits  $6,800,000 2023 4002-49
83 US Hwy 75 Cold in place recycling from Iowa/Minnesota Border to 101st St  $4,400,000 2030 6704-116
82 Hwy 13 Cold in place recycling from Hwy 99 to Hwy 21/Montgomery City Limits  $1,500,000 2028 4001-48
82 Hwy 19 Medium mill and overlay from Red Wing Ave to Leroy Ave  $800,000 2029 NA 
82 Hwy 68 Reclaim and overlay from Hwy 15 south of New Ulm to US Hwy 169  $14,800,000 2029 NA 
81 Hwy 4 Cold in place recycling and medium overlay from County Road 26 to Hwy 60  $8,200,000 2022 4602-27
81 Hwy 13 Cold in place recycling and medium overlay from Hwy 60 to Hwy 99  $5,500,000 2028 4001-48
81 Hwy 19 Medium mill and overlay from Leroy Ave S to Hwy 13  $200,000 2029 NA 
81 US Hwy 75 Thick Mill and overlay from I-90 to Main St (Rock County Road 4)  $1,400,000 Not Selected NA 
80 Hwy 19 Cold in place recycling and medium overlay from Hwy 15 near Winthrop to western Gaylord City limits  $3,500,000 2028 NA 
80 Hwy 30 Medium mill and overlay from Cottonwood County Road 7/Railroad Corssing to US 71  $8,400,000 Not Selected Completed in 2020
80 Hwy 22 Medium mill and overlay from North Ave to US Hwy 212  $6,300,000 Not Selected NA 
80 Hwy 22 Medium mill and overlay from County Road 90 to Hungry Hollow Rd  $300,000 Not Selected NA 
80 Hwy 22 Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15  $5,500,000 Not Selected NA 
79 Hwy 5 Cold in place recycling and medium overlay from Hwy 22 to east of 4th St in Arlington  $3,700,000 Not Selected NA 
79 Hwy 30 Medium mill and overlay from US Hwy 71 to Darfur  $7,200,000 Not Selected NA 
79 Hwy 30 Thick mill and overlay from Darfur to Hwy 4  $6,800,000 Not Selected NA 
79 US Hwy 75 Reconstruction from 101st St to the north end of bridge over I-90  $1,300,000 2030 6704-116
78 Hwy 5 Cold in place recycling and medium overlay from 5th St to US 212  $3,100,000 Not Selected NA 
78 Hwy 22 Medium mill and overlay from County Road 16 (where Hwy 22 turns right) to 10th St SW in Wells  $2,700,000 2028 2204-27
77 Hwy 22 Cold in place recycling and medium overlay from 10th St in Wells to 6th Ave NE  $6,400,000 2023 2205-13
77 Hwy 22 Medium mill and overlay from Iowa/Minnesota Border to Faribault County Road 16  $5,600,000 2031 2203-115
77 Hwy 99 Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center  $6,300,000 Not Selected NA 
77 Hwy 270 Reclaim and overlay from Railroad overpass to US Hwy 75  $5,600,000 2030 NA 
76 Hwy 93 Medium mill and overlay from Minnesota River Bridge to US Hwy 169  $400,000 Not Selected NA 
76 Hwy 264 Reclaim and overlay from Nobles County Road 21 in Round Lake to I-90  $5,600,000 2031 NA 
75 Hwy 22 Medium mill and overlay from Maple Hill Road to Hwy 86  $400,000 Not Selected NA 
75 Hwy 93 Medium mill and overlay from US Hwy 169 to Hwy 19 in Henderson  $1,500,000 2023 7212-21; Flood mitigation project included with bonding bill
74 Hwy 13 Medium mill and overlay from 2.2 miles north of Hwy 30 to 1.5 miles north of Waseca  $4,100,000 Not Selected NA 
73 Hwy 19 Medium mill and overlay from 11th Ave SW to New Prague western City Limits  $200,000 2029 NA 
72 Hwy 4 Reclaim and overlay from Wantonwan County Road 12 (where Hwy 4 turns left in Saint James) to south side of Sleepy Eye  $13,600,000 2023 0801-35
72 Hwy 83 Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41  $7,200,000 Not Selected NA 
72 Hwy 257 Reclaim and overlay from Hanska to Hwy 15  $2,800,000 2029 NA 
71 Hwy 4 Major CPR and diamond grinding from .4 miles south of Hwy 60 to western junction Hwy 60  $300,000 2022 4602-27
71 Hwy 30 Medium mill and overlay from County Road 24 to west end of bridge 07038  $4,200,000 2030 NA 
71 Hwy 22 Reconstruction from Hwy 83 to Bassett Dr in Mankato   $12,400,000 2030 NA 
71 Hwy 22 Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90  $3,400,000 Not Selected NA 
71 Hwy 68 Medium mill and overlay from County Road 4 in Morgan to Hwy 4 in Sleepy Eye  $4,000,000 Not Selected NA 
71 Hwy 109 Hwy 109 from east side of Winnebago to western Wells limits  $7,300,000 Not Selected NA 
70 Hwy 13 Medium mill and overlay from Hwy 30 to 2.2 miles north of Hwy 30  $1,200,000 Not Selected NA 
70 Hwy 22 Medium mill and overlay from .33 south of Hwy 83 to 200ft north of Hwy 83  $400,000 Not Selected NA 
70 Hwy 22 Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90  $300,000 Not Selected NA 
70 Hwy 83 Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41  $300,000 Not Selected NA 
69 Hwy 19 Medium mill and overlay from .72 miles east of US Hwy 169 to .46 miles west of US Hwy 169  $600,000 2026 7206-117
69 Hwy 19 Reclaim and overlay from Hwy 5 to Henderson western city limits.  $9,300,000 2026 7206-117
68 Hwy 4 Medium mill  and overlay from Hwy 68 to Hwy 19 in Fairfax  $4,300,000 Not Selected NA 
68 Hwy 4 Medium mill and overlay from Iowa/Minnesota Border to  County Road 26 (where Hwy 4 turns right)  $5,200,000 Not Selected NA 
68 Hwy 30 Medium mill and overlay from 1 mile east of US Hwy 169 to Troendle St NW  $5,200,000 Not Selected NA 
68 Hwy 83 Medium mill and overlay from Hwy 30 to Blue Earth County Road 173  $6,900,000 Not Selected NA 
67 Hwy 19 Medium mill and overlay from Alton Ave to Red Wing Ave  $200,000 Not Selected NA 
65 Hwy 19 Thick mill and overlay from Henderson Station Road to US Hwy 169  $1,000,000 2026 7206-117
65 Hwy 22 Medium mill and overlay from 1500 south of the west junction US Hwy 212 to US Hwy 212  $200,000 Not Selected NA 
64 Hwy 30 Cold in place recycling from West end of bridge 07038 to US Hwy 169  $700,000 2030 NA 
64 Hwy 99 Medium mill and overlay from Hwy 13 to Hwy 21  $4,100,000 Not Selected NA 
63 Hwy 30 Cold in place recycling from Hwy 15 to Wantonwan County Road 24  $1,500,000 2030 NA 
63 Hwy 22 Medium mill and overlay from Nicollet County Road 20 to Hwy 111  $1,300,000 2025 5205-113
63 Hwy 91 Reclaim and overlay from Iowa/Minnesota Border to Adrian City Limits  $9,400,000 Not Selected NA 
63 Hwy 109 Medium mill and overlay from Wells City limits to Hwy 22  $400,000 2026 2204-26; Can be found as an urban project, but pairing with Hwy 22 work in Wells. 
61 US59 Medium mill and overlay from the Iowa/Minnesota Border go Hwy 60  $2,200,000 Not Selected NA 
61 Hwy 109 Medium mill and overlay from Hwy 22 to I-90  $5,200,000 Not Selected NA 
60 Hwy 5 Medium mill and overlay from Sibley County Road 15 to 5th St  $300,000 Not Selected NA 
60 Hwy 83 Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane  $300,000 Not Selected NA 
59 Hwy 19 Medium mill and overlay from Sibley/Le Sueur County line to east end of bridge 40001 near Henderson  $300,000 2026 7206-117; addressing with adjacent pavements
54 Hwy 4 Reclaim and overlay from 3rd Ave SW in Sleepy Eye to Hwy 69  $2,000,000 Not Selected NA 
53 Hwy 19 Minor CPR and diamond grinding from Hwy 4 to Hwy 15  $5,000,000 Not Selected NA 
53 Hwy 86 Thin mill and overlay from bridge 32084 to Hwy 60  $4,500,000 Not Selected NA 
48 Hwy 15 Thic overlay and drainage work from Johnson St to Goemann Rd  $4,800,000 Not Selected Completed in 2017
46 Hwy 21 Medium mill and overlay from Hwy 99 to Hwy 13  $4,100,000 2027 6605-38
43 Hwy 13 Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca  $500,000 Not Selected NA 
43 Hwy 62 Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom  $12,300,000 Not Selected NA 
41 Hwy 5 Medium mill and overlay from 4th Ave E to Blue Earth County Road 15  $2,900,000 Not Selected NA 
41 Hwy 111 Thin mill and overlay from US 14 to Seventh Street in Nicollet  $200,000 Not Selected NA 
40 Hwy 13 Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103  $500,000 Not Selected NA 
40 Hwy 83 Thin mill and overlay from Ichabod Lane to Hwy 22/Victory Dr  $100,000 Not Selected NA 
38 Hwy 99 Medium mill and overlay from Minnesota River Bridge to Railroad crossing  $200,000 Not Selected Completed with 2019 project
29 Hwy 22 Medium mill and overlay from east junction Faribault County Road 16 to west junction Faribault County Road 16  $600,000 2031 2203-115; One-mile segment that will be addressed with Hwy 22 project that extends to the Iowa border. 
23 Hwy 91 Medium mill and overlay from I-90 to Murray County line  $3,900,000 Not Selected NA 
20 Hwy 30 Cold in place recycling from Hwy 83 to western New Richland city limits  $4,900,000 Not Selected NA
19 Hwy 22 Reclaim and overlay from Hwy 111 to Sibley County Road 67  $7,400,000 Not Selected NA
18 Hwy 13 Minor CPR and diamond grinding from .2 miles south of Hwy 60 to .26 miles north of Hwy 60  $200,000 Not Selected NA
18 Hwy 19 Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW  $200,000 2029 NA
17 Hwy 30 Cold in place recycling from Hwy 22 to Hwy 83  $5,500,000 Not Selected NA
16 Hwy 4 Minor CPR and diamond grinding from the south side of Sleepy Eye to Elsworth St  $300,000 2029 0802-47
16 Hwy 4 Minot CPR and diamond grinding from Hwy 60 to Wantonwan County Road 12  $200,000 Not Selected NA 
11 Hwy 30 Thin mill and overlay from Troendle St to Mapleton city limits  $400,000 Not Selected NA 
10 Hwy 19 Thin mill and overlay from western Henderson city limits to Sibley/le Sueur County line  $200,000 2026 7206-117; Addressing with adjacent pavements. 
9 Hwy 19 Thin mill and overlay from east end of Railroad bridge near Henderson to Henderson Station Road  $100,000 2026 7206-117; Addressing with adjacent pavements. 
6 Hwy 30 Thin mill and overlay from US Hwy 169 to east side of Amboy  $400,000 Not Selected NA

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
87 Hwy 4 Reclaim and overlay from Watonwan County Road 12 to South side of Sleepy Eye  $11,300,000 2023  
81 Hwy 4 Medium overlay from Martin County Road 26 to south of Hwy 60 $17,800,000 2024 Project originally selected prior to project selection policy. (In 2019-2022 STIP)
74 Hwy 4 Reclaim and overlay from 3rd Ave NW in Sleepy Eye to Hwy 68 $1,000,000 Not selected Waiting to coordinate with another project.
72 Hwy 4 Medium overlay from Hwy 68 to Hwy 19 in Fairfax $2,100,000 Not selected Not a district priority. Will continue to monitor pavement conditions.
68 Hwy 4 Medium mill and overlay from Iowa/Minnesota Border to west of Martin County Road 26 (where Hwy 4 turns right) $2,600,000 Not selected Received a new wearing course in 2019
61 Hwy 4 Major resurfacing from .4 miles south of Hwy 60 to Hwy 60 $200,000 2024 Project originally selected prior to project selection policy. (In 2019-2022 STIP)
41 Hwy 4 Minor resurfacing from south side of Sleepy Eye to Ellsworth St in Sleepy Eye $100,000 2027 Tying to other concrete work on Hwy 4 in Sleepy Eye
16 Hwy 4 Resurfacing from bridge over Hwy 60 to 10th ave S $100,000 Not selected  

Score Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
92 Hwy 19 Medium overlay from Highway 15 to the west city limits of Gaylord $7,800,000 Not selected District is focusing on pavements previously selected and those currently in worse condition
90 Hwy 22 Medium overlay from 10th Street SW to 6th Avenue NE $14,000,000 2023 NA
88 Hwy 22 Reclaim and overlay from Highway 111 to north of Sibley County Road 67  $5,200,000 2020 NA
88 Hwy 91 Medium overlay from the northern city limits of Adrian to the Nobles/Murray county line $5,100,000 2020 NA
88 Hwy 111 Reclaim and overlay from Highway 99 to Highway 22 $4,900,000 2020 NA
87 Hwy 5 Medium overlay from 5th Street on north side of Green Isle to Highway 212 $2,300,000 2021 NA
87 US75 Medium overlay from Veteran's Drive in Luverne to Highway 268/Trosky (D7/D8) $6,400,000 2025 NA
86 US75 Medium mill and overlay from north end of the bridge over I-90 and the I-90 ramp $500,000 2025 NA
86 Hwy 22 Medium overlay from north of Highway 83 to Bassett Drive in Mankato $1,300,000 Not selected Removed from CHIP to include with a future larger Highway 22 project. 
85 Hwy 99 Medium mill and overlay from Birch Street to Highway 169 $4,300,000 2021 NA
85 Hwy 15 Medium overlay from the Iowa/Minnesota State line to Johnson Street in Fairmont $4,500,000 2028 NA
85 Hwy 83 Reclaim and overlay from north of Blue Earth County Road 173 to east of Blue Earth County Road 41 (near Mankato) $7,200,000 Not selected Corridor needs more evaluation
84 Hwy 99 Medium overlay from Le Center to west of Highway 13 $2,800,000 2027 NA
84 Hwy 22 Reconstruction from north of the Blue Earth County Road 90 to 0.5 miles north of Blue Earth County Road 90 $700,000 Not selected Smaller segment. Should be included in a future larger Highway 22 project
83 US75 Medium overlay from the Iowa/Hwy state line to north of 101st Street $4,600,000 2028 NA
83 Hwy 13 Reclaim and overlay from north of Highway 60 to Highway 99 $9,100,000 2028 NA
83 Hwy 270 Reclaim and overlay from the railroad overpass at Hills to Highway 75 $5,800,000 Not selected Potential turnback, coordination with local partners will be needed
82 Hwy 4 Medium overlay from Watonwan County Road 26 to Highway 60 $21,000,000 2022 NA
82 Hwy 4 Reclaim and overlay from Watonwan County Road  12 to south side of Sleepy Eye $15,000,000 2023 NA
82 Hwy 13 Medium mill and overlay from Waseca County Road 30 to  South of Highway 60 $3,900,000 2026 NA
82 Hwy 13 Medium overlay from Highway 99 to Highway 21/south of Montgomery city limits $1,600,000 2028 Part of Waterville to Montgomery Project
82 Hwy 5 Reclaim and overlay from Division Street in Gaylord to Sibley County Road 17 $4,100,000 Not selected Not a current district priority, but will continue to monitor for pavement performance
82 Hwy 13 Medium overlay from 5th Street SE to Waseca County Road 13 $600,000 Not selected Waiting to coordinate with another project.
81 Hwy 13 Medium mill and overlay from Highway 21 to southern Montgomery city limits $800,000 2028 NA
81 Hwy 19 Medium mill and overlay from the New Prague to east of Alton Avenue $500,000 2029 NA
81 Hwy 19 Medium mill and overlay from east of Red Wing Avenue to east of LeRoy Avenue South  $900,000 2029 NA
81 Hwy 264 Reclaim and overlay from Round Lake to north ramps at I-90 $5,600,000 Not selected Potential turnback, coordination with local partners will be needed
80 Hwy 253 Reclaim and overlay from Faribault County Road 2 to I-90 $3,500,000 2020 NA
80 Hwy 254 Reclaim and overlay from 1st Street to I-90 $2,600,000 2020 NA
80 Hwy 19 Repair Concrete from Highway 4 to Highway 15  $21,000,000 Not selected Continue to monitor for pavement performance
80 Hwy 68 Reclaim and overlay from Highway 15 south of New Ulm to Highway 169 $16,000,000 2029 NA
80 Hwy 93 Medium overlay from Bridge 72007 (near Le Sueur) to Highway 169 $400,000 Not selected Waiting to coordinate with another project.
79 Hwy 22 Medium mill and overlay from north of Sibley County Road 67 to Gaylord city limits $200,000 2020 NA
79 Hwy 22 Medium mill and overlay from south of Highway 83 to north of Highway 83 $400,000 Not selected Smaller segment. Should be included in a future larger Highway 22 project
79 Hwy 22 Medium mill and overlay from north of Blue Earth County Road 90 to north of Hungry Hollow Road $400,000 Not selected Should be included in a future larger Highway 22 project
79 Hwy 22 Medium mill and overlay from north of Hungry Hollow Road to north of Maple Hill Road $200,000 Not selected Should be included in a future larger Highway 22 project
78 Hwy 4 Medium mill and overlay from the Iowa/Minnesota state line to Martin County Road 26 $3,700,000 2020 NA
78 Hwy 30 Medium overlay from Highway 22 to Highway 83 $3,800,000 2020 NA
78 Hwy 99 Medium overlay from Highway 13 to Highway 21 $2,800,000 2020 NA
78 Hwy 30 Medium mill and overlay from Cottonwood County Road 7 to Highway 71 $6,200,000 2021 NA
78 Hwy 13 Thick overlay from Montgomery city limits to New Prague $5,500,000 Not selected Waiting to coordinate with another project.
78 Hwy 30 Medium mill and overlay from East of Highway 169 (Amboy eastern city limits) to east of Troendle Street SW $5,200,000 Not selected Not a current district priority, but will continue to monitor for pavement performance
78 Hwy 109 Medium mill and overlay from Winnebago to east of 560th Avenue (west of Wells) $11,000,000 Not selected Not a current district priority, but will continue to monitor for pavement performance
77 Hwy 93 Medium mill and overlay from Highway 169 to the southern city limits of Henderson $1,600,000 2022 NA
77 Hwy 22 Medium mill and overlay from the Iowa/Minnesota state line to  Faribault County Road 16 $10,000,000 2027  
77 Hwy 257 Reclaim and overlay from southern city limits of Hanska to Highway 15 $2,900,000 2028 NA
77 Hwy 19 Medium mill and overlay from east of Highway 169 to east of Le Sueur County Road 143 $6,100,000 2029  
77 Hwy 19 Medium mill and overlay from west of 11th Avenue SW to the New Prague $200,000 2029  
76 Hwy 22 Reclaim and overlay from Faribault County Road 16 (where Highway 22 turns North) to 10th Street SW in Wells $3,800,000 2025  
76 Hwy 83 Medium mill and overlay from west of Ichabod Lane to Highway 22/Victory Drive $200,000 Not selected NA
76 Hwy 99 Medium mill and overlay from the railroad crossing on the East side of St. Peter to the Western city limits of Le Center $12,000,000 Not selected NA
75 Hwy 13 Medium mill and overlay from Hwy 30 to 1.5 miles South of Waseca $3,900,000 Not selected NA
74 Hwy 4 Medium mill and overlay from Highway 68 to Highway 19  $6,600,000 Not selected NA
74 Hwy 60 Major concrete rehabilitation from Highway 13 to east of TH13 $200,000 Not selected NA
73 Hwy 91 Medium mill and overlay from the southern city limits of Adrian to 8th Street in Adrian $300,000 2020 Selected prior to policy (in 2019-2022 STIP)
73 Hwy 19 Medium mill and overlay from west of Highway 169 to west of Highway 169 $700,000 2029 Small segment with bridge work that will be included with a project on Highways 13/19/169
73 Hwy 4 Medium overlay from 3rd Avenue NW in Sleepy Eye to North side of Highway 68 intersection $1,300,000 Not selected NA
73 Hwy 13 Medium overlay from Highway 30 in New Richland to 2.2 miles North of Highway 30 $1,100,000 Not selected NA
72 Hwy 91 Reclaim and overlay from southern Ellsworth city limits to North Avenue in Ellsworth $1,300,000 Not selected NA
71 Hwy 30 Thin overlay Blue Earth County Road 24 to west end of Bridge 07038  $4,600,000 2026 Selected prior to policy (in 2019-2028 CHIP)
71 Hwy 19 Medium mill and overlay from east of Le Sueur County Road 143 to west of 11th Avenue SW $300,000 2029 Selected prior to policy (in 2019-2028 CHIP)
71 Hwy 22 Medium mill and overlay from Linden Avenue to North Avenue in Gaylord $400,000 Not selected NA
71 Hwy 86 Reclaim and overlay I-90 to Highway 60 $19,000,000 Not selected NA
70 Hwy 263 Reclaim and overlay from Ceylon to I-90 $6,200,000 2021 Selected prior to policy (in 2019-2022 STIP)
70 Hwy 22 Medium mill and overlay north Sunrise Drive in St. Peter to south of Nicollet Count Road 20 $300,000 2024 Small segment that will be included in larger Highway 22 project
70 Hwy 19 Medium mill and overlay from railroad bridge east of Henderson to east of Henderson Station Road $200,000 2025 Segment part of larger Highway 19 project
70 Hwy 30 Medium overlay from the Highway 169/Amboy city limit to east of the South Junction of Highway 169 $900,000 Not selected NA
70 Hwy 19 Medium mill and overlay from East of Alton Avenue to Red Wing Avenue  $200,000 2029 Selected prior to policy (in 2019-2028 CHIP), previously selected because of bridge and highway work to the west
70 Hwy 83 Medium mill and overlay from east of Blue Earth County Road 41 (near Mankato) to west of Blue Earth County Road 41 $200,000 Not selected NA
70 Hwy 91 Reclaim and overlay from Iowa/Minnesota state line to Ellsworth $800,000 Not selected NA
69 Hwy 30 Medium mill and overlay from Highway 83 to western city limits of New Richland $3,400,000 2020 Selected prior to policy (in 2019-2022 STIP)
69 Hwy 22 Medium mill and overlay from Maple Hill Road to  south of the Junction of Highway 83 $400,000 2029 Smaller segment. Will likely be included in larger Highway 22 project
68 Hwy 60 Reclaim and overlay Highway 14 to Waterville $18,500,000 2021 Selected prior to policy (in 2019-2022 STIP)
68 US59 Medium mill and overlay from Iowa/Minnesota state line to the South Junction of Highway 60 $2,300,000 Not selected NA
68 Hwy 62 Medium mill and overlay from East Fulda city limits to Plum Avenue in Windom $12,000,000 Not selected NA
67 Hwy 30 Medium mill and overlay from east of Troendle Street SW in Mapleton to western city limits of Mapleton $500,000 Not selected NA
67 Hwy 60 Major concrete rehabilitation from east of 3rd Street in Waterville to Highway 13 $300,000 Not selected NA
66 Hwy 83 Medium mill and overly from Highway 30 to Blue Earth County Road 173 $6,900,000 Not selected NA
65 Hwy 19 Medium mill and overlay from Henderson to the Sibley/Le Sueur county line $600,000 2025 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 19 Medium mill and overlay from east of LeRoy Avenue South to Highway 13 $200,000 2029 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 4 Major Concrete rehabilitation/diamond grinding from Willow Street NW to 3rd Avenue NW  $800,000 2027 Selected prior to policy (in 2019-2028 CHIP)
65 Hwy 30 Reclaim and overlay from Highway 71 to Highway 4 $26,000,000 Not selected NA
65 Hwy 5 Medium mill and overlay from Sibley County Road 15 to South of 5th Street  $300,000 Not selected NA
65 Hwy 13 Medium mill and overlay from Waseca County Road 103 to 5th Street SE in Waseca $800,000 Not selected NA
64 Hwy 91 Reclaim and overlay from North Avenue in Ellsworth to NE of Chaney Avenue $3,500,000 Not selected NA
63 Hwy 4 Thick overlay from Highway 60 near St. James to the west junction of Highway 60 $300,000 2022 Selected prior to policy (in 2019-2022 STIP)
63 Hwy 22 Medium mill an overlay from Fairbault County Road 6 to the West Junction of Faribault County Road 16 $400,000 2027 Selected prior to policy (in 2019-2028 CHIP), Coordinating with another MnDOT project
63 Hwy 30 Thin overlay from west end of Bridge 07038 to the Highway 169 $800,000 2026 Selected prior to policy (in 2019-2028 CHIP)
62 Hwy 4 Major Concrete rehabilitation/diamond grinding from the bridge over Highway 60 to Watonwan County Road 12  $400,000 Not selected NA
61 Hwy 13 Medium overlay Waseca City limits to Waseca County Road 103 (South of Waseca) $400,000 Not selected NA
61 Hwy 91 Reclaim and overlay from Dayton Avenue to the southern city limits of Adrian $2,500,000 Not selected NA
59 Hwy 99 Medium mill and overlay city limits of Nicollet to Heideman Avenue in Nicollet $500,000 Not selected NA
58 Hwy 60 Reclaim and overlay  from Highway 14 to north of Highway 14  $200,000 2021 Selected prior to policy (in 2019-2022 STIP)
58 Hwy 91 Reclaim and overlay from NE of Chaney Avenue to Dayton Avenue $1,500,000 Not selected  
54 Hwy 30 Medium mill and overlay from Murray/Cottonwood County line to Cottonwood County Road 7  $400,000 2021 Selected prior to policy (in 2019-2022 STIP)
54 Hwy 22 Medium mill and overlay from south of the West Junction of Highway 212 to Highway 212 $200,000 Not selected  
53 Hwy 30 Thin  overlay from Highway 15 to Blue Earth County Road 24 $1,600,000 2026 Selected prior to policy (in 2019-2028 CHIP)
50 Hwy 19 Medium mill and overlay from Highway 5 to Henderson $6,600,000 2025 Selected prior to policy (in 2019-2028 CHIP)
46 US75 Thick mill and overlay from James Street to Veteran's Drive $1,300,000 2025 Selected prior to policy (in 2019-2028 CHIP)
45 Hwy 21 Medium mill and overlay from Highway 99 to Highway 13 (South of Montgomery) $4,400,000 2027 Selected prior to policy (in 2019-2028 CHIP)
43 Hwy 22 Medium mill and overlay from south of Nicollet County Road 20 to Highway 111 $5,300,000 2024 Selected prior to policy (in 2019-2028 CHIP)
43 US75 Medium overlay from north of 101st Street to the north end of the Bridge over I-90 $200,000 2028 Selected prior to policy (in 2019-2028 CHIP)
43 Hwy 68 Reclaim and overlay from Morgan to the North Junction of Highway 4 $9,000,000 Not selected NA
42 Hwy 4 Minor concrete rehabilitation from Sleepy Eye to Elsworth Street in Sleepy Eye $200,000 2023 Selected prior to policy (in 2019-2028 CHIP)
41 Hwy 19 Medium mill and overlay from East of Henderson Station Road to west of Highway 169 $800,000 2025 Selected prior to policy (in 2019-2028 CHIP)
39 Hwy 22 Medium overlay from North Avenue to south of Highway 212 $11,500,000 Not selected NA
39 Hwy 86 Reclaim and overlay from Iowa/Minnesota state line to Bridge 32084 (ramps North of I90) $7,400,000 Not selected NA
35 Hwy 83 Medium overlay from west of Blue Earth County Road 41 (near Mankato) to west of Ichabod Lane $200,000 Not selected  
34 Hwy 91 Reclaim and overlay from 0.3 miles north of North Avenue in Ellsworth to 1 mile north of North Avenue $700,000 Not selected NA
31 Hwy 109 Medium overlay from east of 560th Avenue (west of Wells) to the western city limits of Wells $400,000 Not selected  
30 Hwy 19 Medium mill and overlay from the Sibley/Le Sueur county line to railroad bridge east of Henderson $400,000 2025 Selected prior to policy (in 2019-2028 CHIP)
25 Hwy 5 Medium mill and overlay from 4th Avenue East to Sibley County Road 15  $2,900,000 Not selected NA
23 Hwy 22 Reconstruction from Blue Earth County Road 15 to County Road 90 $11,500,000 Not selected NA
16 Hwy 13 Minor concrete rehabilitation from 0.2 miles south of Highway 60 to 0.2 miles north of Highway 60 $100,000 Not selected