All lanes, accesses and sidewalks open
Reconstructed, resurfaced and improved pedestrian features along the Hwy 12 through the communities of Howard Lake, Waverly and Montrose.
MnDOT thanks the public for their patience while we completed these improvements for you.
Howard Lake

2025 project complete
Summary of work
- Resurface Hwy 12 with a new asphalt road surface from west of 13th Ave. to east of Sixth Ave.
- Reconstruct or repair concrete curbs, gutters and entrances
- Improve and update pedestrian access:
- Reconstruct segments of sidewalks and ramp approaches between 13th Ave. and Sixth Ave.
- Reconstruct and widen the sidewalk in a two block area in the downtown district between Ninth Ave. and Seventh Ave.
- Update pedestrian crosswalk signal systems
Project home
Waverly

2025 project complete
A rectangular rapid flashing beacon warns motorists that pedestrians are within the crosswalk
Summary of work
- Resurface Hwy 12 with a new asphalt road surface from west of Summerfield Dr. to First St. S
- Reconstruct or repair concrete curbs, gutters and side entries
- Improve and update pedestrian access:
- Repair or add new sidewalk, includes bump outs
- Update pedestrian crosswalk signal systems at the intersections of:
- Hwy 12 and Co. Rd. 8 SW
- Hwy 12 and Fourth St. S/Co. Rd. 62
Project home
Montrose
Hwy 12 work zone from east of Clementa Ave. to east of Zephyr Ave., Wright County.

Summary of work
- Resurface Hwy 12 with a new asphalt surface from east of Clementa Ave. to east of Zephyr Ave. in Montrose
- Reconstruct or repair concrete curbs, gutters and entrances
- Add a center turn lane at Zephyr Ave. and Arizona Ave. in east Montrose to improve access.
- Reconstruct the Hwy 12 intersection at Hwy 25 and Wright Co. Rd. 12/Buffalo Ave. S, to improve the truck turning radius and pedestrian crosswalk
Project home