Hwy 23—Milaca to Ogilvie

Mille Lacs and Kanabec counties

About this 2024 project

MnDOT will resurface and improve 12 miles of Hwy 23 from Milaca to east of Ogilvie. Project will require detours

Summary of work

  • Resurface (asphalt) road and shoulders
  • Update access:
    • Realign 100th Ave./Mille Lacs Co. Rd. 101 east of Milaca and install left turn lanes on Hwy 23
    • Install left turn lanes on Hwy 23 at 90th Ave./Mille Lacs Co. Rd. 144
  • Replace three drainage structures:
    • Pipe between 78th Ave. and 165th St., west of Bock
    • Box bridge east of Cable St./Kanabec Co. Rd. 52, east of Bock
    • Box bridge at South Fork Groundhouse River between 50th Ave. and Bear St., east of Bock
Hwy 23 Milaca to Ogilvie project map
2024 roadwork on Hwy 23 between Milaca and Ogilvie. Select map to enlarge

Future impacts

Work will be done in segments along this 12-mile stretch of Hwy 23 from Milaca to Ogilvie

Traffic plans

Hwy 23 tentative traffic plan map - detours
Hwy 23 traffic plan map. Select image to enlarge

Overall motorists will encounter:

  • Periodic lane or shoulder closures
  • Reduced work zone speed limit
  • Detours to replace drainage structures:
  • Access will be open to those who live, work or visit those along the work zone; however, expect changes and use of alternate accesses

More details once contractor is on board