I-94 Gap—Albertville to Monticello

Wright County

About this project

MnDOT Improved and expanded I-94 to six lanes, three in each direction, to close the gap between Albertville and Monticello, Wright County. All lanes opened to traffic on Nov. 19, 2026.

Project location map on I-94 Albertville to Monticello
I-94 Albertville to Monticello work zone. Select image to enlarge

Achievements

  • Reconstruct the road surface
  • Add a third westbound lane from Co. Rd. 37 in Albertville to west of Hwy 25 in Monticello
  • Add a third eastbound lane from west of Hwy 25 in Monticello to Co. Rd. 19 in Albertville
  • Replace the westbound bridge over Wright Co. Rd. 19 in Albertville
  • Widen the westbound bridge over Co. Rd. 75 in Monticello
  • Replace or repair underground pipes
  • Install two noise walls along I-94 in the Monticello area
    • South side of EB I-94 east of Wright Co. Rd. 18/Fenning Ave
    • North side of WB I-94, east of Broadway St.

Project minute

Watch a quick clip to learn about this future I-94 project between Albertville and Monticello.


Source: MnDOT Vimeo Channel

MnDOT Materials and Road Research facility (MnROAD)

Westbound I-94 traffic is now using the new permanent three-lane roadway between Albertville and Monticello. In the future, MnROAD will use the former westbound I-94 lanes to study how pavement performs under heavy truck traffic.

During testing, truck drivers will be directed onto the MnROAD test section and then back onto the mainline roadway after the test area. Signs and gates will guide drivers when testing is underway.

Learn more about MnROAD research, test sections and facility.

Schedule is subject to change.