Minnesota Department of Transportation

511 Travel Info

Hwy 6—Remer

Cass County

Reconstruct

MnDOT will reconstruct or improve Hwy 6 (Main St. or Hwy 200) from the east and west intersections of Hwy 6 and Hwy 200, through Remer, Cass County, in 2022.

Summary of 2022 work

  • Reconstruct Hwy 6 between Etna Ave. and Third Ave E., includes reconfigured design:
    • One-lane in each direction, a center turn-lane, side street parking on both sides and a grass boulevard along the sidewalk
  • Resurface (asphalt) from the east and west intersections of Hwy 6 and Hwy 200
  • Improve or repair pedestrian sidewalks and road approaches
  • Update overhead street lighting
  • Replace or repair storm sewer, curb, gutter and ditch drainage
Hwy 6 project map in Remer
Roadwork on Hwy 6 in Remer in 2022. Click map for PDF

Future impacts

Hwy 6 will be an active work zone through Remer in 2022. Follow construction signs when navigating through town. Plan to encounter flaggers, equipment, workers and closed off areas to work beneath the road or sidewalk.

Motorists: Road open, however, expect periodic lane closures, lane shifts, flaggers and changes to access. Oversize overweight restrictions, more to come once closer to construction.

Pedestrians: Sidewalks to be open on one side of the road as crews close and work on the other side. Watch for signs and expect changes.

Remer open: Access will be maintained and open to businesses, visitors and residents along Hwy 6, however expect changes like gravel surfaces and use of alternate accesses.