Minnesota Department of Transportation

511 Travel Info

Lift Bridge

St. Croix river crossing between Stillwater, MN, and Houlton, WI

Stillwater Lift Bridge lift schedule

Stillwater Lift Bridge lift schedule
Stillwater Lift Bridge lift schedule
Click for larger version

2024 schedule

The 2024 lift bridge schedule began on Wed, May 15. The lift schedule will be in use through mid to late-October.

  • The lift schedule is in effect roughly from early May through late October each year. During the lift season, the lift bridge is staffed from 8 a.m. to 12 midnight daily. The bridge will lift on the schedule shown in the graphic if boat traffic is present.
  • MnDOT will respond to special openings after 12 midnight with a two-hour notice. Requests are to be made by calling MnDOT’s 24-hour Dispatch at 651-234-7110. Any requests received by marine band radio will be relayed by the bridge tender to the dispatcher.
  • Outside of the regular lift season (late October to early May), the bridge will be raised with a 24-hour notice. Requests may be made by calling 651-234-7110.
  • During the period when the bridge is staffed, bridge tenders will monitor marine band radio Channel 16. After receiving a call on Channel 16, conversations will be switched to Channel 14.
  • Questions or complaints should be called in to 651-234-7110, during normal business hours.

Notes

The regular lift schedule (set by the U.S. Coast Guard) is in effect from May 15 to Oct. 15 each year. MnDOT may operate the lift bridge before and/or after these dates, if weather and resources permit. The bridge will be staffed full time from 8 a.m. to midnight daily.

Any requests received by marine radio will be relayed by the bridge tender to the dispatcher.

During periods of the day when the bridge is staffed, bridge tenders will monitor channel 16 on the marine band radio. Upon receiving a call on channel 16, conversations will be switched to channel 14.