About the project
Project Elements
• Pavement reconstruction
• Sidewalk reconstruction
• Storm sewer reconstruction
• Corridor lighting
• Utility improvements
• Tree/brush removal
Project Staging
Disclaimer: Staging information and detour routes are subject to change. Estimated durations and detours are as follows. Project staging and detour maps coming soon.
A truck detour will be used for the duration of the project. Truck traffic will detour onto Roseau County roads 4 and 23. Local traffic can use city streets to avoid the road closure.
Stage 1
Hwy 11 will be closed between the east side of 4th St to west side of Hwy 32 intersection (Approximately 5 weeks)
Work to be completed:
• Install storm sewer on Hwy 11
• Install storm sewer outlet to South Brantch Two Rivers
• Reconstruct Hwy 11
• Sidewalk reconstruction
• Install bases for corridor lighting
Stage 2
Hwy 11 will be closed between the west side of 7th St to the east side of 4th St (Approximately 7 weeks)
Work to be completed:
• Install storm sewer on Hwy 11
• Reconstruct Hwy 11
• Sidewalk reconstruction
• Install bases for corridor lighting
Stay Informed
Stay informed during the project by attending weekly construction meetings and sign up for email updates on the project website.
Nearby Projects
2025: Hwy 11/313 Warroad
2026: Hwy 11 Roseau to Warroad
2028: Hwy 89 Roseau
Work Zone Safety Tips
• Obey posted speed limits
• Drive undistracted
• Move over-Give workers room to safely complete their work.
• Know before you go: www.511mn.org
• Be patient.
• Do the zipper merge
• Avoid making unnecessary lane changes
• Never enter a road blocked with barriers or cones
• Expect work zones to constantly change