Visual layouts show future Hwy 210 segments—west, bridge, downtown, railyard, mall and east—when complete in 2027. Use drop-down menu to learn more.

Hwy 210—Baxter Dr. to NW 4th St.

  • Resurface road
  • Update concrete median
  • Update/widen sidewalk and road approaches
  • Update storm sewer
  • Replace signal at Baxter Dr.
  • Update access at NW 5th St.
  • New, wider sidewalks
  • Map of west segment location (PNG)
Hwy 210 design layout on top of aerial image Baxter Dr. to 4th St. NW
WEST visual layout on aerial image. Select image (PNG) to enlarge

Hwy 210—4th St. to east E River Rd.

  • Reconstruct road, includes entrances
  • Replace signal at Hwy 210 and NW 4th St.
  • Update Mississippi River bridge, includes bridge approaches
  • Install city watermain under Hwy 210
  • Install storm sewer outlets at the river
  • Reconstruct wider sidewalk
  • Location map of bridge segment (PNG)
Hwy 210 design layout on top of aerial image 4th St. NW to E River Rd.
BRIDGE visual layout on aerial image. Select image (PNG) to enlarge

Hwy 210—E River Rd. to Kingwood St.

  • Reconstruct road surface, includes entrances
  • Install concrete median to improve and modify Hwy 210 access at:
    • N 3rd St., N 5th St., N 7th St., N 9th St. and 10th St N.
  • Replace signal at Hwy 210 and 4th St.
  • Update signal at Hwy 210 and Hwy 371B/S 6th St.
  • Replace signal at Hwy 210 and 8th St.
  • Install city watermain under Hwy 210
  • Install storm sewer
  • Construct wider sidewalk
  • Location map of downtown segment (PNG)
Hwy 210 design layout on top of aerial image E River Rd. to near Kingwood St.
DOWNTOWN visual layout on aerial image. Select image (PNG) to enlarge

Hwy 210— Kingwood St. to 5th Ave. NE

  • Reconstruct road and adjacent entrances
  • Remove signal at Hwy 210 and 4th Ave. NE
  • Replace signal at Hwy 210 and 13th Ave. SE/Co. Rd. 45/Gillis Ave.
  • Install concrete median to improve and modify Hwy 210 access at:
    • 1st Ave. NE., 2nd Ave. NE. and 4th Ave. NE
  • Install city watermain beneath Hwy 210
  • Reconstruct wider sidewalk and road approaches
  • Location map railyard segment (PNG)
Hwy 210 railyard design layout on top of aerial image west of Kingwood St. to 5th Ave. NE
RAILYARD visual layout on aerial image. Select image (PNG) to enlarge

Hwy 210—5th Ave. NE to 10th Ave. NE

  • Reconstruct road, concrete medians and adjacent entrances
  • Construct two roundabouts and local accesses in between
    • Hwy 210 at Hwy 25 and C St. (four legs)
    • Hwy 210 at Mill Ave./Co. Rd. 3 (three legs)
  • Reconstruct Hwy 210 connections at Hwy 25 (C St./Hwy 210 roundabout) and 10th Ave. NE
  • Install city watermain underground along Hwy 210
  • Install sidewalks and Cuyuna Trail connections
  • Location map of mall segment (PNG)
Hwy 210 mall - roundabouts - design layout on top of aerial image 5th Ave. NE to 10th Ave. NE.
RAILYARD visual layout on aerial image. Select image (PNG) to enlarge

Hwy 210—10th Ave. NE to Pine Shores Rd.

  • Resurface road
  • Replace concrete median
  • Install or add sidewalk/Cuyuna Trail
  • Resurface, repair and update 14th Ave.NE/J St.access at Lum Park, includes underground drainage repairs
  • Location map of east segment (PNG)
Hwy 210 design layout on top of aerial image E River Rd. to west of Kingwood St.
EAST visual layout on aerial image. Select image (PNG) to enlarge

Note: Visual layouts are representative only. Information is subject to change. Aerial images will not match drawn lines perfectly. MnDOT March 2025.