About this project
Summary of work
- Resurface sections of the highway
- Make pavement joint repairs
- Repair deteriorated culvert sections
- Repair ditch along westbound Lor Ray Drive exit ramp
- Update pedestrian sidewalk ramps at 3rd Ave and Riverfront Drive interchanges
- Rehabilitate large culvert at Thompson Creek
- Update median guardrail at bridges
- Repair pavement approaches to bridges over the railroad near Eagle Lake
- Restripe road
There will be a separate construction project near Hwy 14/Hwy 169. For more information, visit the Hwy 169 project website.