Apparent bid results - design build
6-23-2026 best value letting
Apparent best value adjusted score results
Blatnik Bridge
Removal of Bridge #9030: Construction of Bridges #69913 and WI #B-16-0154, Construction of Ramps, Roundabouts, and Local Streets on TH 535, and TH 35 between Duluth and Superior, Wisconsin over the St. Louis River in St. Louis County, MN and Douglas County, WI.
| Bidder Name | Technical Proposal Score | Proposal Price | Adjusted Score (Price / Technical Score) | |
|---|---|---|---|---|
Ames Kraemer Joint Venture II |
91.38 |
$ 929,725,000.00 |
10,174,272 |
|
Lunda Construction Company |
93.20 |
$ 1,397,772,000.000 |
14,997,554 |
4-15-2026 best value letting
Apparent best value adjusted score results
University Avenue and 4th Street at 35W
Replace University Ave. Bridge #27882 (#27W54) and 4th ST SE Bridge #27883 (#27W57).
Reconstruct ramps and frontage/local roads, construct separated bike lanes, signal, ADA improvements, and sidewalks.
| Bidder Name | Technical Proposal Score | Proposal Price | Adjusted Score (Price / Technical Score) | |
|---|---|---|---|---|
Ames Construction, Inc. |
97.37 |
$ 56,130,000.00 |
576,461 |
|
C.S. McCrossan Construction, Inc. |
93.88 |
$ 53,925,500.00 |
574,409 |
|
New Valley Joint Venture |
88.09 |
$ 63,089,000.00 |
716,188 |
Apparent Best-Value = Lowest Adjusted Score.
