Bridge Details Manual Part II
Bridge Details Manual Part II | Updated | |||
---|---|---|---|---|
Download entire manual (PDF 14 MB) (please note: due to this file's size, we advise viewing it in Google Chrome) |
February 2022 | |||
Wire Fence on Concrete Parapet | DGN | Approved | Revised/Log | |
Wire Fence (Design W-1) and Concrete Parapet (Type P-1) | 7.119 | 7.119 | Jan. 5, 2017 | Feb. 8, 2022 |
Single Slope Barrier Type S | DGN | Approved | Revised/Log | |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (Without Concrete Wearing Course) | 7.138(A) | 7.138(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) | 7.138(B) | 7.138(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) | 7.138(C) | 7.138(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) | 7.138(D) | 7.138(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) No Approach Panel | 7.138(E) | 7.138(E) | May 10, 2017 | Feb. 8, 2022 |
Concrete Barrier 36” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (Without Concrete Wearing Course) | 7.139(A) | 7.139(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 36” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) | 7.139(B) | 7.139(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 36” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) | 7.139(C) | 7.139(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 36” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) | 7.139(D) | 7.139(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (Without Concrete Wearing Course) | 7.140(A) | 7.140(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) | 7.140(B) | 7.140(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) | 7.140(C) | 7.140(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) | 7.140(D) | 7.140(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 42” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (Without Concrete Wearing Course) | 7.141(A) | 7.141(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 42” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) | 7.141(B) | 7.141(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 42” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) | 7.141(C) | 7.141(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 42” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) | 7.141(D) | 7.141(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (Without Concrete Wearing Course) | 7.142(A) | 7.142(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) | 7.142(B) | 7.142(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) | 7.142(C) | 7.142(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) | 7.142(D) | 7.142(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 54” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (Without Concrete Wearing Course) | 7.143(A) | 7.143(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 54” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) | 7.143(B) | 7.143(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 54” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) | 7.143(C) | 7.143(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Concrete Barrier 54” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) | 7.143(D) | 7.143(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Single Slope Split Median Barrier Type S | DGN | Approved | Revised/Log | |
Split Median Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) | 7.144(A) | 7.144(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) | 7.144(B) | 7.144(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 36” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) | 7.144(C) | 7.144(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 36” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) | 7.144(D) | 7.144(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) | 7.145(A) | 7.145(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) | 7.145(B) | 7.145(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 42” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) | 7.145(C) | 7.145(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 42” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) | 7.145(D) | 7.145(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) | 7.146(A) | 7.146(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) | 7.146(B) | 7.146(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 54” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) | 7.146(C) | 7.146(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Split Median Barrier 54” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) | 7.146(D) | 7.146(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Single Slope Solid Median Barrier Type S | DGN | Approved | Revised/Log | |
Solid Median Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) | 7.147(A) | 7.147(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) | 7.147(B) | 7.147(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 36” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) | 7.147(C) | 7.147(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 36” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) | 7.147(D) | 7.147(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) | 7.148(A) | 7.148(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) | 7.148(B) | 7.148(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 42” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) | 7.148(C) | 7.148(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 42” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) | 7.148(D) | 7.148(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) | 7.149(A) | 7.149(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) | 7.149(B) | 7.149(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 54” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) | 7.149(C) | 7.149(C) | Aug. 24, 2016 | Feb. 8, 2022 |
Solid Median Barrier 54” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) | 7.149(D) | 7.149(D) | Aug. 24, 2016 | Feb. 8, 2022 |
Metal Railing for Bikeways | DGN | Approved | Revised/Log | |
Metal Railing (Type M-1) for Bikeways on Concrete Parapet (Type P-1) Integral or Semi-Integral Abutment (Without Guardrail Connection) | 7.154(A) | 7.154(A) | Dec. 2, 2015 | Feb. 8, 2022 |
Metal Railing (Type M-1) for Bikeways on Concrete Parapet (Type P-1) Integral or Semi-Integral Abutment (With Guardrail Connection) | 7.154(B) | 7.154(B) | Dec. 2, 2020 | Feb. 8, 2022 |
Metal Railing (Type M-1) for Bikeways on Concrete Parapet (Type P-1) Parapet Abutment (Without Guardrail Connection) | 7.154(C) | 7.154(C) | Feb. 8, 2022 | Feb. 8, 2022 |
Metal Railing (Type M-1) for Bikeways on Concrete Parapet (Type P-1) Parapet Abutment (with Guardrail Connection) | 7.154(D) | 7.154(D) | Feb. 8, 2022 | Feb. 8, 2022 |
Structural Tube Railing Design T-1 and Concrete Parapet (Type P-2, TL-4) | DGN | Approved | Revised/Log | |
Integral or Semi-Integral Abutment with Guardrail Connection (Without Concrete Wearing Course) | 7.157(A) | 7.157(A) | April 9, 2020 | Feb. 8, 2022 |
Integral or Semi-Integral Abutment with Guardrail Connection (With 2” Concrete Wearing Course) | 7.157(B) | 7.157(B) | April 9, 2020 | Feb. 8, 2022 |
Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) | 7.157(C) | 7.157(C) | April 9, 2020 | Feb. 8, 2022 |
Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2” Concrete Wearing Course) | 7.157(D) | 7.157(D) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment with Guardrail Connection (Without Concrete Wearing Course) | 7.157(E) | 7.157(E) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment with Guardrail Connection (With 2” Concrete Wearing Course) | 7.157(F) | 7.157(F) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) | 7.157(G) | 7.157(G) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2” Concrete Wearing Course) | 7.157(H) | 7.157(H) | April 9, 2020 | Feb. 8, 2022 |
Structural Tube Railing (Design T-2) | DGN | Approved | Revised/Log | |
for Concrete Type J or F Barrier | 7.158(A) | 7.158(A) | April 21, 2021 | Feb. 8, 2022 |
for 36” Concrete Type S Barrier | 7.158(B) | 7.158(B) | April 21, 2021 | Feb. 8, 2022 |
Ornamental Metal Railing with Fence | DGN | Approved | Revised/Log | |
Design T-3 Parapet Mount Integral or Semi-Integral Abutment (without Guardrail Connection) | 7.160(A) | 7.160(A) | Nov. 6, 2013 | Feb. 8, 2022 |
Design T-3 Parapet Mount Integral or Semi-Integral Abutment (with Guardrail Connection) | 7.160(B) | 7.160(B) | Dec. 2, 2020 | Feb. 8, 2022 |
Design T-3 Parapet Mount Parapet Abutment (without Guardrail Connection) | 7.160(C) | 7.160(C) | Feb. 8, 2022 | Feb. 8, 2022 |
Design T-3 Parapet Mount Parapet Abutment (with Guardrail Connection) | 7.160(D) | 7.160(D) | Feb. 8, 2022 | Feb. 8, 2022 |
Design T-3 Curb Mount Integral or Semi-Integral Abutment | 7.161(A) | 7.161(A) | Nov. 6, 2013 | Feb. 8, 2022 |
Design T-3 Curb Mount Parapet Abutment | 7.161(B) | 7.161(B) | Feb. 8, 2022 | Feb. 8, 2022 |
Ornamental Metal Railing | DGN | Approved | Revised/Log | |
Ornamental Metal Railing Design T-4 Parapet Mount Integral or Semi-Integral Abutment (without Guardrail Connection) | 7.162(A) | 7.162(A) | Nov. 6, 2013 | Feb. 8, 2022 |
Ornamental Metal Railing Design T-4 Parapet Mount Integral or Semi-Integral Abutment (with Guardrail Connection) | 7.162(B) | 7.162(B) | Dec. 2, 2020 | Feb. 8, 2022 |
Ornamental Metal Railing Design T-4 Parapet Mount Parapet Abutment (without Guardrail Connection) | 7.162(C) | 7.162(C) | Feb. 8, 2022 | Feb. 8, 2022 |
Ornamental Metal Railing Design T-4 Parapet Mount Parapet Abutment (with Guardrail Connection) | 7.162(D) | 7.162(D) | Feb. 8, 2022 | Feb. 8, 2022 |
Design T-4 Curb Mount Integral or Semi-Integral Abutment | 7.163(A) | 7.163(A) | Nov. 6, 2013 | Feb. 8, 2022 |
Design T-4 Curb Mount Parapet Abutment | 7.163(B) | 7.163(B) | Feb. 8, 2022 | Feb. 8, 2022 |
Design T-5 Parapet Mount Integral or Semi-Integral Abutment (without Guardrail Connection) | 7.164(A) | 7.164(A) | Feb. 22, 2018 | Feb. 8, 2022 |
Design T-5 Parapet Mount Integral or Semi-Integral Abutment (with Guardrail Connection) | 7.164(B) | 7.164(B) | Dec. 2, 2020 | Feb. 8, 2022 |
Design T-5 Parapet Mount Parapet Abutment (without Guardrail Connection) | 7.164(C) | 7.164(C) | Feb. 8, 2018 | Feb. 8, 2022 |
Design T-5 Parapet Mount Parapet Abutment (with Guardrail Connection) | 7.164(D) | 7.164(D) | Feb. 8, 2022 | Feb. 8, 2022 |
Design T-5 Curb Mount Integral or Semi-Integral Abutment | 7.165(A) | 7.165(A) | Feb. 22, 2018 | Feb. 8, 2022 |
Design T-5 Curb Mount Parapet Abutment | 7.165(B) | 7.165(B) | Feb. 8, 2022 | Feb. 8, 2022 |
Concrete Parapet (Type P-1, TL-2) | DGN | Approved | Revised/Log | |
Integral or Semi-Integral Abutment (Without Concrete Wearing Course) With Raised Sidewalk | 7.166(A) | 7.166(A) | April 9, 2020 | Feb. 8, 2022 |
Integral or Semi-Integral Abutment (Without Concrete Wearing Course) | 7.166(B) | 7.166(B) | April 9, 2020 | Feb. 8, 2022 |
Integral or Semi-Integral Abutment (With 2” Concrete Wearing Course) With Raised Sidewalk | 7.166(C) | 7.166(C) | April 9, 2020 | Feb. 8, 2022 |
Integral or Semi-Integral Abutment (With 2” Concrete Wearing Course) | 7.166(D) | 7.166(D) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment (Without Concrete Wearing Course) With Raised Sidewalk | 7.166(E) | 7.166(E) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment (Without Concrete Wearing Course) | 7.166(F) | 7.166(F) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment (With 2” Concrete Wearing Course) With Raised Sidewalk | 7.166(G) | 7.166(G) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment (With 2” Concrete Wearing Course) | 7.166(H) | 7.166(H) | April 9, 2020 | Feb. 8, 2022 |
Concrete Curb | DGN | Approved | Revised/Log | |
For Use with Ornamental Railing | 7.167 | 7.167 | Nov. 6, 2013 | Feb. 8, 2022 |
Concrete Barrier (Type P-4, TL-4) | DGN | Approved | Revised/Log | |
Integral or Semi-Integral Abutment (Without Concrete Wearing Course) | 7.173(A) | 7.173(A) | April 9, 2020 | Feb. 8, 2022 |
Integral or Semi-Integral Abutment (With 2” Concrete Wearing Course) | 7.173(B) | 7.173(B) | April 9, 2020 | Feb. 8, 2022 |
Parapet Abutment (Without Concrete Wearing Course) | 7.173(C) | 7.173(C) | April 9, 2020 | Feb. 8, 2022 |
Parapet (With 2” Concrete Wearing Course) | 7.173(D) | 7.173(D) | April 9, 2020 | Feb. 8, 2022 |
Glulam Timber Rail | DGN | Approved | Revised/Log | |
TL-2 Glulam Timber Rail (For Timber Slabs) | 7.175 | 7.175 | April 21, 2021 | April 21, 2021 |
TL-4 Glulam Timber Rail (For Timber Slabs) | 7.176 | 7.176 | April 21, 2021 | April 21, 2021 |
Wire Fence For Pedestrian Bridges and Walkways | DGN | Approved | Revised/Log | |
5 Ft. Wire Fence Design W-1 For Pedestrian Bridges | 7.202 | 7.202 | Jan. 5, 2017 | Dec, 2, 2020 |
8 Ft. Wire Fence for Pedestrian Walks | 7.205 | 7.205 | Jan. 5, 2017 | Dec. 2, 2020 |
Grouted Injected Fabric Formed Slope Paving | DGN | Approved | Revised/Log | |
Grouted Injected Fabric Formed Slope Paving | 7.300 | 7.300 | Jan. 5, 2017 | Jan. 5, 2017 |
Concrete Slope Paving Under Bridges | DGN | Approved | Revised/Log | |
Concrete Slope Paving Under Bridges | 7.301 | 7.301 | Sept. 26, 2003 | Nov. 8, 2018 |
Riprap and Stabilized Aggregate Slope Paving Under Bridges | DGN | Approved | Revised/Log | |
Stabilized Aggregate Slope Paving Under Bridges | 7.302 | 7.302 | Sep. 26, 2003 | Sept. 11, 2014 |
Riprap Slope with Geotextile (Slopes 1:2 and Flatter) | 7.309 | 7.309 | May 24, 2011 | Feb. 8, 2022 |
Conduit System For -- | DGN | Approved | Revised/Log | |
Conduit System For -- | 7.402 | 7.402 | Sep. 26, 2003 | May 24, 2012 |
Conduit System Lighting | DGN | Approved | Revised/Log | |
Type S Concrete Barrier Blister, With or Without Wearing Course | 7.406(B) | 7.406(B) | Aug. 24, 2016 | Aug. 24, 2016 |
Prestressed Concrete Beams | DGN | Approved | Revised/Log | |
30MH Prestressed Concrete Beam (Pretensioned) 30MH- | 7.501 | 7.501 | Dec. 20, 2018 | Feb. 8, 2022 |
35MH Prestressed Concrete Beam (Pretensioned) 35MH- | 7.502 | 7.502 | Dec. 20, 2018 | Feb. 8, 2022 |
40MH Prestressed Concrete Beam (Pretensioned) 40MH- | 7.503 | 7.503 | Dec. 20, 2018 | Feb. 8, 2022 |
27" Prestressed Concrete Beam (Pretensioned) 27M | 7.504 | 7.504 | Jan. 13, 2015 | Feb. 8, 2022 |
36" Prestressed Concrete Beam (Pretensioned) 36M | 7.505 | 7.505 | Jan. 13, 2015 | Feb. 8, 2022 |
MN45" Prestressed Concrete Beam (Pretensioned) MN45 | 7.507 | 7.507 | Jan. 13, 2015 | Feb. 8, 2022 |
MN54" Prestressed Concrete Beam (Pretensioned) MN54 | 7.508 | 7.508 | Jan. 13, 2015 | Feb. 8, 2022 |
MN63" Prestressed Concrete Beam (Pretensioned) MN63 | 7.509 | 7.509 | Jan. 13, 2015 | Feb. 8, 2022 |
82MW Prestressed Concrete Beam (Pretensioned) 82MW- | 7.531 | 7.531 | Jan. 13, 2015 | Feb. 8, 2022 |
96MW Prestressed Concrete Beam (Pretensioned) 96MW- | 7.532 | 7.532 | Jan. 13, 2015 | Feb. 8, 2022 |
14", 18" and 22" Rectangular Prestressed Concrete Beam (Pretensioned) RB | 7.550 | 7.550 | Jan. 13, 2015 | Feb. 8, 2022 |
Waterproof Expansion Device | DGN | Approved | Revised/Log | |
With Type F Barrier | 7.627(A) | 7.627(A) | Aug. 24, 2016 | Feb. 8, 2022 |
With Type S Barrier | 7.627(B) | 7.627(B) | Aug. 24, 2016 | Feb. 8, 2022 |
For Concrete Parapet | 7.627(C) | 7.627(C) | Feb. 8, 2022 | Feb. 8, 2022 |
Snow Plow Protection (Use On Skews Over 15 Degrees and Less Than 50 Degrees) | 7.628 | 7.628 | Sep. 26, 2003 | Nov. 6, 2013 |
Raised Median Or Sidewalk with F Barrier and Parapet | 7.630(A) | 7.630(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Raised Median Or Sidewalk with S Barrier and Parapet | 7.630(B) | 7.630(B) | Aug. 24, 2016 | Feb. 8, 2022 |
Raised Median or Integral Sidewalk with F Barrier and Curb | 7.632(A) | 7.632(A) | Aug. 24, 2016 | Feb. 8, 2022 |
Raised Median or Integral Sidewalk with S Barrier and Curb | 7.632(B) | 7.632(B) | Aug. 24, 2016 | Feb. 8, 2022 |
As-Built Bridge Data | DGN | Approved | Revised/Log | |
As-Built Bridge Data | 7.900 | 7.900 | May 10, 2017 | May 10, 2017 |