About this 2024 project
MnDOT will resurface and improve Hwy 115 from east of Hwy 10 in Randall to the Mississippi River bridge east of Morrison Co. Rd 213. The project will require a detour to replace pipes.

Summary of work
- Resurface road from Hwy 10 to the east entrance of Camp Ripley
- Upgrade pedestrian sidewalks at Camp Ripley’s main entrance at Co. Rd. 213 (Grouse Rd.)
- Replace four pipes
- Upgrade guardrail
Project impacts
- Detour: Hwy 10 Randall and Morrison Co. Rd. 76 (Haven Rd.) Little Falls