Minnesota Department of Transportation

511 Travel Info

Hwy 65 — Mora

Kanabec County

Background

MnDOT completed a Hwy 65 and Hwy 23 Mora corridor study in June 2024. Watch this video that summarizes what was accomplished and what to expect on this future Hwy 65 construction project.

June 2024 - Video (YouTube) highlights work completed during the Hwy 65 and Hwy 23 corridor study in Mora.

Download Hwy 65/23 layout from the 2024 Corridor Study.

Recommended core Mora layout from Union St. to Mora Lake. Image (PNG) Document (PDF)

Image of the roundabout draft layout at Hwy 23, Hwy 95 and Dala Ln

Recommended roundabout layout at Hwy 23, Hwy 65 and Dala Ln. in south Mora. Image (PNG) Document, page 2 (PDF)