Project details
![Project map for Highway 75 Mustinka River bridge replacement and resurfacing from the bridge to Fifth Street in Wheaton](/d4/projects/hwy75mustinka/documents/hwy75-mustinkariver.jpg)
In 2020, the Minnesota Department of Transportation replaced the bridge over the Mustinka River, north of Wheaton. In addition to the bridge replacement, crews resurfaced Highway 75 from Fifth Avenue in Wheaton to the bridge site.
Key project elements
- Replace bridge over Mustinka River
- Resurface from Fifth Avenue in Wheaton to the bridge
Current traffic impacts
- Road reopened Oct. 13