About this project
Summary of work
- Pavement Improvements throughout the 17-mile corridor
- Reclaim pavement and resurface
- Reconstruction through Madison Lake
- Americans with Disabilities Act (ADA)
- Update pedestrian ramps to meet ADA requirements
- Remove and replace sections of poor sidewalk and curb & gutter
- Turn lanes & access modifications
- County Road lighting
- Upgrade infrastructure in Madison Lake
Traffic Impacts
This project will be done in two stages during 2021 construction. Each stage has its own detour, which can be viewed on an interactive map Hwy 60 Lake Connection Detour Routes, as well as the Phase 1 and Phase 2 detour maps below.