A significant pavement fix for I-90 from the South Dakota border to east of Beaver Creek is planned for 2022 construction.
Summary of work
- Concrete pavement overlay on the eastbound and westbound lanes from the South Dakota border to Rock County Road 6 at Beaver Creek
- Concrete pavement overlay on the westbound lanes from CR 6 to CR 11 (just east of Beaver Creek)
- Reconstruct shoulders
- Extend outside ramp shoulders for truck parking
- Repair guardrail
- Improve drainage by cleaning, repairing, or replacing pipes and culverts
Traffic impacts
- Traffic will utilize crossovers to a head-to-head configuration during construction (head-to-head in westbound lanes during eastbound work; head-to-head in eastbound lanes during westbound work)
- CR 6 ramps will remain open to I-90 traffic
- The maps below provide specifics as it relates to wayfinding for Valley Springs, Manley, and Beaver Creek during different stages of construction