Sequence |
Title |
When used |
1 |
Title Sheet (No standard file – project specific) |
All |
2 |
To the Commissioner of Transportation of the State of Minnesota (PDF) |
All |
3 |
Notice to all Bidders – Bid Rigging (PDF) |
Federal |
4 |
MnDOT Notice to Bidders: Suspension/Debarments (PDF) |
All |
5 |
State Funded Only Construction Contracts – Special Provisions Division A - Labor (PDF) |
State Only |
6 |
Federally and State Funded Construction Contracts - Special Provisions Division A - Labor (PDF) |
Federal and State |
7 |
Federally Funded Only Construction Contracts – Special Provisions Division A - Labor (PDF) |
Federal Only |
8 |
Notice to Bidders Traffic Control Prevailing Wage Coverage (PDF) |
Federal |
9 |
Federal Wage Rates (Highway; Heavy; Building) |
Federal |
10 |
State Wage Rates (Highway and Heavy; Commercial) |
All |
11 |
Notice of Truck Rental Rate Certification and Effective Date |
All |
12 |
Notice to Bidders Work Under the Contract (PDF) |
All |
14 |
Division S |
All |
NA |
Division SB |
If required |
NA |
Division SL |
If required |
NA |
Division SS |
If required |
NA |
Division ST |
If required |
NA |
Division SZ |
If required |
NA |
Other Division Special Provisions |
If required |
15 |
(1803) Project Schedules (PDF) |
All |
16 |
(1910) Fuel Escalation Clause (PDF) |
All |
17 |
Conversion Table for MnDOT Rolled Erosion Prevention Products (PDF) |
Use only with SP2018 if required |
18 |
Blanding’s Turtles Fact Sheet (PDF) |
Use only with SP2018 if required |
19 |
Blanding’s Turtle Flyer (PDF) |
Use only with SP2018 if required |
20 |
NOTIFICATION FORM ON OWNERSHIP TRANSFER OF MATERIALS WITH LEAD-BASED PAINT (Word) |
If required |
21 |
Demolition Debris Recycling Form (Word) |
If required |
22 |
Schedule of Materials Control 2018 |
Projects using the 2018 Standard Specifications |
23 |
Schedule of Materials Control 2020 (PDF) |
Projects using the 2020 Standard Specifications let before July 28, 2023 |
24 |
Schedule of Materials Control 2023 Version (PDF) |
Projects using the 2020 Standard Specifications let on or after July 28, 2023 |
25 |
Disadvantaged Business Enterprise (DBE) Special Provisions (PDF) |
Federal |
26 |
Targeted Group Business (TGB) and Veteran-Owned Small Business (VET) Special Provisions (PDF) |
State |
27 |
Required Contract Provisions Federal-Aid Construction Contracts (FHWA-1273) (PDF)
|
Federal |
28 |
Equal Employment Opportunity (EEO) State and Federal Laws, Policy and Rules (PDF)
|
All |
29 |
Notice to Bidders - Bid Schedule |
All |
30 |
Stipulation for Iron or Steel Materials (PDF) |
Federal
Use only with SP2018 if required |
31 |
Bid Schedule (No Standard File - project specific) |
All |
32 |
MnDOT Proposal Bond (PDF) |
All |
33 |
Construction Plan (No standard file – project specific) |
All |