I-94

Minneapolis

This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.

Traffic impacts

-94 between East River Pkwy./Franklin Ave. and just west of Hwy 55/Hiawatha Ave./I-35W project area map.

I-94 in Minneapolis project area map

View full-size map

All traffic impacts are tentative and weather dependent.

Upcoming

Information about upcoming traffic impacts will be posted as details become available. Motorists can expect lane and ramp closures on I-94 between downtown Minneapolis and the Franklin Ave. bridge over I-94.

Lane closures

5 a.m. Mon, Oct. 28 through Fri, Nov. 29
  • I-94 is reduced to two lanes in both directions between 11th Ave. S. and Franklin Ave. S.E.

Ramp closures

5 a.m. Mon, Oct. 28 through Fri, Nov. 29

About this project

We will be doing maintenance and repair work on five bridges along I-94 in Minneapolis. These bridges include:

  • I-94 bridge (Dartmouth Bridge) that spans the Mississippi River
  • Riverside Ave. bridge over I-94
  • I-94 over Cedar Ave.
  • I-94 over the Light Rail Transit (Blue Line)
  • I-94 over Hwy 55/Hiawatha Ave.

Summary of work

  • Construct temporary crossovers
  • Repair bridge decks
  • Resurface bridge pavement
  • Remove and replace bridge joints
  • Update guardrails
  • Upgrade drainage
  • Repaint bridge steel