Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.

Last updated December 2024

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
81 Hwy 108 Resurface  highway 108 from county road 41 to highway 78 $6,898,499 2031 5623-40
93 Hwy 27 Medium mill and overlay from 3rd St to I-94  $9,300,000 Not Selected District disagrees with RQI predictions
83 Hwy 114 Resurface highway 114 from highway 55 to interstate 94 $3,499,995 2027 2110-11
82 Hwy 28 Resurface from state line to highway 7 $3,797,023 2032 0604-24 Not a district priority, will continue to monitor pavement performance
81 Hwy 108 From east of Pelican Rapids to Hwy 78 $6,315,744 2030 5623-38
80 Hwy 32 Thin mill and overlay from US10 to Clay/Norman County Line  $6,400,000 Not Selected District disagrees with RQI predictions
80 Hwy 9 Medium mill and overlay from Chippewa River bridge to Stevens County Road 22  $12,000,000 Not Selected Disagree with RQI trends, will continue to monitor pavement condition
79 Hwy 113 Hwy 113 from county road 4 to highway 71 $12,230,205 2032 0307-100
79 Hwy 27 Medium mill and overlay from Grant County road 11 to Hwy 55  $8,400,000 Not Selected District disagrees with RQI predictions
79 US75 Thin mill and overlay from 2nd Ave to Clay/Norman County Line  $6,500,000 Not Selected District disagrees with RQI predictions
78 Hwy 108 Resurface from the south jct of Hwy 78 to 4th Street in Henning. $5,418,079 2029 5624-19
78 Hwy 210 Resurface from Hwy 29 to west of Hwy 71 $4,605,924 2026 5604-09
77 Hwy 78 Thin mill and overlay from I-94 to Hwy 210  $7,100,000 Not Selected District disagrees with RQI predictions
77 Hwy 9 Resurface from Hwy 210 to 6th Street in Barnesville $10,621,308 2029 8409-26
76 Hwy 7 Resurface and improve drainage on Hwy 7 near Ortonville $6,225,000 2030 0609-33
76 Hwy 9 Thin mill and overlay from US10 to Clay/Norman County Line  $6,400,000 Not Selected District disagrees with RQI predictions
76 US75 Thin mill and overlay from 46th Ave S to 30th Ave  $900,000 Not Selected District disagrees with RQI predictions
75 Hwy 34 Medium mill and overlay from Hwy 9 to US59  $9,700,000 Not Selected District disagrees with RQI predictions
75 US75 Medium mill and overlay from Hwy 210 to 220th St  $6,800,000 Not Selected District disagrees with RQI predictions
74 Hwy 27 Resurface from hwy 28 to county road 6 $6,798,945 2029 7802-37
74 US75 Resurface from Mustinka River Bridge to railroad crossing north of highway 55 $6,500,002 2027 7806-32
73 Hwy 113 Resurface from highway 59 to county highway 4 $5,646,138 2034 4405-35 District disagrees with RQI predictions
73 US75 Hwy 75 from Hwy 12 to Hwy 28 in Graceville $7,846,171 2030 0608-40
73 US75 Medium mill and overlay from Hwy 55 to Hwy 28  $4,900,000 Not Selected NA
73 US75 Medium mill and overlay from Hwy 9 to Beede Ave  $3,800,000 Not Selected District disagrees with RQI predictions
72 Hwy 78 Resurface on 78, from Wagon Trail to county road 54 $8,167,053 2031 5620-26
71 Hwy 114 Medium mill and overlay from 8th St to Hwy 55  $2,400,000 Not Selected Small Segment Of Larger Project
70 Hwy 27 Medium mill and overlay from Hwy 75 to Grant County Road 7  $7,300,000 Not Selected Small Segment Of Larger Project
70 Hwy 55 Medium mill and overlay from Church St to US59  $2,500,000 Not Selected NA
70 Hwy 7 Medium mill and overlay from 1.57 miles south of Big Stone County Road 68 to Pacific Ave   $5,500,000 Not Selected NA
68 Hwy 7 Medium mill and overlay from Big Stone County Road 68 to Pacific Ave  $700,000 Not Selected NA
68 US75 RESURFACE US 75, FROM 0.1 MILES NORTH OF CSAH12 TO 1.3 MILES NORTH OF CSAH 12 $1,620,134 2026 1406-79
67 Hwy 29 Medium mill and overlay from Hwy 40 to Chippewa/Swift County Line  $1,600,000 Not Selected NA
67 Hwy 9 Medium mill and overlay from Hwy 55 to Hwy 75  $6,600,000 Not Selected NA
66 Hwy 117 Resurface from sd Border to Highway 27 $831,161 2033 7807-11
66 Hwy 87 Medium mill and overlay from Becker/Wadena County Line to US71  $1,700,000 Not Selected NA
65 Hwy 114 Resurface Hwy 114 from Starbuck to Lowry; includes reconstruction and ADA in Lowry $5,080,084 2025 6111-26
64 US75 Medium mill and overlay from Hwy 28 to Traverse County Road 11  $3,900,000 Not Selected NA
61 Hwy 329 Medium mill and overlay from US59 to eastern boundary of U of M experiment station  $600,000 Not Selected NA
61 US75 Medium mill and overlay within the Clay County Road 12 roundabout  $200,000 Not Selected NA
60 Hwy 29 Resurface highway 29 from highway 210 to highway 71 $9,685,326 2033 5610-15
52 US75 Resurface from Breckenridge to Doran $7,378,567 2033 8406-24
52 US75 Resurface highway 75 from Doran to north of highway 55 $10,697,188 2034 8406-25
44 Hwy 7 Resurface from highway 28/Beardsley to county road 9 $3,810,123 2031 0609-34
78 US59 Resurface from Swift/Stevens county line to highway 12 $4,136,391 Not Selected 7609-11

Previous years

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
93 Hwy 27 Medium mill and overlay from 3rd St to I-94  $9,300,000 Not Selected District disagrees with RQI predictions
83 Hwy 114 Resurface from west of Hwy 55 to Jct. north ramp of Hwy 94 $6,499,999 2025 2110-10
82 Hwy 28 Resurface from state line to highway 7 $5,717,461 2032 0604-24 Not a district priority, will continue to monitor pavement performance
81 Hwy 108 From east of Pelican Rapids to Hwy 78 $11,053,524 2026 5623-38
80 Hwy 32 Thin mill and overlay from US10 to Clay/Norman County Line  $6,400,000 Not Selected District disagrees with RQI predictions
80 Hwy 9 Medium mill and overlay from Chippewa River bridge to Stevens County Road 22  $12,000,000 Not Selected Disagree with RQI trends, will continue to monitor pavement condition
79 Hwy 113 Hwy 113 from county road 4 to highway 71 $12,187,134 2028 0307-100
79 Hwy 27 Medium mill and overlay from Grant County road 11 to Hwy 55  $8,400,000 Not Selected District disagrees with RQI predictions
79 US75 Thin mill and overlay from 2nd Ave to Clay/Norman County Line  $6,500,000 Not Selected District disagrees with RQI predictions
78 Hwy 108 Resurface from the south jct of Hwy 78 to 4th Street in Henning. $5,418,079 2025 5624-19
78 Hwy 210 Resurface from Hwy 29 to west of Hwy 71 $4,747,999 2025 5604-09
77 Hwy 78 Thin mill and overlay from I-94 to Hwy 210  $7,100,000 Not Selected District disagrees with RQI predictions
77 Hwy 9 Resurface from Hwy 210 to 6th Street in Barnesville $10,664,967 2028 8409-26
76 Hwy 113 From the Norman/Mahnomen County Line to hwy 59 in Waubun $2,240,205 2024 4407-13
76 Hwy 7 Resurface and improve drainage on Hwy 7 near Ortonville $5,400,000 2026 0609-33
76 Hwy 9 Thin mill and overlay from US10 to Clay/Norman County Line  $6,400,000 Not Selected District disagrees with RQI predictions
76 US75 Thin mill and overlay from 46th Ave S to 30th Ave  $900,000 Not Selected District disagrees with RQI predictions
75 Hwy 34 Medium mill and overlay from Hwy 9 to US59  $9,700,000 Not Selected District disagrees with RQI predictions
75 US75 Medium mill and overlay from Hwy 210 to 220th St  $6,800,000 Not Selected District disagrees with RQI predictions
74 Hwy 27 Resurface from hwy 28 to county road 6 $6,798,945 2029 7802-37
74 US75 Resurface from Mustinka River Bridge to railroad crossing north of highway 55 $5,572,340 2026 7806-32
73 Hwy 113 Resurface from highway 59 to county highway 4 $5,500,000 2032 4405-35 District disagrees with RQI predictions
73 US75 Hwy 75 from Hwy 12 to Hwy 28 in Graceville $9,116,907 2030 0608-40
73 US75 Medium mill and overlay from Hwy 55 to Hwy 28  $4,900,000 Not Selected NA
73 US75 Medium mill and overlay from Hwy 9 to Beede Ave  $3,800,000 Not Selected District disagrees with RQI predictions
72 Hwy 78 Resurface on 78, from Wagon Trail to county road 54 $9,500,003 2030 5620-26
71 Hwy 114 Medium mill and overlay from 8th St to Hwy 55  $2,400,000 Not Selected Samll Segment of Larger Project
70 Hwy 27 Medium mill and overlay from Hwy 75 to Grant County Road 7  $7,300,000 Not Seletced  Small Segment Of Larger Project
70 Hwy 55 Medium mill and overlay from Church St to US59  $2,500,000 Not Selected NA
70 Hwy 7 Medium mill and overlay from 1.57 miles south of Big Stone County Road 68 to Pacific Ave   $5,500,000 Not Selected NA
68 US75 RESURFACE US 75, FROM 0.1 MILES NORTH OF CSAH12 TO 1.3 MILES NORTH OF CSAH 12 $808,461 2028 1406-79
67 Hwy 29 Medium mill and overlay from Hwy 40 to Chippewa/Swift County Line  $1,600,000 Not Selected NA
67 Hwy 9 Medium mill and overlay from Hwy 55 to Hwy 75  $6,600,000 Not Selected NA
66 Hwy 117 Resurface from sd Border to Highway 27 $1,259,858 2033 7807-11
66 Hwy 87 Medium mill and overlay from Becker/Wadena County Line to US71  $1,700,000 Not Selected NA
65 Hwy 114 Resurface Hwy 114 from Starbuck to Lowry; includes reconstruction and ADA in Lowry $4,019,063 2024 6111-26
64 US75 Medium mill and overlay from Hwy 28 to Traverse County Road 11  $3,900,000 Not Selected NA
61 Hwy 329 Medium mill and overlay from US59 to eastern boundary of U of M experiment station  $600,000 Not Selected NA
61 US75 Medium mill and overlay within the Clay County Road 12 roundabout  $200,000 Not Selected NA
60 Hwy 29 Resurface highway 29 from highway 210 to highway 71 $9,685,326 2033 5610-15
52 US75 Resurface from Breckenridge to Doran $9,626,231 2033 8406-24
44 Hwy 7 Resurface from highway 28/Beardsley to county road 9 $3,613,057 2031 0609-34

 

Score Route  Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
93 Hwy 27 Medium mill and overlay from 3rd St to I-94  $9,300,000 Not Selected District disagrees with RQI predictions
83 Hwy 114 Resurface from west of Hwy 55 to Jct. north ramp of Hwy 94 $6,658,164 2025 2110-10
82 Hwy 28 Medium mill and overlay from State line to Hwy 7  $4,800,000 Not Selected Not a district priority, will continue to monitor pavement performance
81 Hwy 108 From east of Pelican Rapids to Hwy 78 $10,662,126 2026 5623-38
80 Hwy 32 Thin mill and overlay from US10 to Clay/Norman County Line  $6,400,000 Not Selected District disagrees with RQI predictions
80 Hwy 9 Medium mill and overlay from Chippewa River bridge to Stevens County Road 22  $12,000,000 Not Selected Disagree with RQI trends, will continue to monitor pavement condition
79 Hwy 113 Hwy 113 from county road 4 to highway 71 $8,052,626 2027 0307-100
79 Hwy 27 Medium mill and overlay from Grant County road 11 to Hwy 55  $8,400,000 Not Selected District disagrees with RQI predictions
79 US75 Thin mill and overlay from 2nd Ave to Clay/Norman County Line  $6,500,000 Not Selected District disagrees with RQI predictions
78 Hwy 108 Resurface from the south jct of Hwy 78 to 4th Street in Henning. $4,548,549 2024 5624-19
78 Hwy 210 Resurface from Hwy 29 to west of Hwy 71 $3,939,707 2025 5604-09
77 Hwy 78 Thin mill and overlay from I-94 to Hwy 210  $7,100,000 Not Selected District disagrees with RQI predictions
77 Hwy 9 Resurface from Hwy 210 to 6th Street in Barnesville $12,829,072 2028 8409-26
76 Hwy 113 From the Norman/Mahnomen County Line to hwy 59 in Waubun $2,112,670 2023 4407-13
76 Hwy 7 Resurface and improve drainage on Hwy 7 near Ortonville $4,011,666 2026 0609-33
76 Hwy 9 Thin mill and overlay from US10 to Clay/Norman County Line  $6,400,000 Not Selected District disagrees with RQI predictions
76 US75 Thin mill and overlay from 46th Ave S to 30th Ave  $900,000 Not Selected District disagrees with RQI predictions
75 Hwy 34 Medium mill and overlay from Hwy 9 to US59  $9,700,000 Not Selected District disagrees with RQI predictions
75 US75 Medium mill and overlay from Hwy 210 to 220th St  $6,800,000 Not Selected District disagrees with RQI predictions
74 Hwy 27 Resurface from hwy 28 to county road 6 $7,809,273 2029 7802-37
74 US75 Resurface from Mustinka River Bridge to railroad crossing north of highway 55 $4,780,563 2025 7806-32
73 Hwy 113 Medium mill and overlay from US59 to Mahnomen County Road 4  $6,100,000 Not Selected District disagrees with RQI predictions
73 US75 Medium mill and overlay from Hwy 55 to Hwy 28  $4,900,000 Not Selected NA
73 US75 Hwy 75 from Hwy 12 to Hwy 28 in Graceville $7,137,026 2031 0608-40
73 US75 Medium mill and overlay from Hwy 9 to Beede Ave  $3,800,000 Not Selected District disagrees with RQI predictions
72 Hwy 78 Resurface on 78, from Wagon Trail to county road 54 $10,983,063 2030 5620-26
70 Hwy 27 Medium mill and overlay from Hwy 75 to Grant County Road 7  $7,300,000 Not Selected NA
70 Hwy 55 Medium mill and overlay from Church St to US59  $2,500,000 Not Selected NA
70 Hwy 7 Medium mill and overlay from 1.57 miles south of Big Stone County Road 68 to Pacific Ave   $5,500,000 Not Selected NA
68 US75 RESURFACE US 75, FROM 0.1 MILES NORTH OF CSAH12 TO 1.3 MILES NORTH OF CSAH 12 $871,731 2027 1406-79
67 Hwy 29 Medium mill and overlay from Hwy 40 to Chippewa/Swift County Line  $1,600,000 Not Selected NA
67 Hwy 9 Medium mill and overlay from Hwy 55 to Hwy 75  $6,600,000 Not Selected NA
66 Hwy 117 Medium mill and overlay from South Dakota/Hwy state line to Hwy 27  $1,000,000 Not Selected NA
66 Hwy 87 Medium mill and overlay from Becker/Wadena County Line to US71  $1,700,000 Not Selected NA
65 Hwy 114 Resurface Hwy 114 from Starbuck to Lowry; includes reconstruction and ADA in Lowry $3,203,951 2024 6111-26
64 US75 Medium mill and overlay from Hwy 28 to Traverse County Road 11  $3,900,000 Not Selected NA
61 Hwy 329 Medium mill and overlay from US59 to eastern boundary of U of M experiment station  $600,000 Not Selected NA
61 US75 Medium mill and overlay within the Clay County Road 12 roundabout  $200,000 Not Selected NA
52 US75 Resurface from Breckenridge to Doran $5,397,395 2029 8406-24
45 Hwy 108 Resurface from I-94 to 9th Street in Pelican Rapids $2,163,729 2023 5625-20
44 Hwy 7 Resurface from highway 28/Beardsley to county road 9 $6,187,280 2032 0609-34

 

View more detailed scores (Excel).

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
93 Hwy 27 Medium mill and overlay from 3rd St to I-94  $9,300,000 Not Selected District disagrees with RQI predictions
82 Hwy 28 Medium mill and overlay from State line to Hwy 7  $4,800,000 Not Selected Not a district priority, will continue to monitor pavement performance
82 Hwy 104 Medium mill and overlay from Hwy 9 to 8th Ave SE  $12,800,000 2031 NA
81 Hwy 108 Medium mill and overlay from US59 to Hwy 78  $11,100,000 2026 NA
80 Hwy 9 Medium mill and overlay from Chippewa River bridge to Stevens County Road 22  $12,000,000 Not Selected Disagree with RQI trends, will continue to monitor pavement condition
80 Hwy 32 Thin mill and overlay from US10 to Clay/Norman County Line  $6,400,000 Not Selected District disagrees with RQI predictions
79 US75 Thin mill and overlay from 2nd Ave to Clay/Norman County Line  $6,500,000 Not Selected District disagrees with RQI predictions
79 Hwy 27 Medium mill and overlay from Grant County road 11 to Hwy 55  $8,400,000 Not Selected District disagrees with RQI predictions
77 Hwy 78 Thin mill and overlay from I-94 to Hwy 210  $7,100,000 Not Selected District disagrees with RQI predictions
77 Hwy 78 Medium mill and overlay from Wagon Trail to Otter Tail County Road 54  $5,200,000 2030 NA
76 US75 Thin mill and overlay from 46th Ave S to 30th Ave  $900,000 Not Selected District disagrees with RQI predictions
76 Hwy 9 Thin mill and overlay from US10 to Clay/Norman County Line  $6,400,000 Not Selected District disagrees with RQI predictions
76 Hwy 9 Medium mill and overlay from Hwy 210 to Railroad tracks in Barnesville  $12,400,000 2028 NA
76 Hwy 7 Medium mill and overlay from Big Stone County Road 53 to Golf Course Road  $5,300,000 2026 NA
75 US75 Medium mill and overlay from Hwy 210 to 220th St  $6,800,000 Not Selected District disagrees with RQI predictions
75 Hwy 108 Thin mill and overlay from I-94 to US59  $2,800,000 2022 NA
75 Hwy 113 Medium mill and overlay from Mahnomen County Road 4 to US71  $19,500,000 2027 NA
75 Hwy 34 Medium mill and overlay from Hwy 9 to US59  $9,700,000 Not Selected District disagrees with RQI predictions
74 US75 Thick mill and overlay from Clay County Road 12 to 46th Ave  $800,000 2027 NA
74 US75 Medium mill and overlay from 5th Ave to Hwy 55  $6,400,000 2025 NA
73 US75 Medium mill and overlay from Hwy 9 to Beede Ave  $3,800,000 Not Selected District disagrees with RQI predictions
73 US75 Medium mill and overlay from Hwy 12 to Hwy 28  $9,400,000 2031 NA
73 US75 Medium mill and overlay from Hwy 55 to Hwy 28  $4,900,000 2030 NA
73 Hwy 113 Medium mill and overlay from US59 to Mahnomen County Road 4  $6,100,000 Not Selected District disagrees with RQI predictions
73 Hwy 114 Medium mill and overlay from Hwy 55 to I-94  $5,200,000 2025 NA
71 Hwy 114 Medium mill and overlay from 8th St to Hwy 55  $2,400,000 2023 NA
70 Hwy 27 Medium mill and overlay from Hwy 75 to Grant County Road 7  $7,300,000 2027 NA
70 Hwy 27 Medium mill and overlay from Hwy 28 to Traverse County Road 6  $6,700,000 Not Selected NA
70 Hwy 55 Medium mill and overlay from Church St to US59  $2,500,000 Not Selected NA
70 Hwy 7 Medium mill and overlay from 1.57 miles south of Big Stone County Road 68 to Pacific Ave   $5,500,000 2031 NA
68 Hwy 108 Medium mill and overlay from Hwy 78 to 4th St  $5,100,000 2024 NA
68 Hwy 7 Medium mill and overlay from Big Stone County Road 68 to Pacific Ave  $700,000 Not Selected NA
67 Hwy 9 Medium mill and overlay from Hwy 55 to Hwy 75  $6,600,000 Not Selected NA
67 Hwy 29 Medium mill and overlay from Hwy 40 to Chippewa/Swift County Line  $1,600,000 Not Selected NA
66 Hwy 113 Medium mill and overlay from Norman/Mahnomen County Line to railroad crossing in Waubun  $2,200,000 2023 NA
66 Hwy 117 Medium mill and overlay from South Dakota/Hwy state line to Hwy 27  $1,000,000 Not Selected NA
66 Hwy 87 Medium mill and overlay from Becker/Wadena County Line to US71  $1,700,000 Not Selected NA
64 US75 Medium mill and overlay from Hwy 28 to Traverse County Road 11  $3,900,000 2023 NA
64 Hwy 55 Reclaim and overlay from North Dakota/Hwy state line to Grant County Road 11  $11,900,000 2022 NA
61 US75 Medium mill and overlay within the Clay County Road 12 roundabout  $200,000 Not Selected NA
61 Hwy 329 Medium mill and overlay from US59 to eastern boundary of U of M experiment station  $600,000 Not Selected NA

View more detailed scores (Excel).

Last updated December 2020

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
83 Hwy 114 Medium mill and overlay from Hwy 55 to I-94 $2,800,000 2026 NA
82 Hwy 27 Thin mill and overlay from E Third St to I-94 $3,100,000 Not selected Not a district priority. Will continue to monitor pavement performance
81 US 75 Medium mill and overlay from 46th Ave S to 30th Ave S $1,300,000 Not selected Not a district priority. Will continue to monitor pavement performance
81 Hwy 54 Reclaim and overlay from Hwy 27 to Hwy 55 $4,100,000 Not selected Turn Back to Grant County
79 Hwy 9 Medium mill and overlay from Hwy10 to Clay/Norman County Line $4,900,000 Not selected Not a district priority. Will continue to monitor pavement performance
79 Hwy 78 Thin mill and overlay from Otter Tail County Road 54 to Hwy 10 $1,400,000 Not selected Not a district priority. Will continue to monitor pavement performance
79 Hwy 114 Medium mill and overlay from 8th St in Starbuck to Hwy 55 $1,400,000 2024 NA
78 Hwy 108 Medium mill and overlay from Hwy 78 to 4th St $2,700,000 2024 NA
78 Hwy 113 Medium mill and overlay from Hwy 59 to Hwy 71 $10,100,000 2030 NA
77 US 75 Thin mill and overlay from 2nd Ave to Clay/Norman County line $3,300,000 Not selected Not a district priority. Will continue to monitor pavement performance
77 Hwy 104 Thin mill and overlay from Hwy 9 to 8th Ave SE $3,600,000 2025 NA
76 Hwy 78 Thin mill and overlay from I-94 to Hwy 210 in Battle Lake $3,600,000 Not selected Not a district priority. Will continue to monitor pavement performance
76 Hwy 113 Thick Mill and overlay from Norman/Mahnomen County line to Railroad crossing in Wabun $1,500,000 2023 NA
75 US 75 Medium mill and overlay from Hwy 210 to 220th St $3,500,000 Not selected Not a district priority. Will continue to monitor pavement performance
75 Hwy 27 Medium mill and overlay from I-94 to Douglas County Road 51/Douglas County Road 82 $600,000 2022 NA
75 Hwy 29 Medium mill and overlay from Chippewa River to Outlet Creek/Starbuck $5,100,000 Not selected Not a district priority. Will continue to monitor pavement performance
74 US 75 Medium overlay from County Road 12 to 46th Ave S $300,000 2027 NA
74 US 75 Medium mill and overlay from Hwy 27 in Wheaton to Railroad crossing north of Hwy 55 $3,600,000 2025 NA
73 US 75 Medium overlay from Railroad crossing north of Hwy 55 to Hwy 9 $2,100,000 2026 NA
73 Hwy 9 Medium mill and overlay from Hwy 210 to 6th St SW in Barnsville $6,400,000 2028 NA
73 Hwy 55 Reclaim and overlay from Hwy59 to Grant/Douglas County line $2,500,000 2021 NA
72 US 75 Medium overlay from Hwy 9 to 6th St in Breckenridge  $1,700,000 Not selected Not a district priority. Will continue to monitor pavement performance
72 US 75 Medium mill and overlay from Traverse County Road 11 (Dumont) to Hwy 27 in Wheaton $1,700,000 Not selected Not a district priority. Will continue to monitor pavement performance
72 Hwy 27 Medium mill and overlay from Hwy 75 to Grant County Road 11 $4,100,000 2027 NA
71 US 75 Thin mill and overlay from Hwy 7 to Hwy 12 $1,400,000 Not selected NA
71 Hwy 9 Medium overlay from Chippewa River to Stevens County Road 22 $5,800,000 Not selected NA
71 Hwy 55 Medium mill and overlay from Church St in Wendell to Hwy59 $1,300,000 Not selected NA
69 Hwy 27 Medium mill and overlay from Grant County Road 11 to Hwy 55 $4,200,000 Not selected NA
69 Hwy 108 Medium mill and overlay from Ann Lane in Pelican Rapids to Hwy 78 $5,700,000 2026 Selected prior to policy (in 2019-2028 CHIP)
68 Hwy 28 Medium overlay from 610th Ave (Chokio) to Lyndale Ave $2,200,000 2021 Selected prior to policy (in 2019-2022 STIP)
68 Hwy 29 Medium mill and overlay from Hwy 210 to Hwy 71 $3,500,000 Not selected NA
66 Hwy 117 Medium mill and overlay from South Dakota/Minnesota State line to Hwy 27 $500,000 Not selected NA
66 Hwy 200 Medium mill and overlay from Norman/Mahnomen County Line to Hwy59 $1,300,000 Not selected NA
65 US 12 Reclaim and overlay from Hwy 75 to Hwy 59 $6,800,000 2021 Selected prior to policy (in 2019-2022 STIP)
64 US 75 Medium mill and overlay from Hwy 28 in Graceville to Traverse County Road 11 in Dumont $2,000,000 2022 Selected prior to policy (in 2019-2022 STIP)
64 US 75 Medium overlay from Lac Qui Parle/Big Stone County line to Hwy 7 $200,000 2021 Selected prior to policy (in 2019-2022 STIP)
64 Hwy 78 Thin mill and overlay from Summit St in Battle Lake to Wagon Trail $1,100,000 Not selected NA
64 Hwy 55 Reclaim and overlay from North Dakota/Minnesota State line to Grant County Road 11 in Wendell  $6,200,000 2022 NA
63 Hwy 87 Reclaim and overlay from River Dr in Frazee to Becker/Wadena County Line $7,100,000 2021 Selected prior to policy (in 2019-2022 STIP)
61 Hwy 78 Reclaim and overlay from Wagon Trail to County Road 54 $4,000,000 Not selected NA
60 US 75 Medium mill and overlay from 5th Ave in Wheaton to Mustinka River in Wheaton $200,000 2021 Selected prior to policy (in 2019-2022 STIP)
60 US 75 Medium mill and overlay from Clay County Road 12 entrance to Clay County Road 12 roundabout exit. $100,000 Not selected NA
55 Hwy 27 Reclaim and overlay from Hwy 28 (Browns Valley) to Traverse County Road 6 $4,900,000 Not selected NA
51 Hwy 329 Medium mill and overlay from Hwy59 to U of M Experiment Station $300,000 Not selected NA
50 Hwy 32 Thin mill and overlay from Hwy 10 to Clay/Norman County line $3,200,000 Not selected NA
45 Hwy 108 Thin mill and overlay from I-94 to 9th St NW in Pelican Rapids $1,500,000 2023 Selected prior to policy (in 2019-2022 STIP)
42 Hwy 28 Thin mill and overlay from South Dakota/Minnesota State line to Hwy 7 $1,600,000 Not selected NA
36 Hwy 7 Reclaim and overlay from Big Stone County Road 53 to 1.6 miles south of Big Stone County Road 68 $4,700,000 Not selected NA
13 US 75 Thin mill and overlay from Hwy 12 to Hwy 28 in  Graceville $3,100,000 2029 Selected prior to policy (in 2019-2028 CHIP)
5 Hwy 7 Thin mill and overlay from Hwy 28 in Beardsley to Big Stone County Road 53 $1,900,000 Not selected NA
3 Hwy 7 Thin mill and overlay from 1.6 miles south of Big Stone County Road 68 to Pacific Ave in Ortonville $300,000 Not selected NA

View more detailed scores (Excel).

Last updated December 2019

Score Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
83 Hwy 114 Medium mill and overlay from Highway 55 to I-94 $5,800,000 2026 NA
79 Hwy 114 Medium mill and overlay from 8th St to Highway 55 $2,700,000 2023 NA
79 Hwy 108 Medium mill and overlay from Ann Lane to Highway 78 $11,500,000 2025 NA
79 US75 Medium overlay from Clay County Road 12 to 46th Ave S $600,000 2026 NA
78 Hwy 108 Medium mill and overlay from Highway 78 to west side of Henning $5,500,000 2024 NA
78 Hwy 108 Reclaim and overlay from I-94 to Highway 59 $7,300,000 2024 NA
77 Hwy 87 Reclaim and overlay from Frazee to Becker Wadena County Line $14,500,000 2021 NA
77 US75 Thick mill and overlay from Highway 27 to railroad crossing north of Highway 55 $9,500,000 2024 NA
77 Hwy 104 Thin mill and overlay from Highway 9 to Highway 29 $7,500,000 2025 NA
77 Hwy 113 Medium mill and overlay from railroad crossing to Mahnomen County Road 4  $5,800,000 2027 NA
76 Hwy 32 Thin mill and overlay from Highway 10 to Clay/Norman County line  $6,200,000 2028 NA
75 US75 Medium mill and overlay from Highway 28 to Big Stone County Road 11 $4,300,000 2023 NA
75 Hwy 113 Medium mill and overlay from Mahnomen County Road 4 to Highway 71 $14,000,000 2029 NA
73 US75 Medium mill and overlay from railroad crossing to Highway 55 $4,400,000 2026 NA
72 Hwy 9 Medium mill and overlay from Highway 104 to Kandiyohi 104 $7,600,000 2025 NA
72 US75 Medium mill and overlay from Highway 9 to Beede Ave $3,500,000 2028 NA
71 Hwy 78 Reclaim and overlay from Summit Ave to Highway 10 $24,000,000 Not selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
70 US75 Reconstruction at Clay County Highway 12 roundabout $1,400,000 2026 NA
70 Hwy 29 Reclaim and overlay from Highway 210 to Highway 71 $9,600,000 2026 NA
69 Hwy 27 Thick mill and overlay from I-94 to Douglas County Road 82 $1,400,000 2022 NA
69 Hwy 28 Thin mill and overlay from Minnesota State line to Highway 7 $3,000,000 2027 NA
69 Hwy 9 Medium overlay from Chippewa river to Stevens County Highway 22  $11,700,000 2028 NA
65 Hwy 55 Reclaim and overlay from Minnesota/North Dakota State line to Grant County Road  11 $12,500,000 2021 NA
63 US75 Thick mill and overlay from Wheaton to Traverse County Road 14 $500,000 2020 NA
62 US75 Medium mill and overlay from Wilkin County Road 184 to Clay/Wilkin County line  $2,200,000 2020 NA
61 Hwy 329 Medium Mill and overlay from Highway 59 to University of Minnesota experiment station  $600,000 2027 NA
60 Hwy 7 Reclaim and overlay from Highway 28 to Big Stone County Highway 68 $18,000,000 2029 NA
56 Hwy 55 Reclaim and overlay from Wendell to Highway 59 $3,800,000 2029 NA
55 Hwy 113 Reclaim and overlay Highway 113 from Normand/Mahnomen County line to railroad crossing $3,500,000 2023 NA
55 Hwy 27 Reclaim and overlay from Highway 75 to Grant County Highway 11 $24,000,000 2027 NA
51 Hwy 117 Reclaim and overlay from Minnesota State line to Highway 27 $1,200,000 2025 NA
47 Hwy 34 Reclaim an overlay from Highway 9 to Highway 59 $14,000,000 Not selected NA
43 Hwy 9 Thin mill and overlay from Highway 10 to Clay/Norman County line $6,000,000 2027 Based on expected pavement life, a larger pavement fix would be needed if thin mill & overlay not performed this year
39 US12 Reclaim and overlay from Highway 75 to Highway 59 $14,000,000 2021 Selected prior to policy (in 2019-2022 STIP)
39 Hwy 29 Thin mill and overlay from Chippewa River to Outlet Creek $6,600,000 Not selected NA
34 Hwy 27 Thin mill and overlay from Grant County Highway 11 to Highway 55 $5,500,000 Not selected NA
33 Hwy 27 Thin mill and overlay from Country Shores Road to I-94 $200,000 Not selected NA
32 Hwy 9 Reclaim and overlay from Highway 21 to 6th St in Barnesville $15,500,000 2022 Selected prior to policy (in 2019-2022 STIP)
31 US75 Thin mill and overlay from Wilkin County Highway 20 to 220th St $1,300,000 Not selected NA