Urban non-freeway/non-expressway pavement projects
MnDOT District 4
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. MnDOT scores and prioritizes urban non-freeway/non-expressway pavement projects separately from the normal pavement scoring process, because of their complexity, utilities and other infrastructure and level of required local coordination and public involvement. In many instances, these roads function both as state highways and as city streets. These pavement projects can be on either National Highway System or non-NHS.
Freeways have full access control (no driveways, signals or at-grade intersections). Expressways have partial access control (limited or no driveways, few and widely spaced intersections, and may include some grade separated crossings). Both are high speed roads designed to facilitate longer trips.
For the purposes of this scoring category, MnDOT uses a flexible, context-based definition of urban. This includes areas with medium-to-high density adjacent development with small to medium setbacks, and in some instances no setback. This includes both residential, industrial and commercial areas. In some instances, the urban context may cover less than a quarter mile.
Urban pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- District 4 project selection
- District 4 National Highway System pavement projects
- District 4 Non-National Highway System pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.
Last updated October 2021
Score | Route | Community | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
79 | US10 | Moorhead | Reconstruction from US75 to 10th St | $3,500,000 | Not Selected | To be turned back to the City of Moorhead |
78 | Hwy 29 | Alexandria | Reconstruction Hwy 29 from north of 18th Ave. to Jct. 8th Ave in Alexandria | $10,523,427 | 2028 | 2102-69 |
78 | Hwy 29 | Alexandria | Thick mill and overlay from 50th Ave to 18th Ave | $2,500,000 | Not Selected | Disagree With RQI Trends |
74 | Hwy 29 | Alexandria | Reconstruction from 3rd Ave to Mckay Ave in Alexandria | $9,693,433 | 2031 | 2103-43 |
73 | US75 | Breckenridge | Reconstruction from Beede Ave to Hwy 210 | $5,300,000 | Not Selected | Disagree With RQI Trends |
69 | Hwy 27 | Wheaton | Medium mill and overlay from US75 to 1st S | $200,000 | Not Selected | Small Segment Of Larger Project |
69 | Hwy 27 | Wheaton/Herman | Resurface from Wheaton to Herman | $8,417,508 | 2030 | 7803-13 |
68 | Hwy 210 | Fergus Falls | Medium mill and overlay from I-94 to Otter Tail County Road 82 | $1,200,000 | Not Selected | Disagree With RQI Trends |
68 | Hwy 29 | Alexandria | Medium mill and overlay from Douglas County Road 28 to 50th Ave | $1,500,000 | Not Selected | Disagree With RQI Trends |
65 | Hwy 108 | Henning | Reconstruction from 4th street in Henning to Jct. of Hwy 210 | $6,134,558 | 2033 | 5624-20 |
65 | Hwy 28 | Browns Valley | Urban reconstruction in Browns Valley | $2,326,466 | 2032 | 7804-20 |
65 | US10/US75 | Moorhead | Resurface/reconstruct Hwy 75 from 24th Ave S to Hwy 10/Main Ave, and slurry seal Hwy 10 from Red River to east of 10th Street in Moorhead with three-lane restriping, update sidewalks, replace signals | $6,000,000 | 2027 | 1406-76 |
65 | US75 | Moorhead | From 24th Ave S to Hwy 10/Main Ave, and Hwy 10 from Red River to east of 10th Street | $13,411,978 | 2027 | 1406-76 |
64 | Hwy 55 | Barrett | Reconstruction from Park St to US59 | $4,700,000 | Not Selected | NA |
64 | Hwy 7/Hwy 119/US59 | Appleton | Reconstruction on Hwy 7 from 1st St to Haven St, on Hwy 119 from Prison entrance to US59 and on US59 from Hwy 119 to Range St | $15,700,000 | Not Selected | NA |
63 | Hwy 108/US59 | Pelican Rapids | Reconstruction on Hwy 108 from US59 to Ann Ln and on US59 from 5th Ave SE to Otter Tail County Road 9 | $12,000,000 | 2024 | 5618-117 |
63 | Hwy 27 | Herman | Reconstruction from county road 7 to county road 11 in Herman | $4,785,047 | 2033 | 2604-11 |
61 | Hwy 9/Hwy 29/US12 | Benson | Reconstruction on Hwy 9 from Swift County Road 104 to Chippewa River, on Hwy 29 from Oakwood ave to Chippewa River and on US12 from 21st to 15th Ave | $35,500,000 | Not Selected | NA |
60 | Hwy 28 | Cyrus | Reconstruction from Pope County Road 51 to Chippewa River | $3,400,000 | Not Selected | Small Segment Of Larger Project |
60 | Hwy 29 | Wadena | Reconstruction from .4 miles SW of US71 to US71/Jefferson St | $3,600,000 | Not Selected | NA |
59 | US10 | Moorhead | Reconstruct from 13th Street to 34th Street, both directions | $13,766,610 | 2029 | 1401-190 |
59 | US12 | Kerkhoven | Thin mill and overlay from 15th St to 4th St | $400,000 | Not Selected | NA |
58 | Hwy 34 | Detroit Lakes | Reconstruction from US59 to Becker County Road 141 | $10,400,000 | Not Selected | NA |
58 | Hwy 55 | Wendell | Reclaim and overlay from Grant County Road 11 to US59 | $4,100,000 | Not Selected | NA |
58 | US10 | Moorhead | Reconstruction from 10th St to 13th St | $2,500,000 | Not Selected | Bonding For Railroad Underpass |
57 | Hwy 28 | Beardsley | Thin mill and overlay from Washington St to Elm St | $100,000 | Not Selected | NA |
57 | US10 | Glyndon | Reconstruction from Foundation Ave to 110th St | $11,200,000 | Not Selected | NA |
57 | US59 | Erhard | Thick mill and overlay from Panama St to Elm St | $300,000 | Not Selected | Small Segment Of Larger Project |
56 | Hwy 7 | Correll | Thin mill and overlay from Hill Ave to Big Stone County Road 25 | $100,000 | Not Selected | NA |
56 | US59 | Elizabeth | Thick mill and overlay from Prairie Ave to Broadway St | $100,000 | Not Selected | Small Segment Of Larger Project |
55 | Hwy 34 | Barnesville | Thin mill and overlay from Hwy 9 to 13th St SE | $300,000 | Not Selected | NA |
55 | Hwy 9 | Morris | Resurface highway 9 in Morris | $1,901,735 | 2034 | 7501-35 |
55 | Hwy 9/Hwy 28 | Morris | Thin mill and overlay on Hwy 9 from Stevens County Road 22 to Hwy 28 and on Hwy 28 from Lyndale Ave to US59 | $1,300,000 | Not Selected | NA |
54 | Hwy 29 | Alexandria | Major CPR and diamond grinding from 8th Ave to 2nd Ave | $1,800,000 | Not Selected | NA |
54 | Hwy 32 | Hitterdal | Thin mill and overlay from within curb and gutter limits | $200,000 | Not Selected | NA |
53 | Hwy 32 | Ulen | Thin mill and overlay from Washington Ave to Wild Rice River | $300,000 | Not Selected | NA |
52 | US10 | Dilworth | Reconstruct from 34th Street to east SE 7th Street in Dilworth | $16,500,000 | 2030 | 1401-182 |
51 | Hwy 108 | Ottertail | Medium mill and overlay from Maple Ave to Buchanan Rd | $100,000 | Not Selected | Small Segment Of Larger Project |
49 | Hwy 78 | Ottertail | Thin mill and overlay from Hwy 108 to Ottertail County Road 1 | $300,000 | Not Selected | Small Segment Of Larger Project |
47 | US59 | Callaway | Thin mill and overlay from Iowa St to Ernster St | $200,000 | Not Selected | NA |
47 | US75 | Clinton | Thin mill and overlay from Lake St to Front St | $200,000 | Not Selected | NA |
44 | Hwy 28/US75 | Graceville | Reconstruction on Hwy 28 from 1.5miles east of Big Stone County Road 35 to US 75 and on US75 from Big Stone County Road 52 to Hwy 28 | $9,100,000 | Not Selected | NA |
42 | Hwy 27 | Hoffman | Thin mill and overlay from Hwy 55 to Third St | $200,000 | Not Selected | NA |
42 | Hwy 28/Hwy 29/Hwy 114 | Starbuck | Thin mill and overlay on Hwy 28 from John St to Tiegen St, on Hwy 29 from Outlet Creek to Hwy 28 and on Hwy 114 from Hwy 8 to 8th St | $500,000 | Not Selected | NA |
42 | Hwy 29 | Parkers Prairie | Thin mill and overlay from Hwy 235 to State St | $400,000 | Not Selected | NA |
42 | Hwy 34 | Osage | Reclaim and overlay from Hwy 225 to Becker County Road 48 | $600,000 | Not Selected | Small Segment Of Larger Project |
41 | US75 | Dumont | Thin mill and overlay from Traverse County Road 11 to Traverse County Road 6 | $200,000 | Not Selected | NA |
38 | Hwy 78 | Battle Lake | Thin mill and overlay from Hwy 210 to Summit St | $200,000 | Not Selected | NA |
37 | Hwy 7/US12 | Ortonville | Thin mill and overlay on Hwy 7 from Pacific Ave to US12 and on US12 from Hwy 7 to US75 | $700,000 | Not Selected | NA |
36 | Hwy 108 | Dent | Medium mill and overlay from .2 miles west of Otter Tail County Road 35 to .08 miles west of Otter Tail County Road 35 | $100,000 | Not Selected | Small Segment Of Larger Project |
34 | US10 | Detroit Lakes | Major CPR and diamond grinding from Summit Ave to Becker County Road 54 | $4,400,000 | Not Selected | NA |
31 | Hwy 210 | Fergus Falls | Reconstruct and replace bridges from Hwy 210 from west of Hwy 94 to Jct. Hwy 94 | $17,313,331 | 2026 | 5601-35 |
30 | Hwy 27/US75 | Wheaton | Thin mill and overlay on Hwy 27 from 16th st to 12th St and on US75 from Hwy 27 to 5th Ave N | $500,000 | Not Selected | NA |
30 | Hwy 28/Hwy 29/Hwy 104 | Glenwood | Thin mill and overlay on Hwy 28 from .2 miles NW of 5th St to 5th St, on Hwy 29 from Hwy 28 to Hwy 55 and on Hwy 104 from 8th Ave to Hwy 28 | $2,300,000 | Not Selected | NA |
28 | Hwy 55/Hwy 79/US59 | Elbow Lake | Thin mil and overlay on Hwy 55 from Hwy 79 to Central Ave, on Hwy 79 from Hwy 55 to 2nd Ave NE and on US59 from Hwy 79 to end of Elbow Lake curb and gutter | $300,000 | Not Selected | NA |
28 | US10 | Detroit Lakes | Major CPR and diamond grinding from US59 to Summit Ave | $700,000 | Not Selected | NA |
24 | Hwy 55 | Hoffman | Thin mill and overlay from Hwy 27 to Grant County Road 37 | $100,000 | Not Selected | NA |
Previous years
Score | Route | Community | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
79 | US10 | Moorhead | Reconstruction from US75 to 10th St | $3,500,000 | Not Selected | To be turned back to the City of Moorhead |
78 | Hwy 29 | Alexandria | Reconstruction Hwy 29 from north of 18th Ave. to Jct. 8th Ave in Alexandria | $7,182,670 | 2028 | 2102-69 |
78 | Hwy 29 | Alexandria | Thick mill and overlay from 50th Ave to 18th Ave | $2,500,000 | Not Selected | Disagree With RQI Trends |
74 | Hwy 29 | Alexandria | Reconstruction from 3rd Ave to Mckay Ave in Alexandria | $10,602,900 | 2029 | 2103-43 |
73 | US75 | Breckenridge | Reconstruction from Beede Ave to Hwy 210 | $5,300,000 | Not Selected | Disagree With RQI Trends |
69 | Hwy 27 | Wheaton | Medium mill and overlay from US75 to 1st S | $200,000 | Not Selected | Small Segment Of Larger Project |
69 | Hwy 27 | Wheaton/Herman | Resurface from Wheaton to Herman | $7,299,618 | 2028 | 7803-13 |
68 | Hwy 210 | Fergus Falls | Medium mill and overlay from I-94 to Otter Tail County Road 82 | $1,200,000 | Not Selected | Disagree With RQI Trends |
68 | Hwy 29 | Alexandria | Medium mill and overlay from Douglas County Road 28 to 50th Ave | $1,500,000 | Not Selected | Disagree With RQI Trends |
65 | Hwy 108 | Henning | Reconstruction from 4th street in Henning to Jct. of Hwy 210 | $4,087,318 | 2024 | 5624-20 |
65 | Hwy 28 | Browns Valley | Urban reconstruction in Browns Valley | $3,242,800 | 2032 | 7804-20 |
65 | US10/US75 | Moorhead | Reconstruction on US10 from State line to US75 and on US75 from 24th to US10 | $22,000,000 | 2026 | 1406-76 |
65 | US75 | Moorhead | From 24th Ave S to Hwy 10/Main Ave, and Hwy 10 from Red River to east of 10th Street | $13,411,978 | 2027 | 1406-76 |
64 | Hwy 55 | Barrett | Reconstruction from Park St to US59 | $4,700,000 | Not Selected | NA |
64 | Hwy 7/Hwy 119/US59 | Appleton | Reconstruction on Hwy 7 from 1st St to Haven St, on Hwy 119 from Prison entrance to US59 and on US59 from Hwy 119 to Range St | $15,700,000 | Not Selected | NA |
63 | Hwy 108/US59 | Pelican Rapids | Reconstruction on Hwy 108 from US59 to Ann Ln and on US59 from 5th Ave SE to Otter Tail County Road 9 | $12,000,000 | 2024 | 5618-117 |
63 | Hwy 27 | Herman | Reconstruction from county road 7 to county road 11 in Herman | $3,387,430 | 2029 | 2604-11 |
61 | Hwy 9/Hwy 29/US12 | Benson | Reconstruction on Hwy 9 from Swift County Road 104 to Chippewa River, on Hwy 29 from Oakwood ave to Chippewa River and on US12 from 21st to 15th Ave | $35,500,000 | Not Selected | NA |
60 | Hwy 28 | Cyrus | Reconstruction from Pope County Road 51 to Chippewa River | $3,400,000 | Not Selected | Small Segement Part of Larger Project |
60 | Hwy 29 | Wadena | Reconstruction from .4 miles SW of US71 to US71/Jefferson St | $3,600,000 | Not Selected | NA |
59 | US10 | Moorhead | Reconstruct from 13th Street to 34th Street, both directions | $12,375,285 | 2029 | 1401-190 |
59 | US12 | Kerkhoven | Thin mill and overlay from 15th St to 4th St | $400,000 | Not Selected | NA |
58 | Hwy 34 | Detroit Lakes | Reconstruction from US59 to Becker County Road 141 | $10,400,000 | Not Selected | NA |
58 | Hwy 55 | Wendell | Reclaim and overlay from Grant County Road 11 to US59 | $4,100,000 | Not Selected | NA |
58 | US10 | Moorhead | Reconstruction from 10th St to 13th St | $2,500,000 | Not Selected | Bonding For Railroad Underpass |
57 | Hwy 28 | Beardsley | Thin mill and overlay from Washington St to Elm St | $100,000 | Not Selected | NA |
57 | US10 | Glyndon | Reconstruction from Foundation Ave to 110th St | $11,200,000 | Not Selected | NA |
57 | US59 | Erhard | Thick mill and overlay from Panama St to Elm St | $300,000 | Not Selected | Small Segment Of Larger Project |
56 | Hwy 7 | Correll | Thin mill and overlay from Hill Ave to Big Stone County Road 25 | $100,000 | Not Selected | NA |
56 | US59 | Elizabeth | Thick mill and overlay from Prairie Ave to Broadway St | $100,000 | Not Selected | Small Segment Of Larger Project |
55 | Hwy 34 | Barnesville | Thin mill and overlay from Hwy 9 to 13th St SE | $300,000 | Not Selected | NA |
55 | Hwy 9/Hwy 28 | Morris | Thin mill and overlay on Hwy 9 from Stevens County Road 22 to Hwy 28 and on Hwy 28 from Lyndale Ave to US59 | $1,300,000 | Not Selected | NA |
54 | Hwy 29 | Alexandria | Major CPR and diamond grinding from 8th Ave to 2nd Ave | $1,800,000 | Not Selected | NA |
54 | Hwy 32 | Hitterdal | Thin mill and overlay from within curb and gutter limits | $200,000 | Not Selected | NA |
53 | Hwy 32 | Ulen | Thin mill and overlay from Washington Ave to Wild Rice River | $300,000 | Not Selected | NA |
52 | US10 | Dilworth | Reconstruct from 34th Street to east SE 7th Street in Dilworth | $12,926,900 | 2030 | 1401-182 |
51 | Hwy 108 | Ottertail | Medium mill and overlay from Maple Ave to Buchanan Rd | $100,000 | Not Selected | Small Segment Of Larger Project |
49 | Hwy 78 | Ottertail | Thin mill and overlay from Hwy 108 to Ottertail County Road 1 | $300,000 | Not Selected | Small Segment Of Larger Project |
47 | US59 | Callaway | Thin mill and overlay from Iowa St to Ernster St | $200,000 | Not Selected | NA |
47 | US75 | Clinton | Thin mill and overlay from Lake St to Front St | $200,000 | Not Selected | NA |
44 | Hwy 28/US75 | Graceville | Reconstruction on Hwy 28 from 1.5miles east of Big Stone County Road 35 to US 75 and on US75 from Big Stone County Road 52 to Hwy 28 | $9,100,000 | Not Selected | NA |
42 | Hwy 27 | Hoffman | Thin mill and overlay from Hwy 55 to Third St | $200,000 | Not Selected | NA |
42 | Hwy 28/Hwy 29/Hwy 114 | Starbuck | Thin mill and overlay on Hwy 28 from John St to Tiegen St, on Hwy 29 from Outlet Creek to Hwy 28 and on Hwy 114 from Hwy 8 to 8th St | $500,000 | Not Selected | NA |
42 | Hwy 29 | Parkers Prairie | Thin mill and overlay from Hwy 235 to State St | $400,000 | Not Selected | NA |
42 | Hwy 34 | Osage | Reclaim and overlay from Hwy 225 to Becker County Road 48 | $600,000 | Not Selected | Small Segment Of Larger Project |
41 | US75 | Dumont | Thin mill and overlay from Traverse County Road 11 to Traverse County Road 6 | $200,000 | Not Selected | NA |
38 | Hwy 78 | Battle Lake | Thin mill and overlay from Hwy 210 to Summit St | $200,000 | Not Selected | NA |
37 | Hwy 7/US12 | Ortonville | Thin mill and overlay on Hwy 7 from Pacific Ave to US12 and on US12 from Hwy 7 to US75 | $700,000 | Not Selected | NA |
36 | Hwy 108 | Dent | Medium mill and overlay from .2 miles west of Otter Tail County Road 35 to .08 miles west of Otter Tail County Road 35 | $100,000 | Not Selected | Small Segment Of Larger Project |
34 | US10 | Detroit Lakes | Major CPR and diamond grinding from Summit Ave to Becker County Road 54 | $4,400,000 | Not Selected | NA |
31 | Hwy 210 | Fergus Falls | Reconstruct and replace bridges from Hwy 210 from west of Hwy 94 to Jct. Hwy 94 | $18,149,997 | 2026 | 5601-35 |
30 | Hwy 27/US75 | Wheaton | Thin mill and overlay on Hwy 27 from 16th st to 12th St and on US75 from Hwy 27 to 5th Ave N | $500,000 | Not Selected | NA |
30 | Hwy 28/Hwy 29/Hwy 104 | Glenwood | Thin mill and overlay on Hwy 28 from .2 miles NW of 5th St to 5th St, on Hwy 29 from Hwy 28 to Hwy 55 and on Hwy 104 from 8th Ave to Hwy 28 | $2,300,000 | Not Selected | NA |
28 | Hwy 55/Hwy 79/US59 | Elbow Lake | Thin mil and overlay on Hwy 55 from Hwy 79 to Central Ave, on Hwy 79 from Hwy 55 to 2nd Ave NE and on US59 from Hwy 79 to end of Elbow Lake curb and gutter | $300,000 | Not Selected | NA |
28 | US10 | Detroit Lakes | Major CPR and diamond grinding from US59 to Summit Ave | $700,000 | Not Selected | NA |
24 | Hwy 55 | Hoffman | Thin mill and overlay from Hwy 27 to Grant County Road 37 | $100,000 | Not Selected | NA |
Score | Route | Community | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
79 | US10 | Moorhead | Reconstruction from US75 to 10th St | $3,500,000 | Not Selected | To be turned back to the City of Moorhead |
78 | Hwy 29 | Alexandria | Reconstruction Hwy 29 from north of 18th Ave. to Jct. 8th Ave in Alexandria | $8,119,540 | 2028 | 2102-69 |
78 | Hwy 29 | Alexandria | Thick mill and overlay from 50th Ave to 18th Ave | $2,500,000 | Not Selected | Disagree With RQI Trends |
74 | Hwy 29 | Alexandria | Reconstruction from 3rd Ave to Mckay Ave in Alexandria | $12,206,700 | 2029 | 2103-43 |
73 | US75 | Breckenridge | Reconstruction from Beede Ave to Hwy 210 | $5,300,000 | Not Selected | Disagree With RQI Trends |
69 | Hwy 27 | Wheaton/Herman | Resurface from Wheaton to Herman | $6,301,298 | 2027 | 7803-13 |
69 | Hwy 27 | Wheaton | Medium mill and overlay from US75 to 1st S | $200,000 | Not Selected | Small Segment Of Larger Project |
68 | Hwy 210 | Fergus Falls | Medium mill and overlay from I-94 to Otter Tail County Road 82 | $1,200,000 | Not Selected | Disagree With RQI Trends |
68 | Hwy 29 | Alexandria | Medium mill and overlay from Douglas County Road 28 to 50th Ave | $1,500,000 | Not Selected | Disagree With RQI Trends |
65 | Hwy 108 | Henning | Reconstruction from 4th street in Henning to Jct. of Hwy 210 | $4,087,318 | 2024 | 5624-20 |
65 | Hwy 28 | Browns Valley | Urban reconstruction in Browns Valley | $3,823,600 | 2032 | 7804-20 |
65 | US10/US75 | Moorhead | Reconstruction on US10 from State line to US75 and on US75 from 24th to US10 | $22,000,000 | 2026 | 1406-76 |
65 | US75 | Moorhead | From 24th Ave S to Hwy 10/Main Ave, and Hwy 10 from Red River to east of 10th Street | $14,924,150 | 2026 | 1406-76 |
64 | Hwy 55 | Barrett | Reconstruction from Park St to US59 | $4,700,000 | Not Selected | NA |
64 | Hwy 7/Hwy 119/US59 | Appleton | Reconstruction on Hwy 7 from 1st St to Haven St, on Hwy 119 from Prison entrance to US59 and on US59 from Hwy 119 to Range St | $15,700,000 | Not Selected | NA |
63 | Hwy 108/US59 | Pelican Rapids | Reconstruction on Hwy 108 from US59 to Ann Ln and on US59 from 5th Ave SE to Otter Tail County Road 9 | $12,000,000 | Not Selected | 5618-117 |
63 | Hwy 27 | Herman | Reconstruction from county road 7 to county road 11 in Herman | $3,899,814 | 2029 | 2604-11 |
61 | Hwy 9/Hwy 29/US12 | Benson | Reconstruction on Hwy 9 from Swift County Road 104 to Chippewa River, on Hwy 29 from Oakwood ave to Chippewa River and on US12 from 21st to 15th Ave | $35,500,000 | Not Selected | NA |
60 | Hwy 28 | Cyrus | Reconstruction from Pope County Road 51 to Chippewa River | $3,400,000 | Not Selected | NA |
60 | Hwy 29 | Wadena | Reconstruction from .4 miles SW of US71 to US71/Jefferson St | $3,600,000 | Not Selected | NA |
59 | US10 | Moorhead | Reconstruct from 13th Street to 34th Street, both directions | $13,519,220 | 2028 | 1401-190 |
59 | US12 | Kerkhoven | Thin mill and overlay from 15th St to 4th St | $400,000 | Not Selected | NA |
58 | Hwy 34 | Detroit Lakes | Reconstruction from US59 to Becker County Road 141 | $10,400,000 | Not Selected | NA |
58 | Hwy 55 | Wendell | Reclaim and overlay from Grant County Road 11 to US59 | $4,100,000 | Not Selected | NA |
58 | US10 | Moorhead | Reconstruction from 10th St to 13th St | $2,500,000 | Not Seltected | Bonding For Railroad Underpass |
57 | Hwy 28 | Beardsley | Thin mill and overlay from Washington St to Elm St | $100,000 | Not Selected | NA |
57 | US10 | Glyndon | Reconstruction from Foundation Ave to 110th St | $11,200,000 | Not Selected | NA |
57 | US59 | Erhard | Thick mill and overlay from Panama St to Elm St | $300,000 | Not Selcted | Small Segment Of Larger Project |
56 | Hwy 7 | Correll | Thin mill and overlay from Hill Ave to Big Stone County Road 25 | $100,000 | Not Selected | NA |
56 | US59 | Elizabeth | Thick mill and overlay from Prairie Ave to Broadway St | $100,000 | Not Selected | Small Segment Of Larger Project |
55 | Hwy 34 | Barnesville | Thin mill and overlay from Hwy 9 to 13th St SE | $300,000 | Not Selected | NA |
55 | Hwy 9/Hwy 28 | Morris | Thin mill and overlay on Hwy 9 from Stevens County Road 22 to Hwy 28 and on Hwy 28 from Lyndale Ave to US59 | $1,300,000 | Not Selected | NA |
54 | Hwy 29 | Alexandria | Major CPR and diamond grinding from 8th Ave to 2nd Ave | $1,800,000 | Not Selected | NA |
54 | Hwy 32 | Hitterdal | Thin mill and overlay from within curb and gutter limits | $200,000 | Not Selected | NA |
54 | Hwy 9 | Barnesville | Reconstruct and resurface from Barnesville to I-94; includes pedestrian accessibility improvements a | $6,699,998 | 2023 | 1409-25 Coordination With City Of Barnesville |
53 | Hwy 32 | Ulen | Thin mill and overlay from Washington Ave to Wild Rice River | $300,000 | Not Selected | NA |
52 | US10 | Dilworth | Reconstruct from 34th Street to east SE 7th Street in Dilworth | $12,926,900 | 2027 | 1401-182 |
51 | Hwy 108 | Ottertail | Medium mill and overlay from Maple Ave to Buchanan Rd | $100,000 | Not Selected | Small Segment Of Larger Project |
49 | Hwy 78 | Ottertail | Thin mill and overlay from Hwy 108 to Ottertail County Road 1 | $300,000 | Not Seletcted | Small Segment Of Larger Project |
47 | US59 | Callaway | Thin mill and overlay from Iowa St to Ernster St | $200,000 | Not Selected | NA |
47 | US75 | Clinton | Thin mill and overlay from Lake St to Front St | $200,000 | Not Selected | NA |
44 | Hwy 28/US75 | Graceville | Reconstruction on Hwy 28 from 1.5miles east of Big Stone County Road 35 to US 75 and on US75 from Big Stone County Road 52 to Hwy 28 | $9,100,000 | Not Selected | NA |
42 | Hwy 27 | Hoffman | Thin mill and overlay from Hwy 55 to Third St | $200,000 | Not Selected | NA |
42 | Hwy 28/Hwy 29/Hwy 114 | Starbuck | Thin mill and overlay on Hwy 28 from John St to Tiegen St, on Hwy 29 from Outlet Creek to Hwy 28 and on Hwy 114 from Hwy 8 to 8th St | $500,000 | Not Selected | NA |
42 | Hwy 29 | Parkers Prairie | Thin mill and overlay from Hwy 235 to State St | $400,000 | Not Selected | NA |
42 | Hwy 34 | Osage | Reclaim and overlay from Hwy 225 to Becker County Road 48 | $600,000 | Not Selected | Small Segment Of Larger Project |
41 | US75 | Dumont | Thin mill and overlay from Traverse County Road 11 to Traverse County Road 6 | $200,000 | Not Selected | NA |
38 | Hwy 78 | Battle Lake | Thin mill and overlay from Hwy 210 to Summit St | $200,000 | Not Selected | NA |
37 | Hwy 7/US12 | Ortonville | Thin mill and overlay on Hwy 7 from Pacific Ave to US12 and on US12 from Hwy 7 to US75 | $700,000 | Not Selected | NA |
36 | Hwy 108 | Dent | Medium mill and overlay from .2 miles west of Otter Tail County Road 35 to .08 miles west of Otter Tail County Road 35 | $100,000 | Not Selected | Small Segment Of Larger Project |
34 | US10 | Detroit Lakes | Major CPR and diamond grinding from Summit Ave to Becker County Road 54 | $4,400,000 | Not Selected | NA |
31 | Hwy 210 | Fergus Falls | Reconstruct and replace bridges from Hwy 210 from west of Hwy 94 to Jct. Hwy 94 | $18,100,002 | 2028 | 5601-35 |
30 | Hwy 27/US75 | Wheaton | Thin mill and overlay on Hwy 27 from 16th st to 12th St and on US75 from Hwy 27 to 5th Ave N | $500,000 | Not Selected | ?? All of Wheaton was completed in 2019; SP 7802-33 and SP 7802-35 |
30 | Hwy 28/Hwy 29/Hwy 104 | Glenwood | Thin mill and overlay on Hwy 28 from .2 miles NW of 5th St to 5th St, on Hwy 29 from Hwy 28 to Hwy 55 and on Hwy 104 from 8th Ave to Hwy 28 | $2,300,000 | Not Selected | NA |
28 | Hwy 55/Hwy 79/US59 | Elbow Lake | Thin mil and overlay on Hwy 55 from Hwy 79 to Central Ave, on Hwy 79 from Hwy 55 to 2nd Ave NE and on US59 from Hwy 79 to end of Elbow Lake curb and gutter | $300,000 | Not Selected | NA |
28 | US10 | Detroit Lakes | Major CPR and diamond grinding from US59 to Summit Ave | $700,000 | Not Selected | NA |
24 | Hwy 55 | Hoffman | Thin mill and overlay from Hwy 27 to Grant County Road 37 | $100,000 | Not Selected | NA |
View more detailed scores (Excel).
Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
79 | US10 | Moorhead | Reconstruction from US75 to 10th St | $3,500,000 | Not Selected | To be turned back to the City of Moorhead |
79 | Hwy 29 | Alexandria | Reconstruction from 2nd Ave to McKay Ave | $12,900,000 | 2029 | NA |
78 | Hwy 29 | Alexandria | Thick mill and overlay from 50th Ave to 18th Ave | $2,500,000 | Not Selected | Disagree With RQI Trends |
73 | US75 | Breckenridge | Reconstruction from Beede Ave to Hwy 210 | $5,300,000 | Not Selected | Disagree With RQI Trends |
70 | Hwy 87 | Frazee | Reconstruction from US10 to River Dr in Frazee | $5,800,000 | 2022 | NA |
69 | Hwy 27 | Wheaton | Medium mill and overlay from US75 to 1st S | $200,000 | 2027 | NA |
68 | Hwy 27 | Herman | Reconstruction from Grant County Road 7 to Grant County Road 11 | $8,200,000 | 2029 | NA |
68 | Hwy 29 | Alexandria | Medium mill and overlay from Douglas County Road 28 to 50th Ave | $1,500,000 | Not Selected | Disagree With RQI Trends |
68 | Hwy 210 | Fergus Falls | Medium mill and overlay from I-94 to Otter Tail County Road 82 | $1,200,000 | Not Selected | Disagree With RQI Trends |
65 | Hwy 28 | Browns Valley | Thin mill and overlay from Traverse County Road 106 to Jackson St | $200,000 | Not Selected | NA |
65 | US10/US75 | Moorhead | Reconstruction on US10 from State line to US75 and on US75 from 24th to US10 | $22,000,000 | 2026 | NA |
65 | US10/US76 | Moorhead | Reconstruction on US10 from 13th St to 34th St and on US75 from US10 to 2nd Ave | $20,100,000 | 2028 | NA |
64 | Hwy 55 | Barrett | Reconstruction from Park St to US59 | $4,700,000 | Not Selected | NA |
64 | Hwy 7/Hwy 119/US59 | Appleton | Reconstruction on Hwy 7 from 1st St to Haven St, on Hwy 119 from Prison entrance to US59 and on US59 from Hwy 119 to Range St | $15,700,000 | Not Selected | NA |
63 | Hwy 108/US59 | Pelican Rapids | Reconstruction on Hwy 108 from US59 to Ann Ln and on US59 from 5th Ave SE to Otter Tail County Road 9 | $12,000,000 | 2024 | NA |
62 | US10 | Dilworth | Reconstruction from 34th St to 7th St | $17,700,000 | 2027 | NA |
61 | Hwy 9/Hwy 29/US12 | Benson | Reconstruction on Hwy 9 from Swift County Road 104 to Chippewa River, on Hwy 29 from Oakwood ave to Chippewa River and on US12 from 21st to 15th Ave | $35,500,000 | Not Selected | NA |
60 | Hwy 29 | Wadena | Reconstruction from .4 miles SW of US71 to US71/Jefferson St | $3,600,000 | Not Selected | NA |
60 | Hwy 108 | Henning | Reconstruction from 4th St to Hwy 210 | $4,200,000 | 2024 | NA |
60 | Hwy 28 | Cyrus | Reconstruction from Pope County Road 51 to Chippewa River | $3,400,000 | 2025 | NA |
59 | US12 | Kerkhoven | Thin mill and overlay from 15th St to 4th St | $400,000 | Not Selected | NA |
58 | US10 | Moorhead | Reconstruction from 10th St to 13th St | $2,500,000 | 2023 | Bonding For Railroad Underpass |
58 | Hwy 34 | Detroit Lakes | Reconstruction from US59 to Becker County Road 141 | $10,400,000 | Not Selected | NA |
58 | Hwy 55 | Wendell | Reclaim and overlay from Grant County Road 11 to US59 | $4,100,000 | Not Selected | NA |
57 | US10 | Glyndon | Reconstruction from Foundation Ave to 110th St | $11,200,000 | Not Selected | NA |
57 | US59 | Erhard | Thick mill and overlay from Panama St to Elm St | $300,000 | 2027 | Small Segment Of Larger Project |
57 | Hwy 28 | Beardsley | Thin mill and overlay from Washington St to Elm St | $100,000 | Not Selected | NA |
56 | US59 | Elizabeth | Thick mill and overlay from Prairie Ave to Broadway St | $100,000 | 2027 | Small Segment Of Larger Project |
56 | Hwy 7 | Correll | Thin mill and overlay from Hill Ave to Big Stone County Road 25 | $100,000 | Not Selected | NA |
56 | Hwy 113 | Waubun | Thin mill and overlay from Railroad crossing to US59 | $200,000 | Not Selected | NA |
55 | Hwy 34 | Barnesville | Thin mill and overlay from Hwy 9 to 13th St SE | $300,000 | Not Selected | NA |
55 | Hwy (/Hwy 28 | Morris | Thin mill and overlay on Hwy 9 from Stevens County Road 22 to Hwy 28 and on Hwy 28 from Lyndale Ave to US59 | $1,300,000 | Not Selected | NA |
54 | Hwy 29 | Alexandria | Major CPR and diamond grinding from 8th Ave to 2nd Ave | $1,800,000 | Not Selected | NA |
54 | Hwy 32 | Hitterdal | Thin mill and overlay from within curb and gutter limits | $200,000 | Not Selected | NA |
53 | Hwy 32 | Ulen | Thin mill and overlay from Washington Ave to Wild Rice River | $300,000 | Not Selected | NA |
51 | Hwy 108 | Ottertail | Medium mill and overlay from Maple Ave to Buchanan Rd | $100,000 | 2024 | Small Segment Of Larger Project |
49 | Hwy 78 | Ottertail | Thin mill and overlay from Hwy 108 to Ottertail County Road 1 | $300,000 | 2030 | Small Segment Of Larger Project |
49 | Hwy 9 | Barnesville | Reconstruction from the railroad tracks to I-94 | $8,800,000 | 2023 | Coordination With City Of Barnesville |
47 | US75 | Clinton | Thin mill and overlay from Lake St to Front St | $200,000 | Not Selected | NA |
47 | US59 | Callaway | Thin mill and overlay from Iowa St to Ernster St | $200,000 | Not Selected | NA |
44 | Hwy /28/US75 | Graceville | Reconstruction on Hwy 28 from 1.5miles east of Big Stone County Road 35 to US 75 and on US75 from Big Stone County Road 52 to Hwy 28 | $9,100,000 | Not Selected | NA |
42 | Hwy 34 | Osage | Reclaim and overlay from Hwy 225 to Becker County Road 48 | $600,000 | 2024 | Small Segment Of Larger Project |
42 | Hwy 27 | Hoffman | Thin mill and overlay from Hwy 55 to Third St | $200,000 | Not Selected | NA |
42 | Hwy 29 | Parkers Prairie | Thin mill and overlay from Hwy 235 to State St | $400,000 | Not Selected | NA |
42 | Hwy 28/Hwy 29/Hwy 114 | Starbuck | Thin mill and overlay on Hwy 28 from John St to Tiegen St, on Hwy 29 from Outlet Creek to Hwy 28 and on Hwy 114 from Hwy 8 to 8th St | $500,000 | Not Selected | NA |
41 | US75 | Dumont | Thin mill and overlay from Traverse County Road 11 to Traverse County Road 6 | $200,000 | Not Selected | NA |
41 | Hwy 210 | Fergus Falls | Reconstruction from .4 miles west if I-94 to I-94 | $6,000,000 | 2028 | Coordinate Work With Bridge Replacement |
38 | Hwy 78 | Battle Lake | Thin mill and overlay from Hwy 210 to Summit St | $200,000 | Not Selected | NA |
37 | Hwy 7/US12 | Ortonville | Thin mill and overlay on Hwy 7 from Pacific Ave to US12 and on US12 from Hwy 7 to US75 | $700,000 | Not Selected | NA |
36 | Hwy 108 | Dent | Medium mill and overlay from .2 miles west of Otter Tail County Road 35 to .08 miles west of Otter Tail County Road 35 | $100,000 | 2026 | Small Segment Of Larger Project |
34 | US10 | Detroit Lakes | Major CPR and diamond grinding from Summit Ave to Becker County Road 54 | $4,400,000 | Not Selected | NA |
30 | Hwy 28/Hwy 29/Hwy 104 | Glenwood | Thin mill and overlay on Hwy 28 from .2 miles NW of 5th St to 5th St, on Hwy 29 from Hwy 28 to Hwy 55 and on Hwy 104 from 8th Ave to Hwy 28 | $2,300,000 | Not Selected | NA |
30 | Hwy 27/US75 | Wheaton | Thin mill and overlay on Hwy 27 from 16th st to 12th St and on US75 from Hwy 27 to 5th Ave N | $500,000 | Not Selected | NA |
28 | US10 | Detroit Lakes | Major CPR and diamond grinding from US59 to Summit Ave | $700,000 | Not Selected | NA |
28 | Hwy 55/Hwy 79/US59 | Elbow Lake | Thin mil and overlay on Hwy 55 from Hwy 79 to Central Ave, on Hwy 79 from Hwy 55 to 2nd Ave NE and on US59 from Hwy 79 to end of Elbow Lake curb and gutter | $300,000 | Not Selected | NA |
24 | Hwy 55 | Hoffman | Thin mill and overlay from Hwy 27 to Grant County Road 37 | $100,000 | Not Selected | NA |
View more detailed scores (Excel).
Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
80 | Hwy 29 | Alexandria | Reconstruction from 2nd Ave to McKay Ave in Alexandria | $8,700,000 | 2029 | NA |
74 | Hwy 27 | Herman | Reconstruction from 1.1 miles east of Grant County Road 7 to Grant County Road 11 in Herman | $4,500,000 | Not selected | Not a district priority will continue to monitor pavement condition. |
73 | Hwy 29 | Alexandria | Reconstruction from 18th Ave E to 8th Ave in Alexandria | $9,700,000 | 2028 | NA |
68 | Hwy 29 | Alexandria | Thick mill and overlay from 50th Ave to 18th Ave E | $2,500,000 | Not selected | Not a district priority will continue to monitor pavement condition. |
66 | Hwy 28 | Browns Valley | Thin mill and overlay from Traverse County Road 106 to Jackson St in Browns Valley | $100,000 | Not selected | Not a district priority will continue to monitor pavement condition. |
65 | Hwy 108 | Henning | Reconstruction from 4th St to Hwy 210 in Henning | $2,200,000 | 2024 | NA |
61 | Hwy 78 | Battle Lake | Thin mill and overlay from Hwy 210 to Glenhaven St in Battle Lake | $1,200,000 | Not selected | Not a district priority will continue to monitor pavement condition. |
58 | Hwy 28 | Beardsley | Thin mill and overlay from Washington St to Westfall St in Beardsley | $100,000 | Not selected | Not a district priority will continue to monitor pavement condition. |
57 | Hwy 78 | Ottertail | Thin mill and overlay from Hwy 108 to Otter Tail County Road 1 in Ottertail | $200,000 | Not selected | Not a district priority will continue to monitor pavement condition. |
55 | Hwy 7 | Correll | Thin mill and overlay from Hill Ave to Big Stone County Road 25 in Correll | $100,000 | Not selected | Not a district priority will continue to monitor pavement condition. |
54 | Hwy 9 | Barnesville | Reconstruction from 6th St to I-94 in Barnsville | $5,300,000 | 2023 | NA |
54 | Hwy 9/Hwy 28 | Morris | Thin mill and overlay on Hwy9 from Stevens County Road 22 to Hwy 28 and on Hwy 28 from Lyndale Ave to Pomme de Terre River in Morris | $700,000 | Not selected | NA |
52 | US 75 | Clinton | Thin mill and overlay from Lake St to Front St in Clinton | $100,000 | Not selected | NA |
50 | US 59 | Callaway | Thin mill and overlay from Iowa St to Ernster St in Callaway | $100,000 | Not selected | NA |
49 | Hwy 87 | Frazee | Reconstruction from Hwy10 to River Dr in Frazee | $3,100,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
48 | US 10 | Moorhead | Reconstruction from Hwy75 to 11th St in Moorhead | $3,500,000 | Not selected | Potential turnback with the city of Moorhead |
48 | US 75 | Breckenridge | Reconstruction from 6th St to Hwy 210 in Breckenridge | $5,300,000 | Not selected | NA |
48 | US 12 | Kerkhoven | Thin mill and overlay from 15th St to 4th St in Kerkhoven | $200,000 | Not selected | Conditions on the ground do not reflect predicted RQI |
47 | Hwy 27 | Hoffman | Thin mill and overlay from Hwy 55 to 3rd St in Hoffman | $100,000 | Not selected | Conditions on the ground do not reflect predicted RQI |
46 | Hwy 27 | Wheaton | Medium mill and overlay from Hwy 75 to 1st St om Wheaton | $100,000 | 2027 | Small segment of larger project |
45 | Hwy 29 | Wadena | Reconstruction from Hwy71 to Jefferson St in Wadena | $1,800,000 | Not selected | NA |
45 | Hwy 32 | Hitterdal | Thin mill and overlay from northern city limits to southern city limits in Hitterdal | $100,000 | Not selected | NA |
45 | Hwy 113 | Waubun | Thin mill and overlay from Railroad crossing to Hwy59 in Waubun | $100,000 | Not selected | NA |
44 | Hwy 32 | Ulen | Thin mill and overlay from Washington Ave to Wild Rice River in Ulen | $200,000 | Not selected | NA |
43 | Hwy 29 | Alexandria | Medium mill and overlay from County Road 27/87 to 50th Ave in Alexandria | $1,300,000 | Not selected | NA |
43 | US 59/Hwy 109 | Pelican Rapids | Reconstruction on Hwy59 from 5th Ave to Otter Tail County Road 9 and on Hwy 109 from 9th Ave to Ann Ln in Pelican Rapids | $6,200,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
42 | US 10 | Dilworth | Reconstruction from 34th St to SE 7th St in Dilworth | $28,200,000 | 2027 | Coordinated project with the city of Dillworth. |
42 | Hwy 7/US 59/Hwy 119 | Appleton | Reconstruction on Hwy 7 from Haven St to Hwy59, on Hwy59 from Hwy 7 to Range St and Hwy 119 from prison entrance to Hwy 59 in Appleton | $7,900,000 | Not selected | NA |
41 | Hwy 34 | Detroit Lakes | Reconstruction from Hwy59 to Becker County Road 141 | $5,200,000 | Not selected | NA |
41 | Hwy 27/US 59 | Wheaton | Thin mill and overlay on Hwy27 from 16th st to Hwy75 and on Hwy75 from Hwy 27 to 5th St in Wheaton | $200,000 | Not selected | NA |
40 | Hwy 55 | Hoffman | Thin mill and overlay from Hwy 27 to Grant County Road 37 | $100,000 | Not selected | NA |
39 | Hwy 34 | Barnesville | Thin mill and overlay from Hwy 9 to 13th St SE in Barnsville | $200,000 | Not selected | NA |
39 | Hwy 55 | Barrett | Reconstruction from Park St to Hwy59 in Barrett | $2,400,000 | Not selected | NA |
39 | Hwy 29 | Alexandria | Resurfacing from 8th Ave to Hwy 27 in Alexandria | $1,800,000 | Not selected | NA |
39 | Hwy 28 | Cyrus | Reconstruction from Pope County Road 51 to Chippewa River in Cyrus | $1,700,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
39 | US 10/US 75 | Moorhead | Reconstruction on Hwy10 from 11th St to 34th St and on Hwy75 from Hwy10 to 2nd Ave in Moorhead | $20,100,000 | 2026 | Planned project with the City of Moorhead |
39 | Hwy 55/US 59/Hwy 79 | Elbow Lake | Thin mill and overlay on Hwy 55 from Hwy 79 to Central Ave, on Hwy59 from Hwy 79 to 2nd St NW and on Hwy 70 from Hwy59 to 2nd Ave NE in Elbow Lake | $200,000 | Not selected | NA |
38 | Hwy 210 | Fergus Falls | Medium mill and overlay from I-94 to Otter Tail County Road 82 in Fergus Falls | $600,000 | Not selected | NA |
37 | US 75 | Dumont | Thin mill and overlay from Traverse County Road 6 to Traverse County Road 11 in Dumont | $100,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
37 | Hwy 7/US 12 | Ortonville | Thin mill and overlay on Hwy 7 from Pacific Ave to Hwy75 and on Hwy12 from Hwy 7 to Hwy 75 in Ortonville | $400,000 | Not selected | NA |
37 | Hwy 9/US 12/Hwy 29 | Benson | Reconstruction on Hwy 9 from Swift County Road 104 to Chippewa River on Hwy12 from 21st St to 15th ave and on Hwy 29 from Oakwood ave to Chippewa River in Benson | $17,800,000 | Not selected | NA |
36 | US 10 | Glyndon | Reconstruction from Foundation Ave to 110th St in Glyndon | $12,500,000 | Not selected | NA |
34 | Hwy 34 | Osage | Reclaim and overlay from Hwy 225 to Becker County Road 48 in Osage | $300,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
34 | US 10/US 75 | Moorhead | Reconstruction on Hwy10 from Minnesota State line to Hwy75 and on Hwy74 from 24th Ave to Hwy10 in Moorhead | $22,000,000 | 2025 | Planned project with the City of Moorhead |
33 | Hwy 55 | Wendell | Reclaim and overlay from Grant County Road 11 to Church St in Wendell | $300,000 | Not selected | NA |
32 | US 75 | Graceville | Medium overlay from Big Stone County Road 52 to Hwy 28 in Graceville | $200,000 | Not selected | NA |
32 | Hwy 29 | Parkers Prairie | Thin mill and overlay from Hwy 235 to State St in Parkers Prairie | $200,000 | Not selected | NA |
32 | Hwy 108 | Dent | Medium mill and overlay from .2 miles west of Otter Tail County Road 35 to .08 miles west of Otter Tail County Road 35 | $100,000 | Not selected | NA |
32 | US 59 | Erhard | Thick mill and overlay from Panama St to Elm St in Erhard | $200,000 | 2027 | Coordinated with NHS pavement project |
31 | Hwy 108 | Ottertail | Medium mill and overlay from Maple Ave to Buchanan Rd in Ottertail | $100,000 | 2023 | NA |
31 | US 59 | Elizabeth | Thick mill and overlay from Prairie Ave to Broadway St in Elizabeth | $100,000 | 2027 | Coordinated with NHS pavement project |
31 | Hwy 29/Hwy 28/Hwy 104 | Glenwood | Thin mill and overlay on Hwy 28 from 5th St to 210th Ave, on Hwy 29 from Hwy 28 to Hwy 55 nd on Hwy 104 from 8th ave to Hwy 28 in Glenwood | $1,400,000 | Not selected | NA |
28 | US 10 | Detroit Lakes | Resurfacing from Summit Ave to Becker County Road 54 in Detroit Lakes | $4,600,000 | Not selected | NA |
26 | US 10 | Detroit Lakes | Resurfacing from Hwy59 to Summit Ave in Detroit Lakes | $700,000 | Not selected | NA |
21 | Hwy 210 | Fergus Falls | Reconstruction from .4 miles west of I-94 to I-94 in Fergus Falls | $5,400,000 | 2028 | Smaller segment of larger project |
View more detailed scores (Excel).
Score | Community | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
82 | Henning | Hwy 108 | Reconstruction in Henning | $4,600,000 | 2024 | NA |
79 | Moorhead | US10/US75 | Reconstruction in Moorhead | $25,000,000 | 2025 | NA |
78 | Alexandria | Hwy 29 | Reconstruction in Alexandria | $34,000,000 | 2029 | NA |
76 | Osage | Hwy 34 | Reclaim and overlay in Osage | $400,000 | 2024 | NA |
76 | Fergus Falls | Hwy 210 | Reconstruction in Fergus falls | $5,700,000 | 2029 | NA |
75 | Frazee | Hwy 87 | Reconstruction in Frazee | $8,500,000 | 2022 | NA |
75 | Appleton | Hwy 7/Hwy 119 | Reconstruction in Appleton | $18,000,000 | Not selected | District anticipates the pavement condition will not deteriorate as fast as the model is projecting |
73 | Breckenridge | US75 | Reconstruction in Breckenridge | $14,000,000 | Not selected | District anticipates the pavement condition will not deteriorate as fast as the model is projecting |
73 | Alexandria | Hwy 29 | Medium mill and overlay in Alexandria | $1,500,000 | Not selected | District anticipates the pavement condition will not deteriorate as fast as the model is projecting |
72 | Dilworth | US10 | Reconstruction in Dilworth | $30,000,000 | 2027 | NA |
72 | Fergus Falls | Hwy 210 | Reconstruction in Fergus Falls | $14,000,000 | 2029 | NA |
71 | Ottertail | Hwy 78 | Reclaim and overlay in Ottertail | $300,000 | Not selected | District anticipates the pavement condition will not deteriorate as fast as the model is projecting |
69 | Pelican Rapids | US59/Hwy 108 | Reconstruction in Pelican Rapids | $10,000,000 | 2024 | Selected prior to policy (in 2020-2028 CHIP) |
68 | Detroit Lakes | Hwy 34 | Reconstruction in Detroit Lakes | $10,500,000 | Not selected | NA |
66 | Browns Valley | Hwy 28 | Thin mill and overlay in Browns Valley | $400,000 | 2027 | Selected prior to policy (in 2020-2028 CHIP) |
66 | Benson | US12/Hwy 9/Hwy 29 | Overlay in Benson | $31,000,000 | Not selected | NA |
64 | Wadena | Hwy 29 | Medium mill and overlay in Wadena | $300,000 | 2026 | Selected prior to policy (in 2020-2028 CHIP) |
63 | Wendell | Hwy 55 | Reclaim and overlay in Wendell | $700,000 | Not selected | NA |
61 | Cyrus | Hwy 28 | Reconstruction in Cyrus | $2,700,000 | 2024 | Selected prior to policy (in 2020-2028 CHIP) |
59 | Alexandria | Hwy 29 | Major concrete repair in Alexandria | $1,800,000 | 2029 | Selected prior to policy (in 2020-2028 CHIP) |
58 | Ottertail | Hwy 108 | Medium mill and overlay in Ottertail | $200,000 | 2024 | Selected prior to policy (in 2020-2028 CHIP) |
58 | Beardsley | Hwy 28 | Thin mill and overlay in Beardsley | $300,000 | 2027 | Selected prior to policy (in 2020-2028 CHIP) |
58 | Battle Lake | Hwy 78 | Reclaim and overlay in Battle lake | $500,000 | Not selected | NA |
55 | Alexandria | Hwy 29 | Reconstruction in Alexandria | $9,100,000 | 2028 | Selected prior to policy (in 2020-2028 CHIP) |
55 | Glyndon | US10 | Reconstruction in Glyndon | $11,000,000 | Not selected | NA |
49 | Elizabeth | US59 | Thick mill and overlay in Elizabeth | $700,000 | 2026 | Coordinated with an adjacent NHS pavement project |
46 | Barrett | Hwy 55 | Reconstruction in Barrett | $3,000,000 | Not selected | NA |
45 | Erhard | US59 | Thick mill and overlay in Erhard | $1,000,000 | 2026 | Coordinated with an adjacent NHS pavement project |
44 | Starbuck | Hwy 28/Hwy 29/Hwy 114 | Reconstruction in multiple locations in Starbuck | $7,000,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
42 | Hoffman | Hwy 27 | Thin mill and overlay in Hoffman | $300,000 | Not selected | NA |
41 | Ortonville | US12/Hwy 7 | Thin mill and overlay in Ortonville | $1,300,000 | Not selected | NA |
41 | Correll | Hwy 7 | Thin mill and overlay in Correll | $300,000 | Not selected | NA |
38 | Detroit Lakes | US10 | Reconstruction in Detroit Lakes | $33,000,000 | Not selected | NA |