Non-National Highway System pavement projects

MnDOT District 6

Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated December 2024

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
MN44 95 Highway 44 from Highway 52 to Co Rd 27 (Spring Grove), mill and overlay   $6,800,000   2033 2308-1124023    
MN57 95 Repair Hwy 57 from 11th Street in Kasson to Wanamingo   $11,600,000   2033 2007-46    
MN60 95 Resurface Highway 60 from Highway 13 to Highway 21 in Faribault   $8,500,000   2033 6606-45    
US218 95 Resurface Highway 218 from Iowa border to east of I-90    $6,200,000   2033 5008-36    
MN13 94 Resurface Highway 13 from Highway 69 to Highway 30    $8,700,000   2033 2401-43    
MN58 90 Resurface of MN Hwy 58 from US 52 to Goodhue Co Rd 5   $7,600,000   2030 2510-1124028    
MN74 90 Resurface Highway 74 from Highway 52 to east Highway 14    $7,500,000   2032 8507-28    
US14 85 Blacktop repaving Highway 14 from west of Highway 74 to Highway 61 $11,400,000 Not selected Not selected due to cost being greater than available budget.
MN19 84 Resurface Highway 19 from Highway 13 to I 35   $8,250,000   2033 6602-30    
MN44 84 Resurface Highway 44 from Spring Grove to Caledonia    $4,500,000   2031 2803-35    
MN16 83 Resurface Hwy 16 from Hwy 44 to Hwy 26 and from 0.37 mi W Hwy 61 to Hwy 16, Hwy 61 from Hwy 16/61 to 4th St. and Hwy 44 from Hwy 44/16 Jct to Highway 16   $2,820,000   2028   2801-91   
MN16/US61 83 Resurface Hwy 16 in La Crescent to Hwy 61 and Hwy 61 from east La Crescent to 4th Street.   $2,500,000   2028   2805-75   
MN246 83 Blacktop repaving Highway 246 from Highway 3 to Nerstrand $5,600,000 Not selected Not selected due to cost being greater than available budget.
MN44 81 Resurface Highway 44 from Houston County Road 12 to Hokah   $7,400,000   2030 2804-39    
MN19 80 Resurface Hwy 19 from Northfield to Hwy 56    $3,500,000   2034 6604-1124042    
MN60 79 Resurface Highway 60 from Kenyon to Highway 52    $8,900,000   2031 2511-54    
MN74 78 Resurface Highway 74 from Highway 14 to Elba   $5,000,000   2034 8508-1053820    
US63 76 Future pavement project on Highway 63 at the north interchange with Highway 52 $300,000 Not selected Not selected due to being a candidate for a future maintenance project and coordination with a future MnDOT project.
US65 75 Resurface Hwy 65 from Iowa state line to 0.5 mi. south I-35   $4,500,000   2030 2404-44    
MN30 74 Resurface Hwy 30 from Hwy 52 in Chatfield to east side of Stewartville   $7,821,631   2025   5505-30   
MN30 74 Future pavement project on Highway 30 from Highway 56 to Olmsted County Road 8 $9,500,000 Not selected Not selected due to cost being greater than available budget.
MN246 73 Resurface Hwy 246 from Rice County Road 26 to Hwy 56   $3,100,000   2026   2519-06   
MN56 73 Resurface Hwy 56 from County Road 46 to Hwy 14   $13,400,000   2031 2005-30    
MN247 71 Resurface MN Hwy 247 from Hwy 63 to Hwy 42   $5,700,000   2032 7912-1124068    
MN30 71 Resurface Highway 30 from Highway 13 to Ellendale    $4,800,000   2030 7403-34    
MN57 71 Future pavement project on Highway 57 from Highway 14 to Dodge County Road 34 in Kasson $500,000 Not selected Not selected due to cost being greater than available budget.
US69 70 Future pavement project on Highway 69 from the Iowa border to Albert Lea $6,200,000 Not selected Not selected due to cost being greater than available budget.
MN248 69 Future pavement project on Highway 248 from Altura to Highway 61 $5,600,000 Not selected Not selected due to cost being greater than available budget.
MN76 69 Resurface Highway 76 from Caledonia to Houston    $6,000,000   2029 2807-29    
MN76 69 Resurface Highway 76 from Houston to Interstate 90   $7,000,000   2033 2808-1037860    
MN16 68 Resurface Hwy 16 from Spring Valley to the north US 52 junction   $7,600,000   2034 2315-1124024    
MN56 68 Resurface Hwy 56 from Hwy 63 to LeRoy    $3,100,000   2034 5005-1124033    
US63 67 Future pavement project on Highway 63 from Wabasha County Road 78 to Lake City $2,700,000 Not selected Not selected due to cost being greater than available budget.
MN30 65 Repair Highway 30 from Highway 218 in Blooming Prairie to Highway 56 in Hayfield    $6,300,000   2034 2003-15    
MN30 65 Resurface Hwy 30 from Steele Co Rd 45 to Blooming Prairie    $3,500,000   2034 7404-1124065    
MN80 65 Resurface Hwy 80 from Hwy 16 to Hwy 52   $4,800,000   2034 2318-1124027    
MN57 58 Future pavement project on Highway 57 from Wanamingo to Highway 52 $2,100,000 Not selected
MN43 52 Resurface MN Highways 16 & 43 from Rushford to I-90   $5,200,000   2034 8502-1124066    RQI forecast doesn't reflect on the ground conditions or expectations
MN19 43 Future pavement project on Highway 19 from Cannon Falls to Highway 61 $8,000,000 Not selected
MN19 42 Future pavement project on Highway 19 from Highway 56 to Highway 52 $3,900,000 Not selected
MN56 34 Future pavement project on Highway 56 from West Concord to Kenyon $4,700,000 Not selected
US14 27 Resurface Highway 14 from Stockton to Winona   $1,600,000   2027 8501-75   A slope stabilization project here the prior year necessitates pavement resurfacing.

 

Previous years

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
MN13 95 Blacktop repaving Highway 13 from Highway 69 to Highway 30 $11,500,000 Not selected Not selected due to cost being greater than available budget.
MN44 95 Resurface Highway 44 from Houston County Road 12 to Hokah   $7,600,000   2033 2804-39    
MN58 95 Blacktop repaving Highway 58 from Highway 52 to 0.8 mi. S Goodhue County Road 5 $9,500,000 Not selected Not selected due to cost being greater than available budget.
MN60 95 Blacktop repaving Highway 60 from east of Highway 13 to Highway 21 $8,700,000 Not selected Not selected due to cost being greater than available budget.
US218 95 Blacktop repaving Highway 218 from Iowa border to east of I-90 $6,600,000 Not selected Not selected due to cost being greater than available budget.
MN57 95 MN 57, FULL DEPTH RECLAMATION - Future Project   $11,100,000   2034 2007-46    
MN74 90 Resurface Highway 74 from Highway 52 to east Highway 14    $8,000,000   2033 8507-28    
US65 89 Future pavement project on Highway 65 from I-35 to Highway 13 in Albert Lea $3,600,000 Not selected Not selected due to cost being greater than available budget.
MN44 85 Future pavement project on Highway 44 from Highway 52 to Spring Grove $6,500,000 Not selected Not selected due to cost being greater than available budget.
US14 85 Blacktop repaving Highway 14 from west of Highway 74 to Highway 61 $11,400,000 Not selected Not selected due to cost being greater than available budget.
MN19 84 Resurface Highway 19 from Highway 13 to I 35   $8,250,000   2032 6602-30    
MN44 84 Resurface Highway 44 from Spring Grove to Caledonia    $4,500,000   2029 2803-35    
US65 84 Blacktop repaving Highway 65 from Iowa border to I35 $4,600,000 Not selected Not selected due to cost being greater than available budget.
MN16 83 Resurface Hwy 16 from Hwy 44 to Hwy 26 and from 0.37 mi W Hwy 61 to Hwy 16, Hwy 61 from Hwy 16/61 to 4th St. and Hwy 44 from Hwy 44/16 Jct to Highway 16   $4,100,000   2027   2801-91   
MN246 83 Blacktop repaving Highway 246 from Highway 3 to Nerstrand $5,600,000 Not selected Not selected due to cost being greater than available budget.
MN43 83 Future pavement project on Highway 43 from Rushford to the west junction with I-90 $4,800,000 Not selected Not selected due to cost being greater than available budget.
MN30 81 Reclamation Highway 30 from Highway 218 in Blooming Prairie to Highway 56 in Hayfield $7,400,000 Not selected Not selected due to cost being greater than available budget.
MN60 79 Resurface Highway 60 from Kenyon to Highway 52    $8,900,000   2031 2511-54
MN76 79 Blacktop repaving Highway 76 from Houston to I-90 $7,100,000 Not selected Not selected due to cost being greater than available budget.
MN247 77 Future pavement project on Highway 247 from Highway 63 to Plainview $6,100,000 Not selected Not selected due to cost being greater than available budget.
MN74 77 Blacktop repaving Highway 74 from Highway 14 to Elba $5,200,000 Not selected Not selected due to cost being greater than available budget.
MN57 76 Reclamation Highway 57 from 11th Street in Kasson to Dodge County Road 30 near Wanamingo $14,500,000 Not selected Not selected due to cost being greater than available budget.
US63 76 Future pavement project on Highway 63 at the north interchange with Highway 52 $300,000 Not selected Not selected due to being a candidate for a future maintenance project and coordination with a future MnDOT project.
MN65 75 Resurface Hwy 65 from Iowa state line to 0.5 mi. south I-35   $4,500,000   2030 2404-44    
MN30 74 Future pavement project on Highway 30 from Highway 56 to Olmsted County Road 8 $9,500,000 Not selected Not selected due to cost being greater than available budget.
MN30 74 Resurface Hwy 30 from 0.42 miles east of Hwy 63 to 0.22 miles west of Hwy 52   $7,410,000   2025   5505-30   
MN246 73 Resurface Hwy 246 from Rice County Road 26 to Hwy 56   $3,100,000   2025   2519-06   
MN56 73 Resurface Hwy 56 from County Road 46 to Hwy 14   $13,400,000   2032 2005-30    
MN30 71 Resurface Highway 30 from Highway 13 to Ellendale    $4,800,000   2031 7403-34    
MN57 71 Future pavement project on Highway 57 from Highway 14 to Dodge County Road 34 in Kasson $500,000 Not selected Not selected due to cost being greater than available budget.
US69 70 Future pavement project on Highway 69 from the Iowa border to Albert Lea $6,200,000 Not selected Not selected due to cost being greater than available budget.
MN248 69 Future pavement project on Highway 248 from Altura to Highway 61 $5,600,000 Not selected Not selected due to cost being greater than available budget.
MN76 69 Resurface Highway 76 from Caledonia to Houston    $6,000,000   2029 2807-29    
MN80 69 Blacktop repaving Highway 80 from Highway 16 to Highway 52 $4,300,000 Not selected Not selected due to cost being greater than available budget.
MN56 68 Future pavement project on Highway 56 from Highway 63 to Taopi, excluding Le Roy $7,000,000 Not selected Not selected due to cost being greater than available budget.
MN30 67 Future pavement project on Highway 30 from Steele County Road 45 to Highway 218 $3,900,000 Not selected Not selected due to cost being greater than available budget.
US63 67 Future pavement project on Highway 63 from Wabasha County Road 78 to Lake City $2,700,000 Not selected Not selected due to cost being greater than available budget.
MN57 58 Future pavement project on Highway 57 from Wanamingo to Highway 52 $2,100,000 Not selected
MN19 43 Future pavement project on Highway 19 from Cannon Falls to Highway 61 $8,000,000 Not selected
MN19 42 Future pavement project on Highway 19 from Highway 56 to Highway 52 $3,900,000 Not selected
MN56 34 Future pavement project on Highway 56 from West Concord to Kenyon $4,700,000 Not selected
MN292 0 Future pavement project on Highway 292 near US61 in Red Wing  $200,000 Not selected Not selected due to turnback negotiations.

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
95 MN13 Blacktop repaving Highway 13 from Highway 69 to Highway 30 $11,500,000 Not selected Not selected due to cost being greater than available budget.
95 MN44 Blacktop repaving Highway 44 from Houston County Road 12 to Hokah $6,600,000 Not selected Not selected due to cost being greater than available budget.
95 MN58 Blacktop repaving Highway 58 from Highway 52 to 0.8 mi. S Goodhue County Road 5 $9,500,000 Not selected Not selected due to cost being greater than available budget.
95 MN60 Blacktop repaving Highway 60 from east of Highway 13 to Highway 21 $8,700,000 Not selected Not selected due to cost being greater than available budget.
95 US218 Blacktop repaving Highway 218 from Iowa border to east of I-90 $6,600,000 Not selected Not selected due to cost being greater than available budget.
90 MN74 Blacktop repaving Highway 74 from Highway 52 to east Highway 14 $7,000,000 Not selected Not selected due to cost being greater than available budget.
89 US65 Future pavement project on Highway 65 from I-35 to Highway 13 in Albert Lea $3,600,000 Not selected Not selected due to cost being greater than available budget.
85 MN43 Resurfacing Highway 43 from Highway 44 to Highway 16    $12,995,801   2023, Prior   2306-26   
85 MN44 Future pavement project on Highway 44 from Highway 52 to Spring Grove $6,500,000 Not selected Not selected due to cost being greater than available budget.
85 US14 Blacktop repaving Highway 14 from west of Highway 74 to Highway 61 $11,400,000 Not selected Not selected due to cost being greater than available budget.
84 MN19 Resurface Highway 19 from Highway 13 to I 35   $9,300,000   2030 6602-30    
84 MN44 Resurface Highway 44 from Spring Grove to Caledonia    $5,200,000   2030 2803-35    
84 US65 Blacktop repaving Highway 65 from Iowa border to I35 $4,600,000 Not selected Not selected due to cost being greater than available budget.
83 MN16 Resurface Hwy 16 from Hwy 44 to Hwy 26 and from 0.37 mi W Hwy 61 to Hwy 16, Hwy 61 from Hwy 16/61 to 4th St. and Hwy 44 from Hwy 44/16 Jct to Highway 16   $3,500,000   2027-2028 2801-91    
83 MN246 Blacktop repaving Highway 246 from Highway 3 to Nerstrand $5,600,000 Not selected Not selected due to cost being greater than available budget.
83 MN43 Future pavement project on Highway 43 from Rushford to the west junction with I-90 $4,800,000 Not selected Not selected due to cost being greater than available budget.
81 MN30 Reclamation Highway 30 from Highway 218 in Blooming Prairie to Highway 56 in Hayfield $7,400,000 Not selected Not selected due to cost being greater than available budget.
79 MN60 Resurface Highway 60 from Kenyon to Highway 52    $10,000,000   2031 2511-1038177    
79 MN76 Blacktop repaving Highway 76 from Houston to I-90 $7,100,000 Not selected Not selected due to cost being greater than available budget.
77 MN247 Future pavement project on Highway 247 from Highway 63 to Plainview $6,100,000 Not selected Not selected due to cost being greater than available budget.
77 MN74 Blacktop repaving Highway 74 from Highway 14 to Elba $5,200,000 Not selected Not selected due to cost being greater than available budget.
76 MN57 Reclamation Highway 57 from 11th Street in Kasson to Dodge County Road 30 near Wanamingo $14,500,000 Not selected Not selected due to cost being greater than available budget.
76 US63 Future pavement project on Highway 63 at the north interchange with Highway 52 $300,000 Not selected Not selected due to being a candidate for a future maintenance project and coordination with a future MnDOT project.
75 MN65 Resurface Hwy 65 from Iowa state line to 0.5 mi. south I-35   $5,700,000   2032 2404-44    
74 MN30 Resurface Hwy 30 from Hwy 63 to Hwy 52 and replace traffic signal   $7,750,000   2024, 2025   5505-30   
74 MN30 Future pavement project on Highway 30 from Highway 56 to Olmsted County Road 8 $9,500,000 Not selected Not selected due to cost being greater than available budget.
73 MN246 Resurface Hwy 246 from Rice County Road 26 to Hwy 56   $2,300,000   2025   2519-06   
73 MN56 Resurface Hwy 56 from County Road 46 to Hwy 14   $13,100,000   2029 2005-30    
71 MN30 Resurface Highway 30 from Highway 13 to Ellendale    $5,200,000   2030 7403-1037844    
71 MN57 Future pavement project on Highway 57 from Highway 14 to Dodge County Road 34 in Kasson $500,000 Not selected Not selected due to cost being greater than available budget.
70 US69 Future pavement project on Highway 69 from the Iowa border to Albert Lea $6,200,000 Not selected Not selected due to cost being greater than available budget.
69 MN248 Future pavement project on Highway 248 from Altura to Highway 61 $5,600,000 Not selected Not selected due to cost being greater than available budget.
69 MN76 Resurface Highway 76 from Caledonia to Houston    $6,000,000   2028 2807-29    
69 MN80 Blacktop repaving Highway 80 from Highway 16 to Highway 52 $4,300,000 Not selected Not selected due to cost being greater than available budget.
68 MN56 Future pavement project on Highway 56 from Highway 63 to Taopi, excluding Le Roy $7,000,000 Not selected Not selected due to cost being greater than available budget.
67 MN30 Future pavement project on Highway 30 from Steele County Road 45 to Highway 218 $3,900,000 Not selected Not selected due to cost being greater than available budget.
67 US63 Future pavement project on Highway 63 from Wabasha County Road 78 to Lake City $2,700,000 Not selected Not selected due to cost being greater than available budget.
58 MN57 Future pavement project on Highway 57 from Wanamingo to Highway 52 $2,100,000 Not selected
43 MN19 Future pavement project on Highway 19 from Cannon Falls to Highway 61 $8,000,000 Not selected
42 MN19 Future pavement project on Highway 19 from Highway 56 to Highway 52 $3,900,000 Not selected
34 MN56 Future pavement project on Highway 56 from West Concord to Kenyon $4,700,000 Not selected
0 MN292 Future pavement project on Highway 292 near US61 in Red Wing  $200,000 Not selected Not selected due to turnback negotiations.

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
95 US218 Blacktop repaving Highway 218 from Iowa border to east of I-90 $6,600,000 Not selected Not selected due to cost being greater than available budget.
95 MN13 Blacktop repaving Highway 13 from Highway 69 to Highway 30 $11,500,000 Not selected Not selected due to cost being greater than available budget.
95 MN44 Blacktop repaving Highway 44 from Houston County Road 12 to Hokah $6,600,000 Not selected Not selected due to cost being greater than available budget.
95 MN60 Blacktop repaving Highway 60 from east of Highway 13 to Highway 21 $8,700,000 Not selected Not selected due to cost being greater than available budget.
95 MN58 Blacktop repaving Highway 58 from Highway 52 to 0.8 mi. S Goodhue County Road 5 $9,500,000 Not selected Not selected due to cost being greater than available budget.
90 MN30 Blacktop repaving Highway 30 from Highway 63 to Highway 52 $6,200,000 2024  
90 MN60 Blacktop repaving Highway 60 from Kenyon to Highway 52 $8,400,000 Not selected Not selected due to cost being greater than available budget.
90 MN74 Blacktop repaving Highway 74 from Highway 52 to east Highway 14 $7,000,000 Not selected Not selected due to cost being greater than available budget.
89 US65 Future pavement project on Highway 65 from I-35 to Highway 13 in Albert Lea $3,600,000 Not selected Not selected due to cost being greater than available budget.
85 MN43 Blacktop repaving Highway 43 from Highway 44 to Highway 16 $8,200,000 2023  
85 MN44 Future pavement project on Highway 44 from Highway 52 to Spring Grove $6,500,000 Not selected Not selected due to cost being greater than available budget.
85 US14 Blacktop repaving Highway 14 from west of Highway 74 to Highway 61 $11,400,000 Not selected Not selected due to cost being greater than available budget.
84 MN19 Blacktop repaving Highway 19 from Highway 13 to Interstate 35 $6,700,000 2028  
84 MN44 Blacktop repaving Highway 44 from Spring Grove to Caledonia $4,600,000 2031
84 US14 Blacktop repaving Highway 14  from Marion Road in Rochester to Olmsted County Road 19 west of Chester Woods Park $2,800,000 2023  
84 US65 Blacktop repaving Highway 65 from Iowa border to I35 $4,600,000 Not selected Not selected due to cost being greater than available budget.
83 MN246 Blacktop repaving Highway 246 from Highway 3 to Nerstrand $5,600,000 Not selected Not selected due to cost being greater than available budget.
83 MN43 Future pavement project on Highway 43 from Rushford to the west junction with I-90 $4,800,000 Not selected Not selected due to cost being greater than available budget.
81 MN30 Reclamation Highway 30 from Highway 218 in Blooming Prairie to Highway 56 in Hayfield $7,400,000 Not selected Not selected due to cost being greater than available budget.
79 MN76 Blacktop repaving Highway 76 from Houston to I-90 $7,100,000 Not selected Not selected due to cost being greater than available budget.
77 MN74 Blacktop repaving Highway 74 from Highway 14 to Elba $5,200,000 Not selected Not selected due to cost being greater than available budget.
77 MN247 Future pavement project on Highway 247 from Highway 63 to Plainview $6,100,000 Not selected Not selected due to cost being greater than available budget.
76 MN57 Reclamation Highway 57 from 11th Street in Kasson to Dodge County Road 30 near Wanamingo $14,500,000 Not selected Not selected due to cost being greater than available budget.
76 US63 Future pavement project on Highway 63 at the north interchange with Highway 52 $300,000 Not selected Not selected due to being a candidate for a future maintenance project and coordination with a future MnDOT project.
74 MN30 Future pavement project on Highway 30 from Highway 56 to Olmsted County Road 8 $9,500,000 Not selected Not selected due to cost being greater than available budget.
73 MN246 Future pavement project on Highway 246 from Nerstrand to Highway 56 $4,500,000 Not selected Not selected due to cost being greater than available budget.
73 MN56 Blacktop repaving Highway 56 from Mower County Road 46 to Highway 14 $11,300,000 2029  
71 MN30 Blacktop repaving Highway 30 from Highway 13 to Ellendale $4,400,000 2030  
71 MN57 Future pavement project on Highway 57 from Highway 14 to Dodge County Road 34 in Kasson $500,000 Not selected Not selected due to cost being greater than available budget.
70 US69 Future pavement project on Highway 69 from the Iowa border to Albert Lea $6,200,000 Not selected Not selected due to cost being greater than available budget.
69 MN80 Blacktop repaving Highway 80 from Highway 16 to Highway 52 $4,300,000 Not selected Not selected due to cost being greater than available budget.
69 MN76 Blacktop repaving Highway 76 from Caledonia to Houston $4,900,000 2027  
69 MN248 Future pavement project on Highway 248 from Altura to Highway 61 $5,600,000 Not selected Not selected due to cost being greater than available budget.
68 MN56 Future pavement project on Highway 56 from Highway 63 to Taopi, excluding Le Roy $7,000,000 Not selected Not selected due to cost being greater than available budget.
67 MN30 Future pavement project on Highway 30 from Steele County Road 45 to Highway 218 $3,900,000 Not selected Not selected due to cost being greater than available budget.
67 US63 Future pavement project on Highway 63 from Wabasha County Road 78 to Lake City $2,700,000 Not selected Not selected due to cost being greater than available budget.
58 MN57 Future pavement project on Highway 57 from Wanamingo to Highway 52 $2,100,000 Not selected  
43 MN19 Future pavement project on Highway 19 from Cannon Falls to Highway 61 $8,000,000 Not selected  
42 MN19 Future pavement project on Highway 19 from Highway 56 to Highway 52 $3,900,000 Not selected  
34 MN56 Future pavement project on Highway 56 from West Concord to Kenyon $4,700,000 Not selected  
0 MN292 Future pavement project on Highway 292 near US61 in Red Wing  $200,000 Not selected Not selected due to turnback negotiations.

 

Score Route  Description High-Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
95 US 218 Blacktop repaving Highway 218 from Iowa border to east of I-90  $3,200,000 2027  
95 MN 44 Blacktop repaving Highway 44 from Houston County Road 12 to Hokah  $2,900,000 2026  
95 MN 60 Blacktop repaving Highway 60 from east of Highway 13 to Highway 21  $4,700,000 2028  
95 US 14 Blacktop repaving Highway 14 from west of Highway 74 to Highway 61  $5,700,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
94 MN 13 Blacktop repaving Highway 13 from Highway 69 to Highway 30  $7,700,000 2030  
90 MN 74 Blacktop repaving Highway 74 from Highway 52 to east Highway 14  $3,500,000 2030
90 MN 58 Blacktop repaving Highway 58 from Highway 52 to 0.8 mi. S Goodhue County Road 5  $4,800,000 Not Selected Selected as an urban pavement project
89 MN 60 Blacktop repaving Highway 60 from Kenyon to Highway 52  $4,000,000 2029  
89 US 65 Future pavement project on Highway 65 from I-35 to Highway 13 in Albert Lea  $3,600,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
87 MN 247 Future pavement project on Highway 247 from Highway 63 to Plainview  $3,100,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
85 MN 30 Blacktop repaving Highway 30 from Highway 63 to Highway 52  $3,200,000 2024  
84 MN 44 Blacktop repaving Highway 44 from Spring Grove to Caledonia  $2,100,000 2026  
84 US 14 Blacktop repaving Highway 14  from Marion Road in Rochester to Olmsted County Road 19 west of Chester Woods Park  $2,400,000 2023  
83 MN 43/MN 16 Blacktop repaving Highway 43 from Highway 44 to Highway 16  $4,300,000 2023  
83 MN 16/US61 Blacktop repaving Highway 16 from Highway 44 in Hokah to Highway 26 and Highways 16 and 61 in La Crescent  $1,600,000 2025  
83 MN 246 SP 6614-28:  Blacktop repaving Highway 246 from Highway 3 to Nerstrand  $2,800,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
82 MN 56 Future pavement project on Highway 56 from Brownsdale to Highway 14  $4,900,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
82 MN 19 Future pavement project on Highway 19 from Cannon Falls to Highway 61  $4,000,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
79 MN 76 Blacktop repaving Highway 76 from Caledonia to Houston  $2,500,000 2026  
79 MN 248 Future pavement project on Highway 248 from Altura to Highway 61  $2,800,000 Not Selected Predicted RQI does not match on the ground conditions
78 MN 80 SP 2318-14:  Blacktop repaving Highway 80 from Highway 16 to Highway 52  $2,200,000 Not Selected  
78 MN 74 Blacktop repaving Highway 74 from Highway 14 to Elba  $2,500,000 2029  
78 MN 19 Future pavement project on Highway 19 from Highway 56 to Highway 52  $2,000,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
76 MN 30 Reclamation Highway 30 from Highway 218 in Blooming Prairie to Highway 56 in Hayfield  $3,300,000 2027  
76 MN 57 Reclamation Highway 57 from 11th Street in Kasson to Dodge County Road 30 near Wanamingo  $6,800,000 2028  
75 US 65 Blacktop repaving Highway 65 from Iowa border to I35  $2,200,000 2028  
74 MN 56 Future pavement project on Highway 56 from Highway 63 to Taopi, excluding Le Roy  $3,500,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
73 MN 246 Future pavement project on Highway 246 from Nerstrand to Highway 56  $2,300,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
73 MN 56 Future pavement project on Highway 56 from West Concord to Kenyon  $2,400,000 Not Selected Predicted RQI does not match on the ground conditions
72 MN 30 Future pavement project on Highway 30 from Steele County Road 45 to Highway 218  $2,000,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
71 MN 30 Blacktop repaving Highway 30 from Highway 13 to Ellendale  $2,200,000 2029  
71 US 63 Future pavement project on Highway 63 from Wabasha County Road 78 to Lake City  $1,400,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
67 MN 56 Blacktop repaving Highway 56 from Mower County Road 46 to Brownsdale  $1,100,000 Not Selected  
58 MN 57 Future pavement project on Highway 57 from Wanamingo to Highway 52  $1,100,000 Not Selected  
53 MN 19 Blacktop repaving Highway 19 from Highway 13 to Interstate 35  $3,100,000 2025  
45 MN 44 Future pavement project on Highway 44 from Highway 52 to Spring Grove  $3,200,000 Not Selected  
45 US 69 Future pavement project on Highway 69 from the Iowa border to Albert Lea  $3,100,000 Not Selected  
44 US 63 Future pavement project on Highway 63 at the north interchange with Highway 52  $200,000 Not Selected Not selected due to being a candidate for a future maintenance project and coordination with a future MnDOT project.
44 MN 43 Future pavement project on Highway 43 from Rushford to the west junction with I-90  $2,400,000 Not Selected  
39 MN 76 Blacktop repaving Highway 76 from Houston to I-90  $3,500,000 Not Selected Not a district priority. Will continue to monitor pavement performance 
36 MN 30 Future pavement project on Highway 30 from Highway 56 to Olmsted County Road 8  $4,800,000 Not Selected
0 MN 292 Highway 292  $100,000 Not Selected Not selected due to turnback negotiations.

Score Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
95 US218 Medium mill and overlay from Iowa border to east of I-90 $5,900,000 2026  
95 MN13 Medium mill and overlay Highway 69 to Highway 3 $11,000,000 2027  
95 MN57 Reclaim and overlay from 11th Street in Kasson to Dodge County Road 30 near Wanamingo $14,000,000 2027  
95 MN60 Medium mill and overlay from east of Highway 13 to Highway 21 $7,500,000 2028  
91 MN74 Medium mill and overlay from Highway 52 to east Highway 14 $6,300,000 2026  
85 Multiple Medium mill and overlay from Highway 44 to Highway 16 $8,900,000 2023  
85 MN19 Medium mill and overlay  from Highway 13 to Highway 3 $9,500,000 2025  
85 MN58 Medium mill and overlay from Highway 52 to 0.8 miles south of Goodhue County Road 5 $9,100,000 2028  
85 US63 Medium mill and overlay from Wabasha County Road 78 to Orchard Lane in Lake City $2,700,000 Not Selected Not a current district priority, continue to monitor pavement performance
84 MN19 Reclaim and overlay from Northfield to Highway 56 $11,000,000 Not Selected Not a current district priority, continue to monitor pavement performance
82 MN246 Medium mill and overlay from Highway 3 to Nerstrand $5,600,000 Not Selected Not a current district priority, continue to monitor pavement performance
81 MN44 Medium mill and overlay from Houston County Road 12 to Hokah $5,500,000 2024  
81 MN30 Medium mill and overlay from Highway 13 to Ellendale $4,600,000 2029
81 MN56 Medium mill and overlay from Goodhue County Road 10 to Kenyon $4,900,000 Not Selected Not a current district priority, continue to monitor pavement performance
80 MN16 Medium mill and overlay from Highway 44 to Highway 26 $1,600,000 Not Selected Not a current district priority, continue to monitor pavement performance
79 MN60 Medium mill and overlay from Kenyon to Highway 52 $8,100,000 2028  
78 MN80 Medium mill and overlay from Highway 16 to Highway 52 $4,400,000 2029  
78 MN76 Medium mill and overlay from Caledonia to Houston $5,800,000 2029
78 US14 Medium mill and overlay from west of Highway 74 to Highway 61 $11,000,000 Not Selected Not a current district priority, continue to monitor pavement performance
77 US63 Medium mill and overlay from Highway 52 to Olmsted County Road 154 $500,000 Not Selected Candidate for a preventive maintenance and waiting to coordinate with another MnDOT project.
75 US65 Medium mill and overlay from Iowa border to I-35 $4,000,000 2026
74 MN30 Medium mill and overlay from Highway 63 to Highway 52 $6,800,000 2024
73 MN246 Reclaim and overlay from Goodhue County Road 26 to Highway 56 $4,600,000 Not Selected
71 MN76 Medium mill and overlay from Houston to I-90 $7,100,000 Not Selected
71 US63 Thin overlay from Olmsted County Road 154 east to roundabout $800,000 Not Selected
68 MN74 Medium mill and overlay from Highway 14 to Elba $5,200,000 2029 Selected prior to policy (in 2019-2028 CHIP)
65 MN30 Full mill and replace from Highway 218 in Blooming Prairie to Highway 56 in Hayfield $6,700,000 2026 Selected prior to policy (in 2019-2028 CHIP)
65 MN56 Medium mill and overlay from Mower County Road 46 to Brownsdale $2,200,000 2029 Selected prior to policy (in 2019-2028 CHIP)
51 MN44 Medium mill and overlay from Spring Grove to Caledonia $3,900,000 2025 Selected prior to policy (in 2019-2028 CHIP)
44 MN44 Medium mill and overlay from Highway 52 to Spring Grove $6,500,000 Not Selected
36 MN57 Medium mill and overlay from Goodhue County Road 30 to Highway 52 $2,100,000 Not Selected
20 MN251 Medium mill and overlay from I-35 to Highway 218 $5,900,000 2020 Selected prior to policy (In 2019-2022 STIP)
20 MN292 Thick mill and overlay from south junction Highway 61 to Highway 61 $400,000 Not Selected