Scoring criteria for national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on network designation, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated December 2024

Score Route  Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
94 I94 Resurface I 94 from Sauk Centre to E of Melrose EB & WB $13,200,000 2032 7380-1038395
94 US169 US169, From 0.2 Miles South of Crow Wing CSAH 26 to 0.4 Miles South of JCT of MN18 in Garrison and f $8,100,000 2026 1804-90
91 MN23 Resurface MN 23, from 0.455 Mi E of93rd Ave to MN 15 in Waite Park eastbound and westbound $16,970,000 2028 7305-131
91 US169 Medium mill and overlay from Sherburne County Road 9 to Mille Lacs County Road 29 $4,300,000 Not Selected 
90 I94 Resurface I-94 from 2.5 Mi E of Freeport to 0.5 Mi E of Albany, EB & WB + Box 8849 $7,500,000 Not Selected 7380-1038339
87 MN25 Resurface from Morrison/Crow Wing county line to Jct MN 210 in Brainerd $6,012,000 Not Selected 1808-26
86 US10 Recondition US 10, from Gregory to the Halfway crossing (CR 40) EB & WB, J turn at Halfway Crossing $22,900,000 Not Selected 4901-82
86 US10 Little Falls bypass eastbound and westbound, includes first 0.5 miles of TH 371 $7,600,000 2025 4902-63
85 MN210 Resurface and upgrade urban section of MN 210 from Baxter Drive to end of 4-lane east of Brainerd. $46,790,000 2025, 2026 1805-80
85 MN23 MN 23, Resurface from MN 15 to RR Br near US 10 + ADA in St. Cloud, EB & WB $16,800,000 2029 7306-98
85 MN25 Resurface MN 25 from Bridge 86803 over I-94 in Monticello to US 10 in Big Lake,  includes ADA work $4,650,000 2030 7104-1038235 Cost includes urban portion
85 US10 Medium mill and overlay from Long Prairie River to 50th Ave $17,100,000 Not Selected
84 MN65 on MN thru Mora $24,860,000 2031 3307-44
83 US10 Resurface US 10 from 2 miles south of Cushing to North of Little Falls EB & WB $17,200,000 2031 4902-1038134
83 US169 Resurface US 169, from 1.5 M S of Long Siding to 1.75 miles north of Pease northbound and south boun $6,855,742 2025 4811-76
82 US10 Resurface US 10 from Halfway Crossing Cr 40 to Watab Rd Cr 4. $16,000,000 2033 0502-1090803
81 US71 Recondition US 71 from 0.4 Mi N of Alfred St in Wadena to Red Eye River in Sebeka $12,500,000 2032 8004-1038705
80 MN210 Resurface MN 210, from CSAH 1 S in Pillager to Cass/Morrison Co Line, Replace Br 8809 and construct $8,700,000 2027 1115-28
80 MN25 Resurface MN 25, from north Buffalo to south Monticello $15,490,000 2026 8605-54 Cost includes urban portion
80 US10 Resurface us 10 from Big Lake to Joplin Ave in Elk River eastbound and westbound, includes ADA work (Rural Only) $26,413,251 2029 7102-146
80 US10 This project will address and improve existing transportation deficiencies, corridor performance, ac $55,346,618 Prior, 2025 8001-44
80 MN371 Resurface MN 371 From 0.7 M N of CSAH 48 to CSAH 27, SB only. $7,400,000 2034 1809-1124423
79 MN23 MN 23, Resurface from 1.1 Mi E of CSAH 12 West of Richmond to 0.5 miles East of 93rd Ave EB & WB, Mill and Overlay $17,000,000 2031 7305-1038942
78 MN101 Resurface MN 101, from Wright/Hennepin county line (Crow River) to Wright county road 38 in Otsego northbound and southbound,  includes interchange ramps $2,500,000 8608-33
78 MN95 Resurface MN 95 from 0.2 Mi West of CR 14 to Fern St in Cambridge $3,600,000 2033 3006-1101183
78 US10 Resurface US 10 from 4th St to Jarvis/Cleveland Ave in Elk River $10,000,000 2033 7102-1101165
77 US10 Resurface US 10 from 1.2 Mi East of MN 23 in St Cloud to 0.15 Mi W of MN 24 in Clear Lake (EB only) $16,800,000 2033 7103-1090823
77 US71 US 71, Recondition from 4th St N in Sauk Centre to 0.1 M N of 230th St in Long Prairie $15,500,000 2029 7319-43
77 US71 Resurface US 71 from 0.1 Mi S of CSAH 24 in Bertha to Todd/Wadena County Line. $4,100,000 2031 7709-1101163
77 US71 Resurface US 71 from Todd/Wadena county line to Franklin Ave in Wadena $3,300,000 2029 8003-39
77 US71 Resurface US 71 from 0.1 Mi S of CSAH 24 in Bertha to Todd/Wadena County Line. $1,920,000 2033 8005-1124364
76 MN28 Resurface MN 28 from Pope/Stearns Co Line to S Jct US 71 near Sauk Centre $7,700,000 2033 7307-1090863
76 MN55 MN 55, from Jct MN 25 to end of 4 lane in Buffalo, mill and overlay + Replace Box 90676 & Fiber $8,300,000 2032 8607-64
76 US169 Resurface Northbound US 169 from 0.7 M N of CSAH 19 to 1 M N of CR 103/CR 19 $5,700,000 2033 4812-1101244
75 US169 Resurface US 169 from 1 Mi N of CR 103 to 0.7 Mi N of Ojibwe Drive $16,000,000 2032 4812-1090843 Cost includes urban portion
74 US169 Resurface US 169 from S Jct CSAH 36 to Mille Lacs County CSAH 11 northbound and southbound + overlay Br 48005,48006, 448019, & 48020 $12,900,000 2031 4811-1038948
73 MN23 Medium mill and overlay from D3/D8 border to 1.1 miles east of Stearns County Road 12 $4,600,000 Not Selected 
73 US169 Resurface Southbound US 169 from 0.1 M N of Mike Drew Brook to 0.05 M S of RP 204 $4,000,000 2033 4812-1101243
73 MN25 Resurface MN 25 from Davidson Ave NE to I-94 in Monticello $3,200,000 2034 8605-1124883
72 MN27 Resurface MN 27 from 9th St NE  to 19th St NE in Little Falls, includes ADA work & Br work $7,000,000 2030 4904-49
72 US169 Resurface US 169 from S Aitkin County Line to Jct Westwood Dr in Aitkin $8,000,000 2034 0115-1124723
72 US169 Resurface US 169 from R.P. 161 to 0.14 Mi S of CSAH 4 (NB & SB) $8,000,000 2034 7106-1111813
71 US10 Resurface US 10 from Oink Joint road to West limits of Staples EB & WB $18,000,000 2034 8001-1038779
70 US71 Recondition US 71 from N End of Redeye River Bridge in Sebeka to 3rd St SE in Menahga $15,200,000 2028 8005-22 The cost includes the urban portion.  This project also includes a segment of TH87.
69 US71 Resurface US 71 (Urban) from 0.1 Mi N of 230th Ave to 0.4 Mi N of CR 56/MN 27 in Long Prairie $5,200,000 2032 7707-1073723
68 MN210 Reconstruct MN 210 from 0.25 Mi E of 3rd Ave E in Crosby to 0.4 Mi E Jct MN 6 in Deerwood + ADA work in Deerwood $10,720,000 2029 1807-33 This cost includes the urban portion
66 US10 Resurface US 10 from West Staples to East Staples $4,000,000 2029 7702-55
65 MN201 Resurface MN 210, from Jct US 71 in Hewitt to US 10 in Staples, includes ADA work $12,200,000 2030 7701-41
65 MN95 Resurface MN 95 from Davis St to 0.2 M East of CSAH 2 in Cambridge + Safety Improvements $3,300,000 2033 3007-1101184
65 MN23 Resurface MN 23 from MN 47 to MN 65 $3,400,000 2033 3301-1124346
65 MN371 Resurface MN 371 from 0.1 Mi N of CSAH 2 to 430 ft N of S Jct MN 87 in Backus $5,300,000 2032 1117-1111812
60 I94 Recondition I-94 from Douglas/Todd Co line to E US 71 Ramp in Sauk Centre (WB only) $8,000,000 2034 7780-1111943
60 US10 Reconstruct US thru Royalton including J-Turns $15,500,000 2034 4901-1111807
60 US71 Recondition US 71 from Kandiyohi/Stearns Co line to W Jct MN 55 in Belgrade $2,800,000 2034 7317-1111924
60 US71 Resurface US 71 from S Limits to N Limits of Elrosa and Recondition from N Limits Elrosa to I-94 $12,000,000 2034 7318-1111926
60 I94 Resurface I -94 from E end Br's 73865 & 73866 1.5 Mi W of MN 23 to W end Br's 73853 & 73854 over CSAH 75 (EB & WB) $10,500,000 2034 7380-1111783
60 MN23 Concrete Rehab on MN 23, Paynesville bypass $8,700,000 2034 7304-1111809
59 I94 Recondition I-94 from East limits of Albany East to Stearns CR 159 at Collegeville EB & WB $19,700,000 Not Selected 7380-1038941
57 US12 Resurface US 12 from 0.1 Mi N of Bridge Ave to 0.2 Mi E of CR 139 in Delano + ADA work $18,000,000 2030 8602-54
57 US71 Resurface US 71 from Franklin Ave to Aldrich Ave and from Elm Ave to 0.4 miles north of Alfred Street $8,526,290 2025 8003-37
54 US169 From Mississippi River Br to Hwy 200 in Hill City $34,000,000 Not Selected 0116-51
53 MN23 MN 23 in Milaca, urban reconstruction $19,500,000 2027 4801-26
53 MN371 Recondition MN 371 from Junction MN 210 in Baxter to South of Nisswa, NB & SB $20,900,000 2032 1810-118
53 US71 US 71, from I-94 to north Sauk Centre with bridge #5428 over Sauk River, urban reconstruction $26,400,000 2028 7319-42
51 US10 Reconstruct US 10 from 0.3 M West of MN 25 to 0.2 M East of Eagle Lake Rd in Big Lake including ADA $9,000,000 2029 7102-148
50 MN23 Resurface MN23 from JCT MN 25 to JCT Benton CR 53 in Foley $1,100,000 2030 0504-1090563
46 MN101 Concrete pavement repair from CSAH 38 to JCT US 10 in Elk River $4,100,000 2030 8608-1090583
45 US12 From 13th Ave in Howard Lake to 0.1 MI E of Zephyr Ave in Montrose $9,620,000 2025 8601-62
44 MN371 Resurface 0.4 M N of US 10 to 0.7 M N of CSAH 48, NB & SB $8,820,000 2034 1809-1124424
40 I94 Resurface I-94 from Melrose to E 2.5 Mi E of Freeport (EB & WB) $11,100,000 2031 7380-1038876
35 MN371 Resurface MN 371 from 0.3 Mi North of Crow Wing CSAH 16 to 0.1 Mi North of Cass CSAH 2 $5,900,000 2029 1116-29
32 US10 Resurface US 10, from west Motley to the Long Prairie river east Motley $3,000,000 2031 4903-73
30 MN25 Resurface MN 25 from 0.1 Mi S of 1st St to 0.2 Mi N of 14th St in Buffalo $3,900,000 2033 8604-1073843
23 MN210 Crack seal and thick overlay from Pillager to Baxter city limits $5,800,000 Not Selected

 

Previous years

Score Route  Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
94 I94 Resurface I 94 from Sauk Centre to E of Melrose EB & WB $11,032,000 2031 7380-1038395
94 US169 US169, From 0.2 Miles South of Crow Wing CSAH 26 to 0.4 Miles South of JCT of MN18 in Garrison and f $7,500,000 2026 1804-90
91 MN23 Resurface MN 23, from 0.455 Mi E of93rd Ave to MN 15 in Waite Park eastbound and westbound $12,985,000 2028 7305-131
91 US169 Medium mill and overlay from Sherburne County Road 9 to Mille Lacs County Road 29 $4,300,000 Not Selected 
90 I94 Resurface I-94 from 2.5 Mi E of Freeport to 0.5 Mi E of Albany, EB & WB + Box 8849 $7,500,000 2032 7380-1038339
87 MN25 Resurface from Morrison/Crow Wing county line to Jct MN 210 in Brainerd $6,012,000 Not Selected 1808-26
86 US10 Recondition US 10, from Gregory to the Halfway crossing (CR 40) EB & WB, J turn at Halfway Crossing $22,900,000 2027 4901-82
86 US10 Little Falls bypass eastbound and westbound, includes first 0.5 miles of TH 371 $7,600,000 2025 4902-63
85 MN210 Resurface and upgrade urban section of MN 210 from Baxter Drive to end of 4-lane east of Brainerd. $856,973 2028 1805-1090623
85 MN210 Resurface and upgrade urban section of MN 210 from Baxter Drive to end of 4-lane east of Brainerd. $41,450,000 2026 1805-80
85 MN23 MN 23, Resurface from MN 15 to RR Br near US 10 + ADA in St. Cloud, EB & WB $7,200,000 2029 7306-98
85 MN25 Resurface MN 25 from Bridge 86803 over I-94 in Monticello to US 10 in Big Lake,  includes ADA work $4,740,000 2030 7104-1038235
85 US10 Medium mill and overlay from Long Prairie River to 50th Ave $17,100,000 Not Selected
84 MN65 on MN thru Mora $23,300,000 2030 3307-44
83 US10 Resurface US 10 from 2 miles south of Cushing to North of Little Falls EB & WB $14,700,000 2031 4902-1038134
83 US169 Resurface US 169, from 1.5 M S of Long Siding to 1.75 miles north of Pease northbound and south boun $7,200,000 2025 4811-76
82 US10 Resurface US 10 from Halfway Crossing Cr 40 to Watab Rd Cr 4. $15,700,000 2032 0502-1090803
81 US71 Recondition US 71 from 0.4 Mi N of Alfred St in Wadena to Red Eye River in Sebeka $10,750,000 2031 8004-1038705
80 MN210 Resurface MN 210, from CSAH 1 S in Pillager to Cass/Morrison Co Line, Replace Br 8809 and construct $7,600,000 2027 1115-28
80 MN25 Resurface MN 25, from north Buffalo to south Monticello $13,900,000 2026 8605-54 Cost includes urban portion
80 US10 Resurface us 10 from Big Lake to Joplin Ave in Elk River eastbound and westbound, includes ADA work (Rural Only) $27,570,000 2029 7102-146
80 US10 This project will address and improve existing transportation deficiencies, corridor performance, ac $52,300,000 Prior, 2025 8001-44
79 MN23 MN 23, Resurface from 1.1 Mi E of CSAH 12 West of Richmond to 0.5 miles East of 93rd Ave EB & WB, Mill and Overlay $15,000,000 2030 7305-1038942
78 MN101 Resurface MN 101, from Wright/Hennepin county line (Crow River) to Wright county road 38 in Otsego northbound and southbound,  includes interchange ramps $2,500,000 8608-33
78 MN23 from 250' E of CSAH 2 (105th Ave) E of Milaca to the Ground House river 300 ft E of Jct 47 S $7,194,000 2024 4802-25
78 MN95 Resurface MN 95 from 0.2 Mi West of CR 14 to Fern St in Cambridge $550,000 2032 3006-1101183
78 US10 Resurface US 10 from 4th St to Jarvis/Cleveland Ave in Elk River $6,100,000 2032 7102-1101165
77 US10 Resurface US 10 from 1.2 Mi East of MN 23 in St Cloud to 0.15 Mi W of MN 24 in Clear Lake (EB only) $18,490,000 2032 7103-1090823
77 US71 US 71, Recondition from 4th St N in Sauk Centre to 0.1 M N of 230th St in Long Prairie $14,110,000 2029 7319-43
77 US71 Resurface US 71 from 0.1 Mi S of CSAH 24 in Bertha to Todd/Wadena County Line. $4,950,000 2032 7709-1101163
77 US71 Resurface US 71 from Todd/Wadena county line to Franklin Ave in Wadena $3,246,000 2029 8003-39
76 MN28 Resurface MN 28 from Pope/Stearns Co Line to S Jct US 71 near Sauk Centre $6,200,000 2032 7307-1090863
76 MN55 MN 55, from Jct MN 25 to end of 4 lane in Buffalo, mill and overlay + Replace Box 90676 & Fiber $5,400,000 2031 8607-64
76 US169 Resurface Northbound US 169 from 0.7 M N of CSAH 19 to 1 M N of CR 103/CR 19 $4,700,000 2032 4812-1101244
75 US169 Resurface US 169 from 1 Mi N of CR 103 to 0.7 Mi N of Ojibwe Drive $12,890,000 2033 4812-1090843 Cost includes urban portion
74 US169 Resurface US 169 from S Jct CSAH 36 to Mille Lacs County CSAH 11 northbound and southbound + overlay Br 48005,48006, 448019, & 48020 $9,400,000 2031 4811-1038948
74 US169 MnDOT will resurface and improve seven miles of Hwy 169 between Crow Wing Co. Rd. 26 south of Garris $4,484,027 2024 4814-56
73 MN23 Medium mill and overlay from D3/D8 border to 1.1 miles east of Stearns County Road 12 $4,600,000 Not Selected 
73 US169 Concrete Pavement Rehab on US 169 from 0.05 M S of RP 204 to 1 M North of CR 103, Southbound only. $4,600,000 Not Selected 4812-1101123
73 US169 Resurface Southbound US 169 from 0.1 M N of Mike Drew Brook to 0.05 M S of RP 204 $4,700,000 2032 4812-1101243
72 MN27 Resurface MN 27 from 9th St NE  to 19th St NE in Little Falls, includes ADA work & Br work $2,000,000 2027 4904-49
72 US169 Resurface US 169 from R.P. 161 to 0.14 Mi S of CSAH 4 (NB & SB) $10,520,000 2033 7106-1111813
71 US10 Resurface US 10 from Oink Joint road to West limits of Staples EB & WB $15,900,000 2033 8001-1038779
70 US71 Recondition US 71 from N End of Redeye River Bridge in Sebeka to 3rd St SE in Menahga $9,008,000 2028 8005-22 The cost includes the urban portion.  This project also includes a segment of TH87.
69 US71 Resurface US 71 (Urban) from 0.1 Mi N of 230th Ave to 0.4 Mi N of CR 56/MN 27 in Long Prairie $1,500,000 2031 7707-1073723
68 MN210 Reconstruct MN 210 from 0.25 Mi E of 3rd Ave E in Crosby to 0.4 Mi E Jct MN 6 in Deerwood + ADA work in Deerwood $2,530,000 2029 1807-33 This cost includes the urban portion
66 US10 Resurface US 10 from West Staples to East Staples $2,848,000 2029 7702-55
65 MN201 Resurface MN 210, from Jct US 71 in Hewitt to US 10 in Staples, includes ADA work $14,100,000 2029 7701-41
65 MN95 Resurface MN 95 from Davis St to 0.2 M East of CSAH 2 in Cambridge + Safety Improvements $5,500,000 2032 3007-1101184
65 MN371 Resurface MN 371 from 0.1 Mi N of CSAH 2 to 430 ft N of S Jct MN 87 in Backus $5,410,000 2033 1117-1111812
60 I94 Recondition I-94 from Douglas/Todd Co line to E US 71 Ramp in Sauk Centre (WB only) $7,900,000 2033 7780-1111943
60 US10 Reconstruct US thru Royalton including J-Turns $17,000,000 2033 4901-1111807
60 US71 Recondition US 71 from Kandiyohi/Stearns Co line to W Jct MN 55 in Belgrade $2,800,000 2033 7317-1111924
60 US71 Resurface US 71 from S Limits to N Limits of Elrosa and Recondition from N Limits Elrosa to I-94 $11,000,000 2033 7318-1111926
60 I94 Resurface I -94 from E end Br's 73865 & 73866 1.5 Mi W of MN 23 to W end Br's 73853 & 73854 over CSAH 75 (EB & WB) $14,614,000 2033 7380-1111783
60 MN23 Concrete Rehab on MN 23, Paynesville bypass $8,400,000 2033 7304-1111809
59 I94 Recondition I-94 from East limits of Albany East to Stearns CR 159 at Collegeville EB & WB $19,700,000 Not Selected 7380-1038941
57 US12 Resurface US 12 from 0.1 Mi N of Bridge Ave to 0.2 Mi E of CR 139 in Delano + ADA work $11,000,000 2029 8602-54
57 US71 Resurface US 71 from Franklin Ave to Aldrich Ave and from Elm Ave to 0.4 miles north of Alfred Street $7,300,000 2025 8003-37
54 US169 From Mississippi River Br to Hwy 200 in Hill City $34,000,000 2027 0116-51
53 MN23 MN 23 in Milaca, urban reconstruction $18,800,000 2027 4801-26
53 MN371 Recondition MN 371 from Junction MN 210 in Baxter to South of Nisswa, NB & SB $19,200,000 2031 1810-118
53 US71 US 71, from I-94 to north Sauk Centre with bridge #5428 over Sauk River, urban reconstruction $25,100,000 2028 7319-42
51 US10 Reconstruct US 10 from 0.3 M West of MN 25 to 0.2 M East of Eagle Lake Rd in Big Lake including ADA $8,000,000 2029 7102-148
50 MN23 Resurface MN23 from JCT MN 25 to JCT Benton CR 53 in Foley $1,000,000 2030 0504-1090563
46 MN101 Concrete pavement repair from CSAH 38 to JCT US 10 in Elk River $3,700,000 2030 8608-1090583
45 US12 From 13th Ave in Howard Lake to 0.1 MI E of Zephyr Ave in Montrose $9,200,000 2025 8601-62
44 MN371 Medium mill and overlay from US10 to county Road 48 $9,450,000 Not Selected
40 I94 Resurface I-94 from Melrose to E 2.5 Mi E of Freeport (EB & WB) $9,050,000 2030 7380-1038876
35 MN371 Resurface MN 371 from 0.3 Mi North of Crow Wing CSAH 16 to 0.1 Mi North of Cass CSAH 2 $5,200,000 2029 1116-29
32 US10 Resurface US 10, from west Motley to the Long Prairie river east Motley $2,700,000 2030 4903-73
30 MN25 Resurface MN 25 from 0.1 Mi S of 1st St to 0.2 Mi N of 14th St in Buffalo $2,250,000 2032 8604-1073843
23 MN210 Crack seal and thick overlay from Pillager to Baxter city limits $5,800,000 Not Selected
9 MN25 Medium mill and overlay from Sherburne County Road 17 to 1.1 miles south east of US10 $4,740,000 Not Selected Cost includes urban portion

Score Route  Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
94 I94 Resurface I 94 from Sauk Centre to E of Melrose EB & WB $9,900,000 2030 7380-1038395
94 US169 US169, From 0.2 Miles South of Crow Wing CSAH 26 to 0.4 Miles South of JCT of MN18 in Garrison and f $5,000,000 2025 1804-90
93 I94 Unbonded overlay from MNROAD facility to Wright County Road 19 $6,850,000 Not Selected
91 MN23 Resurface MN 23, from 0.455 Mi E of93rd Ave to MN 15 in Waite Park eastbound and westbound $12,420,000 2027 7305-131
91 US169 Medium mill and overlay from Sherburne County Road 9 to Mille Lacs County Road 29 $4,300,000 Not Selected 
90 I94 Resurface I-94 from 2.5 Mi E of Freeport to 0.5 Mi E of Albany, EB & WB + Box 8849 $6,600,000 2031 7380-1038339
87 MN25 Resurface from Morrison/Crow Wing county line to Jct MN 210 in Brainerd $9,225,000 2030 1808-26
86 US10 Recondition US 10, from Gregory to the Halfway crossing (CR 40) EB & WB, J turn at Halfway Crossing $15,900,000 2027 4901-82
86 US10 Little Falls bypass eastbound and westbound, includes first 0.5 miles of TH 371 $7,600,000 2027 4902-63
85 MN210 Resurface and upgrade urban section of MN 210 from Baxter Drive to end of 4-lane east of Brainerd. $13,600,000 2027 1805-1090623
85 MN210 Resurface and upgrade urban section of MN 210 from Baxter Drive to end of 4-lane east of Brainerd. $30,150,000 2026 1805-80
85 MN23 MN 23, Resurface from MN 15 to RR Br near US 10 + ADA in St. Cloud, EB & WB $7,155,000 2029 7306-98
85 MN25 Resurface MN 25 from Bridge 86803 over I-94 in Monticello to US 10 in Big Lake,  includes ADA work $4,740,000 2030 7104-1038235
85 MN288 FROM 0.4 M WEST OF MONTICELLO TO 0.4 M EAST OF CSAH 37 $6,850,000 2024 8680-189
85 US10 Medium mill and overlay from Long Prairie River to 50th Ave $17,100,000 Not Selected
84 MN65 on MN thru Mora $11,590,000 2030 3307-44
83 US10 Resurface US 10 from 2 miles south of Cushing to North of Little Falls EB & WB $12,400,000 2030 4902-1038134
83 US169 Resurface US 169, from 1.5 M S of Long Siding to 1.75 miles north of Pease northbound and south boun $7,200,000 2025 4811-76
82 US10 Resurface US 10 from Halfway Crossing Cr 40 to Watab Rd Cr 4. $12,700,000 2031 0502-1090803
81 US10 Medium mill and overlay from 2.7 miles west of MN371 to Morrison County Road 35 $5,300,000 Not Se;ected
81 US12 Resurface US 12 from 0.2 MI E of 6th Ave in Howard Lake to 0.14 MI E of CR 110 in Montrose, excluding urban areas. $2,692,722 2023 8601-70
81 US71 Recondition US 71 from 0.4 Mi N of Alfred St in Wadena to Red Eye River in Sebeka $9,900,000 2029 8004-1038705
80 MN210 Resurface MN 210, from CSAH 1 S in Pillager to Cass/Morrison Co Line, Replace Br 8809 and construct $4,350,000 2027 1115-28
80 MN25 Resurface MN 25, from north Buffalo to south Monticello $13,900,000 2026 8605-54 Cost includes urban portion
80 US10 Resurface us 10 from Big Lake to Joplin Ave in Elk River eastbound and westbound, includes ADA work (Rural Only) $27,870,000 2028 7102-146
80 US10 This project will address and improve existing transportation deficiencies, corridor performance, ac $35,000,000 Prior, 2025 8001-44
79 MN23 MN 23, Resurface from 1.1 Mi E of CSAH 12 West of Richmond to 0.5 miles East of 93rd Ave EB & WB, Mill and Overlay $16,425,000 2030 7305-1038942
78 MN101 Resurface MN 101, from Wright/Hennepin county line (Crow River) to Wright county road 38 in Otsego northbound and southbound,  includes interchange ramps $2,500,000 2027 8608-33
78 MN23 from 250' E of CSAH 2 (105th Ave) E of Milaca to the Ground House river 300 ft E of Jct 47 S $6,800,000 2024 4802-25
78 MN95 Resurface MN 95 from 0.2 Mi West of CR 14 to Fern St in Cambridge $550,000 2032 3006-1101183
78 US10 Resurface US 10 from 4th St to Jarvis/Cleveland Ave in Elk River $6,100,000 2032 7102-1101165
77 US10 Resurface US 10 from 1.2 Mi East of MN 23 in St Cloud to 0.15 Mi W of MN 24 in Clear Lake (EB only) $6,490,000 2032 7103-1090823
77 US71 US 71, Recondition from 4th St N in Sauk Centre to 0.1 M N of 230th St in Long Prairie $13,630,000 2029 7319-43
77 US71 Resurface US 71 from 0.1 Mi S of CSAH 24 in Bertha to Todd/Wadena County Line. $4,500,000 2032 7709-1101163
77 US71 Resurface US 71 from Todd/Wadena county line to Franklin Ave in Wadena $3,000,000 2027 8003-39
76 MN28 Resurface MN 28 from Pope/Stearns Co Line to S Jct US 71 near Sauk Centre $6,200,000 2032 7307-1090863
76 MN55 MN 55, from Jct MN 25 to end of 4 lane in Buffalo, mill and overlay + Replace Box 90676 & Fiber $5,120,000 2029 8607-64
76 US169 Resurface Northbound US 169 from 0.7 M N of CSAH 19 to 1 M N of CR 103/CR 19 $4,700,000 2032 4812-1101244
75 US169 Resurface US 169 from 1 Mi N of CR 103 to 0.7 Mi N of Ojibwe Drive $12,890,000 2032 4812-1090843 Cost includes urban portion
74 US169 Resurface US 169 from S Jct CSAH 36 to Mille Lacs County CSAH 11 northbound and southbound + overlay Br 48005,48006, 448019, & 48020 $7,500,000 2031 4811-1038948
74 US169 MnDOT will resurface and improve seven miles of Hwy 169 between Crow Wing Co. Rd. 26 south of Garris $4,200,000 2024 4814-56
73 MN23 Medium mill and overlay from D3/D8 border to 1.1 miles east of Stearns County Road 12 $4,600,000 Not Selected 
73 US169 Concrete Pavement Rehab on US 169 from 0.05 M S of RP 204 to 1 M North of CR 103, Southbound only. $4,600,000 2032 4812-1101123
73 US169 Resurface Southbound US 169 from 0.1 M N of Mike Drew Brook to 0.05 M S of RP 204 $4,700,000 2032 4812-1101243
72 MN27 Resurface MN 27 from 9th St NE  to 19th St NE in Little Falls, includes ADA work & Br work $1,100,000 2028 4904-49
71 US10 Resurface US 10 from Oink Joint road to West limits of Staples EB & WB $15,900,000 2031 8001-1038779
70 US71 Recondition US 71 from N End of Redeye River Bridge in Sebeka to 3rd St SE in Menahga $7,660,000 2027 8005-22 The cost includes the urban portion.  This project also includes a segment of TH87.
69 US71 Resurface US 71 (Urban) from 0.1 Mi N of 230th Ave to 0.4 Mi N of CR 56/MN 27 in Long Prairie $1,500,000 2031 7707-1073723
68 MN210 Reconstruct MN 210 from 0.25 Mi E of 3rd Ave E in Crosby to 0.4 Mi E Jct MN 6 in Deerwood + ADA work in Deerwood $4,030,000 2028 1807-33 This cost includes the urban portion
67 US169 Pavement preservation on Hwy 169 from Mississippi River Br to Hwy 200 in Hill City $10,300,000 2027 0116-52
66 US10 Resurface US 10 from West Staples to East Staples $2,848,000 2028 7702-55
65 MN201 Resurface MN 210, from Jct US 71 in Hewitt to US 10 in Staples, includes ADA work $12,700,000 2029 7701-41
65 MN95 Resurface MN 95 from Davis St to 0.2 M East of CSAH 2 in Cambridge + Safety Improvements $4,740,000 2032 3007-1101184
59 I94 Recondition I-94 from East limits of Albany East to Stearns CR 159 at Collegeville EB & WB $19,700,000 2031 7380-1038941
57 US12 Resurface US 12 from 0.1 Mi N of Bridge Ave to 0.2 Mi E of CR 139 in Delano + ADA work $2,900,000 2028 8602-54
57 US71 Resurface US 71 from Franklin Ave to Aldrich Ave and from Elm Ave to 0.4 miles north of Alfred Street $7,300,000 2025 8003-37
54 US169 From Mississippi River Br to Hwy 200 in Hill City $1,233,000 2027 0116-51
53 MN23 MN 23 in Milaca, urban reconstruction $19,800,000 2026 4801-26
53 MN371 Recondition MN 371 from Junction MN 210 in Baxter to South of Nisswa, NB & SB $16,400,000 2031 1810-118
53 US71 US 71, from I-94 to north Sauk Centre with bridge #5428 over Sauk River, urban reconstruction $24,100,000 2027 7319-42
51 US10 Reconstruct US 10 from 0.3 M West of MN 25 to 0.2 M East of Eagle Lake Rd in Big Lake including ADA $7,808,000 2029 7102-148
50 MN23 Resurface MN23 from JCT MN 25 to JCT Benton CR 53 in Foley $1,000,000 2030 0504-1090563
46 MN101 Concrete pavement repair from CSAH 38 to JCT US 10 in Elk River $3,700,000 2030 8608-1090583
45 US12 From 13th Ave in Howard Lake to 0.1 MI E of Zephyr Ave in Montrose $7,300,000 2025 8601-62
44 MN371 Medium mill and overlay from US10 to county Road 48 $9,450,000 Not Selected
40 I94 Resurface I-94 from Melrose to E 2.5 Mi E of Freeport (EB & WB) $8,500,000 2030 7380-1038876
35 MN371 Resurface MN 371 from 0.3 Mi North of Crow Wing CSAH 16 to 0.1 Mi North of Cass CSAH 2 $4,230,000 2028 1116-29
32 US10 Resurface US 10, from west Motley to the Long Prairie river east Motley $2,700,000 2029 4903-73
30 MN25 Resurface MN 25 from 0.1 Mi S of 1st St to 0.2 Mi N of 14th St in Buffalo $2,250,000 2031 8604-1073843
23 MN210 Crack seal and thick overlay from Pillager to Baxter city limits $5,800,000 Not Selected
9 MN25 Medium mill and overlay from Sherburne County Road 17 to 1.1 miles south east of US10 $4,740,000 Not Selected

Score Route  Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
100 I94 Medium mill and overlay from US71 to Melrose $9,820,000 2029  
93 I94 Unbonded overlay from MNROAD facility to Wright County Road 19 $6,850,000 2026  
91 US169 Medium mill and overlay from Sherburne County Road 9 to Mille Lacs County Road 29 $4,300,000 Not Selected  New Project
90 US10 Medium mill and overlay from 1.2 miles east of Morrison County Road 11 to 2.7 miles west of MN 371 $12,400,000 2029  
90 I94 Medium mil and overlay from 2.5 miles east of Freeport to Albany city limits. $6,200,000 2027  
90 I94 Medium mill and overlay from Melrose to 2.5 miles east of Freeport $8,400,000 2029  
89 US10 Medium mill and overlay from west of Oink Joint Rd to Staples western City limits $15,900,000 2031
87 US10 Thick mill and overlay from Morrison County Road 35 to Benton County Road 40 $13,700,000 2027  
86 MN210 Medium mill and overlay from US10 to Cass County Road 1 $4,400,000 2027  
85 US10 Medium mill and overlay from Long Prairie River to 50th Ave $17,100,000 2029  
85 MN15 Medium mill and overlay from Stearns County Road 47 to MN23 $12,000,000 2031 Part of Urban project
84 MN371 Medium mill and overlay from Crow Wing County Road 77 to Hazlewood Dr $15,650,000 2030 The cost includes the urban portion
82 US10 Medium mill and overlay from Benton County Road 40 to Benton County Road 33 $12,700,000 2031
81 US10 Medium mill and overlay from 2.7 miles west of MN371 to Morrison County Road 35 $5,300,000 2025  
81 US12 Medium mill and overlay from 13th Ave to 1.1 miles west of MN25 $3,100,000 2022  
81 US71 Cold in place recycling and medium overlay from Elm Ave to end of Redeye River $9,800,000 2027  
80 MN210 Medium mill and overlay from Crow Wing River to US10 $10,200,000 2026  
79 MN23 Medium mill and overlay from Stearns County Road 12 to end of Bypass $15,025,000 2030  
78 MN23 Medium mill and overlay from 105th Ave to 1.1 miles west of MN47 $5,400,000 2024  
78 US169 Medium mill and overlay from Mississippi River Bridge to MN200 $12,100,000 Not Selected  Part D1 Funding
77 MN23 Medium mill and overlay from 93rd Ave to 10th Ave $9,920,000 2026 The cost includes the urban portion
77 US10 Thick mill and overlay eastbound lanes from 1.2 miles east of MN23 to MN24 $6,500,000 2031
77 MN65 Medium mill and overlay from Ann River to MN23 $4,500,000 2029 Cost includes urban portion
77 US71 Medium mill and overlay from the Todd/Wadena County Line to Franklin Ave $3,000,000 2027  
77 US71 Cold in place recycling and medium overlay from 4th St to 230th St $11,630,000 2029  
76 MN28 Thick mill and overlay from Pope/Stearns County Line to US71 $6,200,000 2031
75 US169 Medium mill and overlay from 1 mile north of Mille Lacs County Road 103 to Ojibwe Dr $13,000,000 2031 Cost includes urban portion
74 US169 Medium mill and overlay from Ojibwe Dr to Garrison $3,500,000 2024  
73 MN23 Medium mill and overlay from D3/D8 border to 1.1 miles east of Stearns County Road 12 $4,600,000 Not Selected  New Project
73 US169 Medium mill and overlay from 2.3 miles south of MN23 to Mike Drew Brook $7,500,000 2030  
70 MN23 Medium mill and overlay from MN23 to bridge 48030 $15,100,000 2022 Cost includes urban portion
68 MN210 Medium mill and overlay from east end of Hospital parking lot to MN6 $2,630,000 2027 This cost includes the urban portion
67 US169 Medium mill and overlay from Mike Drew Brook to Mille Lacs County Road 103 $12,100,000 Not Selected  New Project
66 MN25 Reclaim and overlay from 1.6 miles north of MN55 to Monticello southern city limits $8,100,000 2026 Cost includes urban portion
66 US71 Medium mill and overlay from Redeye River Bridge to Blueberry River Bridge  $7,700,000 2027 The cost includes the urban portion.  This project also includes a segment of TH87.
66 MN371B Medium mill and overlay from Ostrowski st to Joseph St $6,100,000 2022 Also shown on the Urban list, since there is some city work.
60 I94 Reclaim and overlay from Albany eastern City limits to Stearns County Road 159 $14,400,000 2030  
51 US10 Unbonded overlay from Eagle Lake Rd to Joplin St $21,000,000 2028  
51 US169 Medium mill and overlay from Mille Lacs County Road 29 to 2.4 miles south of MN23 $6,100,000 2025  
44 MN371 Medium mill and overlay from US10 to county Road 48 $9,450,000 2031
23 MN210 Crack seal and thick overlay from Pillager to Baxter city limits $5,800,000 2031
9 MN25 Medium mill and overlay from Sherburne County Road 17 to 1.1 miles south east of US10 $4,740,000 2030 Cost includes urban portion

 

Score Route  Description  High Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
100 I94 Mill and overlay from east of Melrose to east of Freeport $8,400,000 2029  
94 I94 Mill and overlay from Hwy 71/Sauk Centre to East of Melrose $9,900,000 2029  
92 MN15 Mill and overlay from Stearns County Road 47 to Stearns County Road 33 entrance Ramp $12,000,000 2030  
91 MN23 Mill and overlay from bypass to Jct Hwy 15 $10,000,000 2026  
90 I94 Mill and and overlay from east of Freeport to eastern limits of Albany $6,200,000 2027  
88 MN23 Mill and overlay from Hwy 15 to west of 4th ave South $5,600,000 2027  
87 US 12 Mill and overlay from Howard Lake to 72nd st in Delano $2,800,000 2022  
86 US 10 Mill and overlay from west of Hwy 371 to Morrison County Road 35 $5,800,000 2025  
86 US 10 Mill and overlay from Morrison County Road 35 to Benton County Road 40 $15,200,000 2027  
85 MN25 Mill and overlay from I-94 bridge to Jct Hwy10 $4,300,000 2028  
85 MN210 Reconstruction from end of River bridge in Brainerd to east of Hwy 25 $18,400,000 2025  
84 US 169 Mill and overlay from Ojibwe Dr to Garrison $4,500,000 2024  
83 US 10 Mill and overlay from County Road 11 to 3 miles west of Hwy 371 $12,400,000 2029  
83 US 10 Mill and overlay from 4.4 miles west of Clear Lake to 2.2 miles west of Clear Lake $1,200,000 Not Selected Not a district priority. Will continue to monitor pavement performance.
83 US 169 Mill and overlay from north of Mille Lacs County Road 29 to 2.3 miles south of Milaca $9,400,000 2025  
80 MN25 Mill and overlay from north of 14th St to the southern limits of Monticello $5,400,000 2025  
80 MN210 Mill and overlay from Hwy 10 to Pillager $5,000,000 2026  
79 US 10 Mill and overlay from west of Oink Joint Rd to Staples City Limits $13,000,000 2029  
78 MN23 Mill and overlay from east of Stearns County Road 12 to end of bypass $15,100,000 2027  
78 MN101 Mill and overlay from Hennepin/Wright County Line to south of Wright County Road 42 $2,500,000 2025  
77 US 10 Mill and overlay from Main st in Elk River to Hwy 101 in Elk River $400,000 Not Selected Not a district priority. Will continue to monitor pavement performance.
77 US 71 Mill and overlay from 4th St in Sauk Centre to 230th in Long Prairie $13,700,000 2027  
77 US 71 Mill and overlay from Todd/Wadena County line to Franklin Ave in Wadena $3,000,000 2027  
76 US 10 Mill and overlay from Long Prairie River to 50th Ave $17,800,000 2028  
76 MN23 Mill and overlay from District 3/8 border to Hwy 23B $200,000 Not Selected Conditions on the ground are not deteriorating as fast as the model is predicting
76 MN55 Mill and overlay from Hwy 25 to east of Wright County Road 134 $4,200,000 2026  
76 US 71 Mill and overlay from Elm Ave in Wadena to 5th St in Sebeka $10,200,000 2026  
74 US 169 Mill and overlay from south of Hwy 23 in Milaca to North of Mile Drew Brook $8,100,000 2028  
74 MN371 Mill and overlay from Cass County Road 5 in Hackensack to North of Hwy 200 $4,000,000 2025  
71 US 2 Mill and overlay from Cass County Road 206 in Cass Lake to east end of Bridge 5760 $3,200,000 2022  
71 MN23 Mill and overlay from Hwy 25 to Benton County Road 53 $1,400,000 2030  
71 US 169 Mill and overlay from South of Rum River bridge to Reference Pt 204 $700,000 Not Selected Not a district priority. Will continue to monitor pavement performance.
71 MN210 Thick overlay from Pillager to Baxter City Limits $6,500,000 2030  
70 US 71 Mill and overlay from 5th St in Sebeka to Wadena/ Hubbard County line $7,700,000 2027  
70 MN101 Minor rehabilitation from Wright County Road 42 to bridge over Hwy10 $2,100,000 2030  
70 US 169 Mill and overlay from Aitkin County Line to Aitkin County Road 76 $8,500,000 2029  
70 US 169 Milll and overlay from Mill Lacs County Road 103 to Vineland $4,500,000 Not Selected Not a district priority. Will continue to monitor pavement performance.
59 US 2 Thin mill and overlay from Hubbard/Cass County Line to Cass County Road 206 in Cass Lake $2,900,000 2025  
69 MN24 Reclaim and overlay from I-94 ramps to east of Sherburne County Road 8 $600,000 Not Selected Not a district priority. Will continue to monitor pavement performance.
69 MN371 Reclaim and overlay from Steamboat River Bridge to Reference point 112 $8,000,000 2030  
68 MN210 Mill and overlay from east end of Hospital Parking lot to Hwy 6 in Deerwood $4,200,000 2027  
68 MN371 Mill and overlay from Hwy 200  to north of Highland Ave $7,000,000 2027  
65 I94 Mill and overlay from Hwy 24 in Clearwater to North of Albertville $7,600,000 Not Selected Recently resurfaced in 2019
65 MN210 Mill and overlay from Wisconsin ave in Hewitt to Hwy10 $11,200,000 2027  
63 I94 Minor rehabilitation from Douglass/Todd County line to Hwy 71 in Sauk Centre $11,600,000 2030  
63 US 169 Mill and overlay from North end of Mississippi River Bridge to Aitkin County Road 18 $4,800,000 2024 Coordinated with D1 project
63 US 169 Mill and overlay from Aitkin County Road 18 to Hwy 200 in Hill City  $5,000,000 2025 Coordinated with D1 project
61 MN28 Reclaim and overlay from Pope/Stearns County Line to Hwy71 $3,400,000 Not Selected  
60 MN210 Mill and overlay from Ottertail/Todd County Line to Wisconsin Ave in Hewitt $1,400,000 2025  
59 I94 Reclaim and overlay from east limits of Albany to Stearns County Road 159 $14,000,000 2030  
58 MN34 Mill and overlay from Hubbard/Cass County Line to Hwy 371 $3,400,000 2026  
53 MN371 Thick overlay from Hwy 210 to North of Crow Wing County Road 13 $12,100,000 2029  
42 MN23 Mill and overlay from County Road 53 to South end of bridge 48030 $3,200,000 2022 Selected prior to policy (in 2019-2022 STIP)
40 MN15 Mill and overlay from Railroad crossing in Kimball to Hwy 55 $100,000 2021 Selected prior to policy (in 2019-2022 STIP)
40 MN371 Mill and overlay from Hwy 10 to Morrison County Road 48 $9,100,000 2030  
39 MN65 Diamond Grinding from Cambridge to Isanti County Road 30 $800,000 Not Selected  
37 US 10 Mill and overlay from Becker County Road 40 to Railroad crossing in Saint Cloud $10,200,000 2029  
37 US 71 Reclaim and overlay from North of Hwy 55 in Belgrade to bridge over I-94 $5,900,000 Not Selected  
32 US 169 Unbonded overlay from Hwy 210 to North end of Mississippi River Bridge  $1,900,000 2022 Selected prior to policy (in 2019-2022 STIP)
20 MN23 Medium mill and overlay from Hwy 23B to 1.1 miles east of County Road 12 $2,000,000 2022 Part of D8 project in 2022

Score Route Description  High level construction  cost estimate for planning purposes  Year Planned (FY) Comments
100 I-94 Medium mill and overlay from Melrose to Albany $23,000,000 2027  
90 I-94 Medium mill and overlay from Sauk Centre to Melrose $18,000,000 2026  
89 MN371 Reclaim and overlay from Railroad crossing near Highway 210 to Crow Wing County Road 13 $14,000,000 2029  
88 US10 Medium mill and overlay from Big Lake to 185th Ave $11,000,000 2028  
85 MN23 Meium mill and overlay from 93rd Ave to Highway 15 $8,900,000 2026  
83 US10 Medium mill and overlay from Morrison County Road 35 to Benton County Road 40 $14,000,000 2027  
83 MN210 Reclaim and overlay from Hewitt to Highway 10 $10,000,000 2028  
83 MN23 Reclaim and overlay from District 3/District 8 boundary to Becker Lake $6,600,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
82 US169 Medium mill and overlay from Ojibwe Dr to Pike Road $8,100,000 2024  
82 US169 Medium mill and overlay from Milaca to Mike Drew Brook $9,500,000 2029  
82 MN55 Reclaim and overlay from Highway 24 to Highway 25 $10,000,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
81 US169 Medium mill and overlay from Highway 10 to 253rd Ave $11,000,000 Not Selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
81 US12 Medium mill and overlay from Howard Lake to Aetna Ave $5,100,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
80 US10 Reconstruction from railroad crossing in Saint Cloud to 15th Ave $11,000,000 2023  
80 MN25 Medium mill and overlay from I-94 to Highway 10/Lake St $4,800,000 2029 Coordinated with an urban pavement project in Monticello
80 US10 Medium mill and overlay from south of 46th St to north of 76th St in Clear Lake $1,200,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
79 MN25 Medium mill and overlay from 14th St to Monticello $5,400,000 2025  
79 US10 Medium mill and overlay from Highway 371 to Morrison County Road 35 $6,800,000 2025  
78 US10 Medium mill and overlay from Benton County Road 40 to Benton County Road 33 $10,000,000 2029  
78 MN23 Medium mill and overlay from Benton County Highway 1 to Highway 95 $3,900,000 Not Selected Not a current district priority, but will continue to monitor pavement performance
77 MN23 Medium mill and overlay from 4th Ave to Stearns County Highway 1 $22,000,000 2023
77 MN115 Medium mill and overlay from Randall to Camp Ripley Entrance $2,600,000 2024
77 MN371 Thin mill and overlay from Highway 10 to Morrison County Highway 48 $5,400,000 Not Selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
77 US12 Medium mill and overlay from Delano to Wright/Hennepin County line $1,100,000 Not Selected Project is too short in length to be cost effective as a standalone project
77 MN15 Reclaim and overlay from Kimball Railroad crossing to Highway 55 $300,000 Not Selected Project is too short in length to be cost effective as a standalone project
76 MN23 Medium mill and overlay from Bridge 48030 to Highway 47/Ogilvie $8,100,000 2024
76 US169 Medium mill and overlay from Mille Lacs County Highway 29 to Highway 23 $8,600,000 2025
76 US10 Medium mill and overlay in multiple locations $3,300,000 2025
76 MN15 Medium mill and overlay from Stearns County Highway 47 to Highway 23/Division st $5,900,000 Not Selected Less than 1 mile of this project is predicted to be in poor condition by 2029. 
75 MN210 Medium mill and overlay from Golf Course Road to Brainerd/Highway 25 $14,000,000 2025
75 MN55 Medium mill and overlay from Highway 25 to Calder Ave $4,400,000 2026
75 US71 Medium mill and overlay from Sauk Centre to Long Prairie $14,000,000 2027
75 MN371 Medium mill and overlay from Highway 200 to Highway 34 $6,200,000 2027
75 US10 Medium mill and overlay from Oink Joint Road to Staples $18,000,000 2027
75 MN23 Medium mill and overlay  from Stearns County Road 12 to West of 33rd Ave $15,000,000 2027
75 MN95 Medium mill and overlay from Davis St to Isanti County Highway 2 $1,100,000 Not Selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
72 MN101 Medium mill and overlay from Hennepin/Wright County line to County Road 42 $4,500,000 2026 Selected prior to policy (in 2019-2028 CHIP)
71 MN27 Medium mill and overlay from 9th St to Little Falls $1,000,000 2027 Selected prior to policy (in 2019-2028 CHIP)
71 US169 Reclaim and overlay from Mille Lacs County Highway 9 to Mille Lacs County Road 103 $6,300,000 Not Selected
70 US71 Medium mill and overlay from Todd/Wadena County line to Franklin Ave  $3,300,000 2028 Selected prior to policy (in 2019-2028 CHIP)
70 US10 Medium mill and overlay from Morrison County Road 11 to Highway 371 $13,000,000 2029 Selected prior to policy (in 2019-2028 CHIP)
70 MN371 Medium mill and overlay from Crow Wing/Cass County line to Cass County Highway 2 $2,800,000 Not Selected
69 MN15 Reclaim and overlay from Highway 55 to Stearns County Highway 47 $8,900,000 Not Selected
68 US10 Thin mill and overlay from Staples to 1st Ave NE $2,900,000 2027 Selected prior to policy (in 2019-2028 CHIP)
68 US169 Medium mill and overlay from Vineland to Ojibwe Dr $1,100,000 Not Selected
67 US2 Thin mill and overlay from Hubbard/Cass County line to Cass County Highway 206 $2,900,000 2025 Selected prior to policy (in 2019-2028 CHIP)
66 US71 Medium mill and overlay from Red Eye River to Wadena/Hubbard County line $7,800,000 2027 Selected prior to policy (in 2019-2028 CHIP)
66 MN34 Medium mill and overlay from Hubbard Cass County line to Highway 371 $3,400,000 Not Selected
65 MN101 Minor concrete pavement rehabilitation from County Road 42 to Mississippi River bridge $2,000,000 Not Selected
65 US169 Medium mill and overlay from Mike Drew Bridge to reference post 204 $4,300,000 Not Selected
65 US169 Medium mill and overlay from Highway 27 to Vineland $4,000,000 Not Selected
64 US12 Major concrete pavement rehabilitation/diamond grinding from Meeker/Wright County line to west Cokato city limits $1,200,000 2024 Selected prior to policy (in 2019-2028 CHIP)
63 US169 Medium mill and overlay from Mille Lacs County Road 103 to Highway 27 $5,200,000 Not Selected
60 MN371B Reconstruction from Ostrowski way to Cedar St in Brainerd $6,000,000 2023 Selected prior to policy (in 2019-2028 CHIP)
58 I-94 Reclaim and overlay from Albany to Stearns County Highway 159 $12,000,000 2029 Selected prior to policy (in 2019-2028 CHIP)
58 MN101 Medium mill and overlay from Mississippi River Bridge to Bridge over Highway 10 $300,000 Not Selected
56 MN210 Medium mill and overlay from End of Hospital Parking lot to Deerwood/End of Highway 6 $2,700,000 2028 Selected prior to policy (in 2019-2028 CHIP)
56 MN6/MN24/MN27 Thin overlay $1,600,000 Not Selected
53 I-94 Unbonded overlay from MnRoad facility to Albertville $11,400,000 2025 Selected prior to policy (in 2019-2028 CHIP)
48 US10 Minor concrete pavement rehabilitation from Highway 24 to Big Lake $3,100,000 Not Selected
48 MN15 Thin mill and overlay from 12th St to Stearns County Highway 33 $1,800,000 Not Selected  
47 US10 Diamond Grinding from 185th to Elk River $500,000 Not Selected  
46 MN210 Thin mill and overlay from Highway 10 to Stearns County Highway 1 $4,300,000 2026 Selected prior to policy (in 2019-2028 CHIP)
44 US10 Medium mill and overlay from Wadena/Otter tail County Line to West of Oink joint Road $1,800,000 Not Selected  
42 US10 Medium mill and overlay from Long Prairie River to 50th Ave $15,000,000 2029 Selected prior to policy (in 2019-2028 CHIP)
40 MN371 Medium mill and overlay from Cass County Highway 40 to Highway 200 $6,100,000 2025 Selected prior to policy (in 2019-2028 CHIP)
39 US71 Medium mill and overlay from Wadena to Sebeka $13,000,000 2026 Selected prior to policy (in 2019-2028 CHIP)
38 I-94 Unbonded overlay from MnROAD facility to Highway 241 bridge $16,000,000 Not Selected
38 I-94 Reconstruction from Stearns/Wright County line to Wright County Highway 39 $180,000,000 Not Selected
36 I-94 Major concrete pavement rehabilitation/diamond grinding from Meeker/Wright County line to west Cokato city limits $20,000,000 2027 Selected prior to policy (in 2019-2028 CHIP)
35 US71 Reclaim and overlay from Highway 55 to I-94 $14,000,000 Not Selected
35 MN95 Thin mill and overlay from County Road 14 to Fern St $300,000 Not Selected
33 MN210 Medium mill and overlay from Ottertail /Todd County line to Hewitt $1,400,000 2025 Selected prior to policy (in 2019-2028 CHIP)
28 US71 Reclaim and overlay from Kandiyohi/Stearns Co line to Highway 55 $2,200,000 Not Selected
25 US10 Reclaim and overlay from Highway 24 to Lakeshore Dr $11,000,000 Not Selected
20 Multiple Multiple small fixes on Highways 27, 169 and 71 $2,400,000 Not Selected
16 MN23 Unbonded overlay from Highway 25 to Bridge 48030 $24,000,000 Not Selected
16 MN210 Unbonded overlay from Ripple River Bridge to Highway 169 $13,000,000 Not Selected
15 MN25 Medium mill and overlay from Highway 55 to 14th St $400,000 Not Selected
14 MN210 Crack Seal and thick overlay from Benton County Highway 1 to Baxter City Limits $6,100,000 2029 Selected prior to policy (in 2019-2028 CHIP)
14 US12 Medium mill and overlay from Aetna Ave to 72nd st $3,600,000 Not Selected
14 MN210 Major concrete pavement rehabilitation/diamond grinding from Highway 6 to Highway 160/Aitkin $8,000,000 Not Selected
12 US12 Medium mill and overlay from Cokato city limits to Oliver St $900,000 Not Selected  
11 US169 Medium mill and overlay from Mississippi River Bridge to Highway 200/Hill City  $10,000,000 2024 Selected prior to policy (in 2019-2028 CHIP)- Funded by District 1, in District 3 construction district
10 MN210 Reclaim and overlay from Highway 25/Brainerd to 6th Ave/Ironton $16,000,000 Not Selected  
9 MN210 Medium mill and overlay from west of Aitkin to Ripple River Bridge $500,000 2028 Selected prior to policy (in 2019-2028 CHIP)
9 US2 Thick mill and overlay from Cass County Highway 206 to Bridge 5760 $12,000,000 Not Selected  
9 US169 Medium mill and overlay Highway 210 to North end of Mississippi river Bridge  $1,530,000 Not Selected  
7 US71 Thin mill and overlay from Long Prairie to Todd County Road 56 $300,000 Not Selected  
5 US10 Micro surfacing from Cleveland to Sherburne/Anoka County line $200,000 Not Selected