Minnesota Department of Transportation

511 Travel Info

Traffic Engineering

traffic engineering workers

Pavement marking typical detail sheets

Pavement Marking Plans for MnDOT projects follow a general style and format. The typical details listed on this page represent the recommended pavement marking design; they may be added to the blank plan sheet border (see below) when assembling a Pavement Marking Plan for a particular project. Reference files are available in PDF and DGN formats to be imported into any pavement marking plan.

  • The Pavement Marking Typical Sample Plan below may be used as reference for designing a Pavement Marking Plan for a MnDOT project, although each MnDOT District may have slightly different formats developed.
  • When making modifications to these details, designers should review the MNMUTCD and Chapter 7 of the TEM.
  • If a typical detail is edited to comply with project specific construction situations, a revision date should be noted in the space provided on the detail.
  • DESIGNER NOTES are included on most typical details. The designer should use them to make appropriate design considerations. When the final pavement marking plan sheets are placed into the construction plans, all variables should be determined and entered directly on the sheet(s), and all designer notes shall be removed from the sheets.

Downloadable files

PLEASE NOTE: The CADD files were created in Microstation Version 7 format; levels, colors and some legend symbols may not be up to current CADD standards. These details will be updated on a continuous basis. It is recommended that a designer retrieves the most current version of any detail before beginning the "Pavement Marking Plan" design process.

  • Files available in Microstation format (DGN) or Adobe Reader format (PDF)
  • To remove DESIGNER NOTES in the DGN files, turn off the CAPT BLK level
  • The latest sheet revision date (MM.DD.YY) is shown
  • Please report any errors or suggested changes to the Pavement Marking Engineer at traffic.dot@state.mn.us
Detail description Current 6" details Historical 4" details

 

Historical details

 

Title sheet

Title sheet (DGN) and

Title sheet (PDF)

10.24.22

DGN

PDF

5.17.19

DGN

PDF

1.8.18

DGN

PDF

1.8.18

DGN

PDF

1.17.19

Pay tab sheet

 

Pay tab sheet (DGN) and Pay tab sheet (PDF)

11.16.21

DGN

PDF

1.10.18

 
Blank sheet

Blank sheet (DGN) and Blank sheet (PDF)

11.16.21

DGN

PDF

11.20.15

 
Interim striping

Interim Pavement Marking Typical Detail is now Standard Plan

5-297.801

Interim Pavement Marking Typical Detail is now Standard Plan

5-297.801

DGN

PDF

1.10.18

Lane markings (six layouts)

Lane markings (DGN) and Lane markings (PDF)

11.16.21

DGN

PDF

10.14.16

DGN

PDF

11.20.15

Turn lanes (seven layouts)

Turn lanes (DGN) and Turn lanes (PDF)

11.16.21

DGN

PDF

3.23.20

DGN

PDF

4.6.18

 

DGN

PDF

10.14.16

DGN

PDF

11.20.15

Freeway-expressway entrance ramps (four layouts)

 

Freeway-expressway entrance ramps (DGN) and Freeway-expressway entrance ramps (PDF)

11.16.21

DGN

PDF

11.20.15

 
Freeway-expressway exit ramps (eight layouts)

Freeway-expressway exits (DGN) and Freeway-expressway exits (PDF)

9.13.23

DGN

PDF

11.20.15

 
Freeway-expressway auxiliary lanes between ramps (three layouts)

Freeway-expressway auxiliary lanes between ramps (DGN) and Freeway-expressway auxiliary lanes between ramps (PDF)

11.16.21

DGN

PDF

11.20.15

 

Lane drops at intersections (three layouts)

Lane drops at intersections (DGN) and Lane drops at intersections (PDF)

11.16.21

DGN

PDF

10.14.16

DGN

PDF

11.20.15

Line extensions through intersections (five layouts)

Line extensions through intersections (DGN) and Line extensions through intersections (PDF)

11.16.21

DGN

PDF

3.27.20

DGN

PDF

5.17.16

 

DGN

PDF

11.20.15

Passing & transition lanes (four layouts)

Passing & transition lanes (DGN) and Passing & transition lanes (PDF)

11.16.21

DGN

PDF

11.20.15

 

Obstructions in roadway (two layouts)

Obstructions in roadway (DGN) and Obstructions in roadway (PDF)

11.16.21

DGN

PDF

11.20.15

 
Crosswalks (five layouts)

Crosswalks (DGN) and Crosswalks (PDF)

11.16.21

DGN

PDF

5.29.18

 
Parking (seven layouts)

Parking (DGN) and Parking (PDF)

11.16.21

DGN

PDF

5.15.19

DGN

PDF

11.20.15

Acceleration & bypass lanes (two layouts)

Acceleration & bypass lanes (DGN) and Acceleration & bypass lanes (PDF)

11.16.21

DGN

PDF

4.6.18

DGN

PDF

10.14.16

DGN

PDF

6.1.16

DGN

PDF

11.20.15

Truck climbing (one layout)

Truck climbing (DGN) and Truck climbing (PDF)

11.16.21

DGN

PDF

11.20.15

 
Free rights (three layouts)

Free rights (DGN) and Free rights (PDF)

11.16.21

DGN

PDF

11.20.15

 
R-Cuts and J-Turns (three layouts)

R-Cuts and J-Turns (DGN) and R-Cuts and J-Turns (PDF)

11.16.21

DGN
PDF

5.18.18

DGN

PDF

1.29.18

 

DGN

PDF

2.17.16

Diverging diamond (one layout)

Diverging diamond (DGN) and Diverging diamond (PDF)

11.16.21

DGN

PDF

11.20.15

 
Narrow bridge (one layout)

Narrow bridge (DGN) and Narrow bridge (PDF)

11.16.21

DGN

PDF

11.20.15

 
Rumble strips and stripes (seventeen layouts)

Rumble strips and stripes (DGN) and Rumble strips and stripes (PDF)

12.19.22

DGN

PDF

8.21.17

 

 
Roundabouts (seven layouts)

Roundabouts (DGN) and Roundabouts (PDF)

11.16.21

DGN

PDF

3.30.18

 

Airplane & railroad (two layouts)

Airplane & railroad (DGN) and Airplane & railroad (PDF)

11.16.21

DGN

PDF
4.13.18

DGN

PDF

1.19.17

DGN

PDF

11.20.15

Character areas, stop bar, yield & crosshatch (five layouts)

Character areas, stop line, yield & crosshatch (DGN) and Character areas, stop line, yield & crosshatch (PDF)

11.16.21

DGN

PDF

02.28.20

DGN

PDF
10.22.19

DGN

PDF

1.19.17

DGN

PDF

11.20.15

Managed and Preferential Lanes (three layouts)

Managed and Preferential Lanes (DGN) and Managed and Preferential Lanes (PDF)

11.16.21

   
Bike Lane Bike lane (DGN) and Bike lane (PDF)
9.20.22
   
No passing zone terminal post (one layout)

No passing zone terminal post (DGN) and No passing zone terminal post (PDF)

10.10.23